roofy

1324 Hancock Street

Brooklyn, NY 11237BBL 3-03399-0012Map

Owner of record: 1324 Hancock LLC

1324 Hancock Street is a walk-up apartment building built in 1909 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 1324 Hancock LLC. HPD has recorded 52 housing violations here, most recently on June 26, 2025. 2 of the 50 most recent violations are still open.

HPD violations
52
DOB violations
21
ECB violations
3
HPD complaints
134

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 26, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 52

  • C

    Properly repair with similar material the broken or defective at metal tread 3rd up from bottom landing at building front

    Jun 26, 2025

    Closed — Violation dismissed
  • B

    Properly secure the loose at wood tread 3rd up from bottom landing at public hall stairs, 1st story

    Jun 26, 2025

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at the east wall in the 5th room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at the east and south walls in the 5th room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair the roof so that it will not leak over the ceiling in the 1st room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective door lock in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective bell buzzer in the entrance located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 21, 2023 · Apt 3L

    Open — Civ14 mailed
  • B

    Arrange and make self-closing the doors at bulkhead

    Nov 20, 2018

    Closed — Violation dismissed
  • C

    Remove the illegal fastening lockable slide bolt at door at bulkhead

    Nov 20, 2018

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the 5th room from north located at apt 1l, 1st story, 1st apartment from east at south

    Jun 7, 2018 · Apt 1L

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the 5th room from north located at apt 1l, 1st story, 1st apartment from east at south

    Jun 7, 2018 · Apt 1L

    Closed — Violation closed
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods .. at 1st fire escape from east at north

    Jun 7, 2018

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south

    Jun 7, 2018 · Apt 1L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ..the ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from east at south

    Jun 7, 2018 · Apt 1L

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective located at apt 1l, 1st story, 1st apartment from east at south

    Jun 7, 2018 · Apt 1L

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1l, 1st story, 1st apartment from east at south

    Jun 7, 2018 · Apt 1L

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in wasteline at shower stall in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east

    Apr 4, 2018 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective bell buzzer system in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east

    Apr 4, 2018 · Apt 2L

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2l, 2nd story, apartment at south

    Mar 5, 2018 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing located at apt 2l, 2nd story, apartment at south

    Mar 5, 2018 · Apt 2L

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin ants in the 3rd room from north located at apt 2l, 2nd story, apartment at south

    Mar 5, 2018 · Apt 2L

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of key operated lock at entrance door to room leading to fire escape window in the 5th room from north located at apt 2l, 2nd story, apartment at south

    Mar 5, 2018 · Apt 2L

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 5th room from north located at apt 2l, 2nd story, apartment at south

    Mar 5, 2018 · Apt 2L

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 5, 2018

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 21, 2016

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 20, 2015

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor at public hall, 1st story

    Jul 5, 2014

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 2nd apartment from north at east

    Dec 12, 2011 · Apt 1R

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system ..door to cellar locked, at public hall, 1st story

    Dec 12, 2011

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles south wall at lobby, 1st story

    Nov 17, 2011

    Closed — Violation closed
  • B

    Properly repair the broken or defective counter balance at lower sash windows in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south

    Nov 16, 2011 · Apt 3R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 3rd story, 2nd apartment from east at south

    Nov 16, 2011 · Apt 3R

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    May 1, 2007 · Apt 3R

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 1l, 1st story, 1st apartment from east at south

    Aug 19, 2006 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north located at apt 1l, 1st story, 1st apartment from east at south

    Aug 19, 2006 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, baseboard at west wall in the private hallway located at apt 1l, 1st story, 1st apartment from east at south

    Aug 19, 2006 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall, south wall, 1st window frame from east at south wall in the kitchen located at apt 1l, 1st story, 1st apartment from east at south

    Aug 19, 2006 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, 1st window frame from east at south wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from east at south

    Aug 19, 2006 · Apt 1L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at west wall, 1st door frame from west at north wall, 1st door frame from east at south wall in the 2nd room from north located at apt 1l, 1st story, 1st apartment from east at south

    Aug 19, 2006 · Apt 1L

    Closed — Violation closed
  • B

    Properly repair the broken or defective bell and buzzer system at building entrance to 3 sty west apt 3r , section '' ''

    Dec 3, 1996 · Apt 3R

    Open — Nov certified on time
  • B

    Abate the nuisance consisting of vermin mice and roaches thru out 3 sty west apt 3r , section '' ''

    Dec 3, 1996 · Apt 3R

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint walls wood trim windows and ceiling 1 sty east apt 1l front room hernandez no phone er1 3620324. , section '' ''

    Dec 28, 1990 · Apt 1L

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint wood trim frame rear entrance door 1 sty east apt 1l er1 3620324. , section '' ''

    Dec 28, 1990 · Apt 1L

    Closed — Violation closed
  • C

    Remove or cover in a manner approved by the department the peeling lead paint wood trim frame entrance door and steam riser 1 sty east apt 1l bathroom er1 3620324. , section '' ''

    Dec 28, 1990 · Apt 1L

    Closed — Violation closed

DOB building violations · 21

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
Show 11 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain defect 6 apartments at rear have illigal sliding gates with pad locks to fire escape-obstuctive egress remedy: maintain building safety codes provide protection and legal egress gates immediatelt

    Jun 13, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 3

  • Class - 2

    B265/as per class 2(265)28-303.7 failure to file a compelete boiler inspection report as per dob records.submit a current b0-9 report.

    Apr 28, 2017 · Penalty $500

    Resolve
  • Hazardous

    Failure to maintain.defect:6 apartments at rear have illegal sliding gates with padlocks to fire escape-obstructing egress.remedy:maintain building safety codes.provide protection and legal egress gates immedia

    Jun 13, 2001

    Resolve
  • Hazardous

    Exit door total obstruction 2nd means of egress fire escape on the 3rd fl the window has sliding screen with two 2 padlocks on it remedy remve obstruction immediately

    Feb 25, 1999 · Penalty $480

    Resolve

Complaints

  • Water leak

    Heavy flow

    May 13, 2024 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 16, 2023 · Apt 3L

    Close
  • Water leak

    Damp spot

    Aug 16, 2023 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Jan 17, 2023 · Apt 3L

    Close
  • Unsanitary condition

    Mold

    Jan 17, 2023 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Jan 17, 2023 · Apt 3L

    Close
  • Safety

    Window guard broken/missing

    Jan 17, 2023 · Apt 3L

    Close
  • Safety

    Smoke detector

    Jan 17, 2023 · Apt 3L

    Close
  • Appliance

    Refrigerator

    Jan 17, 2023 · Apt 3L

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Jan 17, 2023 · Apt 3L

    Close
  • Safety

    Carbon monoxide detector

    Jan 17, 2023 · Apt 3L

    Close
  • Water leak

    Heavy flow

    Jan 17, 2023 · Apt 3L

    Close
  • Plumbing

    Bathtub/shower

    Dec 30, 2022 · Apt 3L

    Close
  • Unsanitary condition

    Mold

    Dec 30, 2022 · Apt 3L

    Close
  • Flooring/stairs

    Floor

    Dec 30, 2022 · Apt 3L

    Close
  • Appliance

    Refrigerator

    Dec 30, 2022 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Dec 30, 2022 · Apt 3L

    Close
  • Water leak

    Heavy flow

    Dec 30, 2022 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Mar 8, 2021 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Jun 14, 2018 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Jun 14, 2018 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Jun 5, 2018 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Jun 5, 2018 · Apt 1L

    Close
  • Door/window

    Window frame

    Jun 4, 2018 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Jun 4, 2018 · Apt 1L

    Close
  • Appliance

    Electric/gas range

    Jun 4, 2018 · Apt 1L

    Close
  • Plumbing

    Basin/sink

    Jun 4, 2018 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Jun 4, 2018 · Apt 1L

    Close
  • General

    Bell/buzzer/intercom

    Apr 3, 2018 · Apt 2L

    Close
  • Plumbing

    Bathtub/shower

    Apr 3, 2018 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Apr 3, 2018 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Apr 3, 2018 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Mar 19, 2018 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Mar 19, 2018 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Feb 28, 2018 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2018 · Apt 1R

    Close
  • Door/window

    Door

    Oct 11, 2017 · Apt 1L

    Close
  • General

    Bell/buzzer/intercom

    Oct 11, 2017 · Apt 1L

    Close
  • Door/window

    Door

    Oct 11, 2017 · Apt 1L

    Close
  • Unsanitary condition

    Sewage

    Oct 11, 2017 · Apt 1L

    Close
  • Appliance

    Electric/gas range

    Oct 11, 2017 · Apt 1L

    Close
  • Flooring/stairs

    Floor

    Oct 11, 2017 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Oct 11, 2017 · Apt 1L

    Close
  • Electric

    Outlet/switch

    Jul 14, 2017 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 14, 2017 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 14, 2017 · Apt 3R

    Close
  • Flooring/stairs

    Floor

    Jul 14, 2017 · Apt 3R

    Close
  • Flooring/stairs

    Floor

    Jul 14, 2017 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Jul 14, 2017 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1909
Floors
3
Residential units
6
Building area
4,875 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3399 / 12
Assessed value
$501,750
Landmark / historic district
No

HPD registration #335127, last renewed Aug 5, 2025.

Questions about 1324 Hancock Street

Who owns 1324 Hancock Street?

The owner of record in NYC Department of City Planning PLUTO data is 1324 Hancock LLC.

Does 1324 Hancock Street have violations?

Yes. NYC HPD has recorded 52 housing violations at this property.

Is 1324 Hancock Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1324 Hancock Street built?

City records list 1909 as the year it was built.

How many apartments are in 1324 Hancock Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.