1641 Broadway
Brooklyn, NY 11207BBL 3-03414-0002Map
Owner of record: Bright Moon 1641 LLC
1641 Broadway is a mixed residential and retail building built in 1931 in Brooklyn, 11207. It has 5 residential units across 4 floors. The owner of record is Bright Moon 1641 LLC. HPD has recorded 85 housing violations here, most recently on July 2, 2025. 1 of the 50 most recent violations are still open.
- HPD violations
- 85
- DOB violations
- 1
- ECB violations
- 8
- HPD complaints
- 84
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 85
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Jul 2, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Jul 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing locking assembly at building entrance door
Jul 2, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system in the entire apartment located at apt 4r, 4th story, 1st apartment from north at east
Nov 28, 2023 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east
Nov 28, 2023 · Apt 4R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4r, 4th story, 1st apartment from north at east
Nov 28, 2023 · Apt 4R
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of wood cabinet at public hall, 4th story
Nov 28, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall at public hall, 4th story
Nov 28, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at north wall at public hall, 4th story
Nov 28, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 4th story
Nov 28, 2023
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Nov 28, 2023
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at floor at public hall, 2nd story
Nov 28, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east original violation 16458200 issued 28-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 28, 2023 · Apt 4R
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east
Nov 28, 2023 · Apt 4R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 1st room from east at north located at apt 4r, 4th story, 1st apartment from north at east
Nov 28, 2023 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door to room providing access to fire escape in apartment 2f in the 1st room from north located at apt bldg, 2nd story, apartment at east
Dec 20, 2021 · Apt BLDG
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door to room providing access to fire escape in the 1st room from north located at apt 3f, 3rd story, apartment at south
Dec 20, 2021 · Apt 3F
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2018
Closed — Violation dismissed - BHazardous
Remove the illegal fastening consisting of key operated double cylinder lock at building entrance door at public hall, 1st story
May 25, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 25, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 25, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
May 25, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2016
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder door lock on metal security door at building entrance, , 1st story
Aug 3, 2016
Closed — Violation closed - BHazardous
Replace with new the missing electric light fixture on east wall at vestibule, at public hall, 1st story
Aug 3, 2016
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of sealed skylight at roof, at public hall, 4th story
Aug 3, 2016
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen located at apt 3l, 5th story, 1st apartment from south at west
Jun 3, 2016 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3l, 5th story, 1st apartment from south at west
Jun 3, 2016 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 3l, 5th story, 1st apartment from south at west
Jun 3, 2016 · Apt 3L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 3l, 5th story, 1st apartment from south at west
Jun 3, 2016 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 2; located at apt 3l, 3rd story, 1st apartment from west at north
Jun 3, 2016 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 3l, 3rd story, 1st apartment from west at north
Jun 3, 2016 · Apt 3L
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3l, 3rd story, 1st apartment from west at north
Jun 3, 2016 · Apt 3L
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 7, 2015
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story
Jan 19, 2014
Closed — Violation closed - BHazardous
Replace with new the missing skylight at roof over the 4th sty public hall
Jan 19, 2014
Closed — Violation closed - BHazardous
Properly repair the broken or defective light switch and electrical outlet combination at west wall in the bathroom located at apt 3l, 3rd story, apartment at north
Jan 19, 2014 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood treads 9th,10th,and11th up from bottom at stairs 2nd to 3rd sty at public hall
Jan 19, 2014
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at iron security door front entrance to building
Jan 19, 2014
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling at public hall, 4th story
Jan 19, 2014
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 3l, 3rd story, apartment at north
Jan 19, 2014 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3l, 3rd story, apartment at north
Jan 19, 2014 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st door frame from west at north wall, north wall, south wall, west wall in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 2nd door frame from west at north wall, south wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 4th room from north located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 2; located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperative located at apt 3r, 3rd story, 1st apartment from north at east
Jan 7, 2014 · Apt 3R
Closed — Violation closed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed
ECB violations · 8
- Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35362630k issued on 12/4/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for:failure to provide saf
Jan 16, 2019
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35362631m issued on 12/4/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for:failure to maintain fr
Jan 16, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35362633x issued on 12/7/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for:tampered w/ removed a
Jan 16, 2019 · Penalty $1,250
Resolve - Class - 1
Tampered w/removed a written posted stop work order. at time of inspection observed they remove the written posted stop work order#35362631m35362629n & 35362630k & posted new written posted stop work order.
Dec 7, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to provide safety manager present at construction site: at inspection time observed 5 workers performing work & i ask for the approved plans but the responsed the boss is no here,unable to provide the
Dec 4, 2018
Resolve - Class - 2
Work to conform to dob documents: at time of inspection no plan at site to verify of everything is performing conform to the permit#321668557-01-pl issued on 5-10-18 & exp 5-10-19. they performing construction
Dec 4, 2018 · Penalty $625
Resolve - Class - 1
Failure to maintain: at the inspection time address the bldg & observed at 3 fl at exp#1 exterior wall a crack brick wall & also the crack is continuing bracking the lintel,also on back of the bldg observed the
Dec 4, 2018 · Penalty $312
Resolve - Hazardous
Failure to safely and properly remove material/debris from construction site. there is excessive debris at rear yard, created hazardous condition and obstructed access to the rear yard. remedy: stop all work
Mar 29, 2006
Resolve
Complaints
- Door/window
Door
Jan 30, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 28, 2025 · Apt 4R
Close - Unsanitary condition
Pests
Mar 18, 2025 · Apt 3F
Close - Plumbing
Bathtub/shower
Mar 18, 2025 · Apt 3F
Close - Water leak
Slow leak
Jun 1, 2024 · Apt 2F
Close - Water leak
Slow leak
May 4, 2024 · Apt 2F
Close - Heat/hot water
Entire building
Jan 20, 2024 · Apt 4R
Close - Paint/plaster
Ceiling
Nov 22, 2023 · Apt 4R
Close - Water leak
Slow leak
Nov 22, 2023 · Apt 4R
Close - General
Bell/buzzer/intercom
Nov 22, 2023 · Apt 4R
Close
Show 40 more ↓
- Plumbing
Radiator
Nov 22, 2023 · Apt 4R
Close - Unsanitary condition
Mold
Nov 22, 2023 · Apt 4R
Close - Paint/plaster
Wall
Nov 22, 2023 · Apt 4R
Close - Heat/hot water
Entire building
Jan 9, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Dec 19, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 1, 2021 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 27, 2021 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 13, 2021 · Apt 2F
Close - Heat/hot water
Entire building
Feb 29, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 1, 2019 · Apt 2R
Close - Heat/hot water
Entire building
Nov 10, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
May 24, 2018 · Apt 4L
Close - Heat/hot water
Apartment only
May 22, 2018 · Apt 4R
Close - Heat/hot water
Apartment only
Mar 24, 2018 · Apt 4R
Close - Door/window
Window pane
Jul 28, 2016 · Apt 2R
Close - Door/window
Window pane
Jul 28, 2016 · Apt 2R
Close - Door/window
Door
Jul 28, 2016 · Apt PH
Close - Outside building
Roof door/hatch
Jul 28, 2016 · Apt PH
Close - Outside building
Skylight
Jul 28, 2016 · Apt PH
Close - General
Signage missing
Jul 28, 2016 · Apt PH
Close - Plumbing
Basin/sink
May 31, 2016 · Apt 3L
Close - Water leak
Slow leak
May 31, 2016 · Apt 3L
Close - Paint/plaster
Ceiling
May 31, 2016 · Apt 3L
Close - Unsanitary condition
Mold
May 31, 2016 · Apt 3L
Close - Unsanitary condition
Pests
May 31, 2016 · Apt 3L
Close - Flooring/stairs
Floor
May 31, 2016 · Apt 3L
Close - Appliance
Electric/gas range
May 31, 2016 · Apt 3L
Close - Flooring/stairs
Floor
May 31, 2016 · Apt 3L
Close - Plumbing
Basin/sink
May 31, 2016 · Apt 3L
Close - General
Signage missing
Feb 19, 2016 · Apt PH
Close - Door/window
Door
Feb 19, 2016 · Apt PH
Close - Flooring/stairs
Floor
Feb 19, 2016 · Apt 4R
Close - Water leak
Damp spot
Feb 19, 2016 · Apt PH
Close - Outside building
Skylight
Feb 19, 2016 · Apt PH
Close - Flooring/stairs
Floor
Feb 19, 2016 · Apt PH
Close - Paint/plaster
Ceiling
Feb 19, 2016 · Apt 4R
Close - Paint/plaster
Ceiling
Feb 19, 2016 · Apt 4R
Close - Paint/plaster
Wall
Feb 19, 2016 · Apt 4R
Close - General
Mailbox
Jul 22, 2014 · Apt 3R
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 18, 2026 | $2,250,000 | Rentals - 4-10 unit | 6 |
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1931
- Floors
- 4
- Residential units
- 5
- Building area
- 6,900 ft²
- Lot area
- 2,221 ft²
- Zoning
- C8-2
- Community board
- 304
- Council district
- 37
- Block / lot
- 3414 / 2
- Assessed value
- $597,600
- Landmark / historic district
- No
HPD registration #357280, last renewed Jul 16, 2025.
Questions about 1641 Broadway
Who owns 1641 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Bright Moon 1641 LLC.
Does 1641 Broadway have violations?
Yes. NYC HPD has recorded 85 housing violations at this property.
Is 1641 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1641 Broadway built?
City records list 1931 as the year it was built.
How many apartments are in 1641 Broadway?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.