roofy

1319 Halsey Street

Brooklyn, NY 11237BBL 3-03406-0045Map

Owner of record: Taylor Wythe 2 LLC

1319 Halsey Street is a walk-up apartment building built in 1907 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is Taylor Wythe 2 LLC. HPD has recorded 37 housing violations here, most recently on May 4, 2026.

HPD violations
37
DOB violations
14
ECB violations
4
HPD complaints
188

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 37

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the mattress, cabinet, washbasin ,cardboard and household garbages at building front court yard

    Aug 29, 2024

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling ...west wall in the 2nd room from east located at apt 3r, 3rd story, 2nd apartment from south at west

    Apr 9, 2023 · Apt 3R

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Apr 9, 2023 · Apt 2L

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Apr 9, 2023 · Apt 2L

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 9, 2021

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of door with key operated lock preventing entrance to egress door in the 5th room from east located at apt 1l, 1st story, 1st apartment from east at south

    Oct 10, 2017 · Apt 1L

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)

    Oct 7, 2016

    Closed — Violation dismissed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing metal tread 3rd & 5th up from bottom at 2nd to 3 sty rear balcony at fire escape

    Apr 24, 2014

    Closed — Violation closed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing metal tread 1st up from bottom at 1st to 2nd sty rear balcony at fire escape

    Apr 24, 2014

    Closed — Violation closed
Show 27 more ↓
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate , in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south

    Dec 21, 2013 · Apt 1L

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south

    Dec 21, 2013 · Apt 1L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1l, 1st story, 1st apartment from east at south

    Dec 21, 2013 · Apt 1L

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1l, 1st story, apartment at south

    Sep 17, 2013 · Apt 1L

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of remove moldy carpet under wood floor in the 1st room from east located at apt 1l, 1st story, apartment at south

    Sep 17, 2013 · Apt 1L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1l, 1st story, apartment at south

    Sep 17, 2013 · Apt 1L

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective located at apt 1l, 1st story, apartment at south

    Sep 17, 2013 · Apt 1L

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 1r, 1st story, 1st apartment from north at east

    Nov 21, 2012 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperable located at apt 1r, 1st story, 1st apartment from north at east

    Nov 21, 2012 · Apt 1R

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective glass at building entrance door , 1st story

    Sep 19, 2011

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, east wall in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    May 28, 2011 · Apt 1L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the 2nd room from north located at apt 1l, 1st story, 1st apartment from south at west

    May 28, 2011 · Apt 1L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, east wall in the 4th room from north located at apt 1l, 1st story, 1st apartment from south at west

    May 28, 2011 · Apt 1L

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required***

    May 22, 2011

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from south at west

    Mar 1, 2011 · Apt 1L

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Jan 31, 2011 · Apt 1R

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Jan 31, 2011 · Apt 1R

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of roaches located at apt 1r, 1st story, 1st apartment from north at east

    Jan 11, 2011 · Apt 1R

    Closed — Violation dismissed
  • B

    Discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system ... in the entire apartment located at apt 1l, 1st story, apartment at west

    Feb 2, 2009 · Apt 1L

    Closed — Violation closed
  • B

    Discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system .... in the entire apartment located at apt 3l, 3rd story, apartment at west

    Feb 2, 2009 · Apt 3L

    Closed — Violation dismissed
  • B

    Discontinue use of illegal space and/or hot water heater and provide filed for & approved heater which obtains combustion air directly from outside the building or approved central system .... in the entire apartment located at apt 3r, 3rd story, apartment at east

    Feb 2, 2009 · Apt 3R

    Closed — Violation closed
  • B

    § 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling throughout

    Sep 19, 2007

    Closed — Violation dismissed
  • C

    Device present on central heating system which is capable of causing an otherwise operable system to become inoperable heat timer illegally set on manual at boiler room, basement

    Feb 22, 2000

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation front roof cornice

    May 20, 1999

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective boiler room cellar

    Sep 8, 1998

    Closed — Violation dismissed
  • B

    D26-10.01 adm code properly repair with similar material the broken or defective fire retarding plasterboard ceiling cellar rear.

    Jun 24, 1993

    Closed — Violation dismissed
  • B

    D26-10.01, 10.05 adm code arrange and make self-closing the doors at bottom 1 sty pub hall to cellar stairs.

    Jun 24, 1993

    Closed — Violation dismissed

DOB building violations · 14

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
Show 4 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    B254 15.34b.32a.36.4a.50a thru-50f 50a boiler rm door hot fire proof 50b back flow preventor missing on feed eater line 50c no check valve ion feed water line 50d pipe safety or relief valve discharge down no

    Jul 17, 2009

    Resolve
  • Class - 2

    B201 50a.50b 50a work w/o a permit 28-105.1 50b no work permit filed w/ dob for the instalation of new boiler i the apt

    Jul 17, 2009

    Resolve
  • Class - 1

    Wrk w.o perm observed @ apt3l by instlng boiler "laars"flue vent exhaust to front of bldng.same boilers installed in 3r,2l,2r-same vent exhaust-no permit found on dob files. used wrong type flue pipe.mech room

    Feb 6, 2009

    Resolve
  • Class - 1

    Work w/o a permit. work noted: at apt 3r,3l,2r installed water & electrical lines for a self contained oil fired heating unit installed metal ducting through exterior wall to vent unit. vent discharge is flowin

    Feb 5, 2009

    Resolve

Complaints

  • Door/window

    Door

    Jun 13, 2025 · Apt 3L

    Close
  • Unsanitary condition

    Mold

    Aug 28, 2024 · Apt 1L

    Close
  • Water leak

    Slow leak

    Aug 28, 2024 · Apt 1L

    Close
  • Water leak

    Heavy flow

    Aug 4, 2024 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Nov 25, 2023 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2023 · Apt 2L

    Close
  • Electric

    Lighting

    Jul 18, 2022 · Apt 3R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 15, 2019 · Apt 3R

    Close
  • General

    Floor

    Sep 12, 2013 · Apt 1L

    Close
  • Electric

    Lighting

    Nov 13, 2012 · Apt 1R

    Close
Show 40 more ↓
  • Electric

    Electric-supply

    Nov 13, 2012 · Apt 1R

    Close
  • Electric

    Wiring

    Nov 13, 2012 · Apt 1R

    Close
  • Electric

    Wiring

    Nov 13, 2012 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Dec 28, 2011 · Apt 1R

    Close
  • Nonconst

    Vermin

    Dec 28, 2011 · Apt 1R

    Close
  • Plumbing

    Water-leaks

    Dec 28, 2011 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Dec 28, 2011 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Dec 28, 2011 · Apt 1R

    Close
  • Plumbing

    Water-leaks

    Dec 28, 2011 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Dec 28, 2011 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Dec 28, 2011 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Dec 28, 2011 · Apt 1R

    Close
  • Nonconst

    Vermin

    Dec 28, 2011 · Apt 1R

    Close
  • Electric

    Wiring

    Nov 23, 2011 · Apt 2L

    Close
  • Electric

    Lighting

    Nov 23, 2011 · Apt 2L

    Close
  • Nonconst

    Vermin

    Nov 23, 2011 · Apt 2L

    Close
  • Nonconst

    Vermin

    Nov 23, 2011 · Apt 2L

    Close
  • General

    Stairs

    Nov 23, 2011 · Apt 2L

    Close
  • General

    Floor

    Nov 23, 2011 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Nov 23, 2011 · Apt 2L

    Close
  • Appliance

    Refrigerator

    Oct 24, 2011 · Apt 2L

    Close
  • Plumbing

    Water-leaks

    Sep 6, 2011 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Sep 6, 2011 · Apt 1R

    Close
  • Nonconst

    Vermin

    Sep 6, 2011 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Sep 6, 2011 · Apt 1R

    Close
  • Plumbing

    Water-leaks

    Dec 21, 2010 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Dec 21, 2010 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Dec 21, 2010 · Apt 1R

    Close
  • Nonconst

    Vermin

    Nov 9, 2010 · Apt 1R

    Close
  • Nonconst

    Vermin

    Nov 9, 2010 · Apt 1R

    Close
  • Plumbing

    Water-leaks

    Nov 9, 2010 · Apt 1R

    Close
  • General

    Cabinet

    Nov 1, 2010 · Apt 1R

    Close
  • Plumbing

    Shower-stall

    Nov 1, 2010 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Nov 1, 2010 · Apt 1R

    Close
  • General

    Floor

    Nov 1, 2010 · Apt 1R

    Close
  • Nonconst

    Vermin

    Nov 1, 2010 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Jun 2, 2010 · Apt 1L

    Close
  • General

    Mold

    Jun 2, 2010 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Jun 2, 2010 · Apt 1L

    Close
  • General

    Cabinet

    Jun 2, 2010 · Apt 1L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1907
Floors
3
Residential units
6
Building area
5,460 ft²
Lot area
2,633 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3406 / 45
Assessed value
$561,600
Landmark / historic district
No

HPD registration #311427, last renewed Nov 3, 2025.

Questions about 1319 Halsey Street

Who owns 1319 Halsey Street?

The owner of record in NYC Department of City Planning PLUTO data is Taylor Wythe 2 LLC.

Does 1319 Halsey Street have violations?

Yes. NYC HPD has recorded 37 housing violations at this property.

Is 1319 Halsey Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1319 Halsey Street built?

City records list 1907 as the year it was built.

How many apartments are in 1319 Halsey Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.