roofy

479 Central Avenue

Brooklyn, NY 11221BBL 3-03383-0002Map

Owner of record: 479 Central LLC

479 Central Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11221. It has 5 residential units across 3 floors. The owner of record is 479 Central LLC. HPD has recorded 1,342 housing violations here, most recently on May 4, 2026. 39 of the 50 most recent violations are still open.

HPD violations
1,342
DOB violations
24
ECB violations
29
HPD complaints
761

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,342

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Open — Info nov sent out
  • C

    Properly repair or replace the broken or defective oil tank gauge at tank room at cellar

    Jul 21, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at boiler room

    Jul 21, 2025

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at cellar

    Jul 21, 2025

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling , east and north wall at room next meter room at cellar

    Jul 21, 2025

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at tank room at cellar

    Jul 21, 2025

    Open — Nov sent out
  • C

    Provide fire resistant door at tank room at cellar

    Jul 21, 2025

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective door at meter room

    Jul 21, 2025

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling at tank room at cellar

    Jul 21, 2025

    Open — Nov sent out
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at meter room

    Jul 21, 2025

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling , east and north wall at room next meter room at cellar original violation 18110315 issued 21-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jul 21, 2025

    Open — First no access to re- inspect violation
  • C

    M/d law abate the nuisance consisting of storage of and electric bicycle at public hall, 1st story

    Jul 10, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardent materials at ceiling and south wall by floor at public hall, 1st story

    Jul 10, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at all walls at public hall, 1st story

    Jul 10, 2025

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... greather than 15 sq ft at north wall and ceiling at public hall, 1st story

    Jul 10, 2025

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of construction materials at public hall, 1st story

    Jul 10, 2025

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greather than 15 sq ft at north wall and ceiling at public hall, 1st story original violation 18089982 issued 10-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jul 10, 2025

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... at west wall, less then 10 square feet in the 2nd room from north at west located at apt 1r, 1st story, 1st apartment from west at north original violation 18070101 issued 30-jun-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jun 30, 2025 · Apt 1R

    Open — First no access to re- inspect violation
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1r, 1st story, 1st apartment from west at north

    Jun 30, 2025 · Apt 1R

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 1r, 1st story, 1st apartment from west at north

    Jun 30, 2025 · Apt 1R

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at west wall, less then 10 square feet in the 2nd room from north at west located at apt 1r, 1st story, 1st apartment from west at north

    Jun 30, 2025 · Apt 1R

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 29, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 29, 2025

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction items blocking egress at public hall, 1st story

    Jun 29, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Jun 29, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 9, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 30, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 30, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 30, 2025 · Apt 2L

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room at cellar

    Apr 30, 2025

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 9, 2025 · Apt 2L

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 9, 2025 · Apt 2L

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Apr 9, 2025

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 8, 2025 · Apt 2R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 8, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 8, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Apr 8, 2025

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 8, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective upper escutcheon plate at steam riser at the north wall in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 8, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 8, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Apr 8, 2025 · Apt 2R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room, 1st story

    Apr 7, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Apr 7, 2025 · Apt 3R

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Apr 7, 2025 · Apt 3R

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 5, 2025 · Apt 2L

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Apr 5, 2025 · Apt 2L

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door from street locked at basement

    Apr 5, 2025

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of refrigerator with door intact at public hall, 2nd story

    Apr 3, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Apr 3, 2025 · Apt 3R

    Closed — Violation closed

DOB building violations · 24

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Immediate emergency anythingoptional

    Seal all fire damaged openings to safeguard the public and property and to prevent unauthorized entry

    Oct 8, 2025

    Dob violation - dismissed
  • Construction other optional

    Structure rendered non compliant due to fire , water and smoke damage throughout, missing windows, roof partially open and in danger to stud s & joits. owner to hire nyspe to submit report to ertinspections@bu ildings.nyc.gov.within 72 hours addressing all conditions with plans ,photos, and time frame for repairs to be completed

    Oct 7, 2025

    Dob violation - active
  • Construction other optional

    Structure rendered non compliant due to fire,fire, water and smoke dam age, throughout, missing windows, roof partially open to elements, bur nt,studs and joist and missing fire stopping the premises must be maintained in code compliant manner

    Oct 7, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
Show 14 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Construction other optional

    Hazardous

    Aug 8, 2001

    Dob violation - active
  • Construction other optional

    Hazardous

    Aug 8, 2001

    Dob violation - active
  • Construction other optional

    Work w/o a permit: hazardous work noted: erected a woods awing a 1st fl. rear drop ladder on to awing roof remedy: make safe immediately obtain permit if feasible or restore to prior legal condition

    Sep 19, 2000

    Vw-violation work without permit - active
  • Construction other optional

    Hazardous

    Aug 24, 2000

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jun 1, 2000

    Dob violation - active

ECB violations · 29

  • Class - 2

    Failure to comply with the commissioner's orders to file a certificate of correction for vio# 35685714y, file a certificate of correction

    Aug 5, 2026 · Penalty $1,280

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the dept. of buildings for violation # 39187014r, file a certificate of correction

    Aug 5, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction for vio# 35685712k, file a certificate of correction

    Aug 5, 2026 · Penalty $1,280

    Active
  • Class - 1

    Unlawful acts. failure to comply with the commissioner's orders to a obtain a permit for vio# 35685713m. no permits on file to erect full height partitions at 2nd and 3rd floor., comply with commissioner's orde

    Aug 5, 2026 · Penalty $2,530

    Active
  • Class - 1

    Failure to maintain building in code compliant matter. noted: at exp-4 of building running vertical crack in facade finish spanning from roof line to 1st floor., repair and/replace

    May 1, 2026 · Penalty $12,500

    Active
  • Class - 1

    Occupancy contrary to that allowed according to building dept, indicates premises is a 5 family plus store. premises now altered for occupancy with 1 sro on 2nd flr and sro on 3rd flr. plus 5 family and store.

    Oct 7, 2025 · Penalty $12,500

    Active
  • Class - 1

    Work without a permit: at 2nd flr front right and 3rd flr front right erected full height partitions creating class "b" rooms. no permits onfile. remedy: obtain permits.

    Oct 7, 2025 · Penalty $12,500

    Active
  • Class - 1

    Failure to provide unobstructed exit passageway. at 2nd and 3rd floor front created 1 class "b" room at 2nd floor and 1 class "b" room at 3rd floor with no secondary means of egress. remedy: remove obstruction.

    Oct 7, 2025 · Penalty $6,250

    Active
  • Class - 1

    Work without permit. fswo issued for all general construction. carpentry demolition work ect being done in the basement . atoi observed full gut demolition consisting of walls and ceiling and replaced with shee

    Jul 18, 2025 · Penalty $12,500

    Active
  • Class - 1

    Work without permit fswo issued for all plumbing work being done in the basement. atoi observed in the basement newly installed plumbing work done in the bathroom consisting of two toilets and one shower and on

    Jul 18, 2025 · Penalty $12,500

    Active
Show 19 more ↓
  • Class - 1

    Noted: violation issued for ftm buildings wall. atoi observed at expo # 4 a vertical flatline crack from the roof to the first floor in the buildings exterior facade, maintain exterior building wall

    Jul 18, 2025 · Penalty $25,000

    Active
  • Class - 1

    Unlawful acts: failure to comply with commissioner's order as stated in ecb# 39105998r issued on 02/12/2024 and file a certificate of correction pursuant to 28-201.1 and 1rcny for failure to maintain access to

    Jun 17, 2024 · Penalty $6,250

    Resolve
  • Class - 1

    Unlawful acts: failure to comply with commissioner's order as stated in ecb# 39106000z issued on 02/12/2024 and file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01 for no overcurrent protecti

    Jun 17, 2024

    Resolve
  • Class - 1

    Unlawful acts: failure to comply with commissioner's order as stated in ecb# 39105999z issued on 02/12/2024 and file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01 for defective electrical wi

    Jun 17, 2024

    Resolve
  • Class - 1

    I noted several circuit breakers in the off position due to defective wiring supplying power to apts 3l and 1r, upon inspection of apt 3l noted no loss of power, indicating power obtained without overcurrent pr

    Feb 12, 2024

    Resolve
  • Class - 1

    I observed in the basement area the excessive storage in the electrical area, this is a fire hazard also a failure to maintain access to all electrical distribution equipment., comply with ec; comply with code

    Feb 12, 2024 · Penalty $6,000

    Active
  • Class - 1

    I observed in dob records permit # b00394410 issued on 09/03/2020 to correct the issues stated in the comments. i confirmed with the contractor and the tenants no work has been performed within the last year, t

    Feb 12, 2024

    Resolve
  • Class - 2

    As per 28-301.1. failure to maintain building in a code compliant manner. as per law for drainage system pc 702.1; 27-911., modify system to conform with rs-16; correct all plumbing system leakages in basement.

    Jul 27, 2023 · Penalty $3,125

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. i observed in cellar boiler room an appliance valve installed on main gas line and also observed pvc piping installed in a mix use building which are both

    Nov 27, 2018 · Penalty $6,250

    Active
  • Class - 1

    Failure to have new or altered plumbing system tested. i observed in cellar,boiler room newly installed gas piping and valves for water and gas and no proper testing was performed on gas or water lines. remedy:

    Nov 27, 2018 · Penalty $12,500

    Active
  • Class - 1

    Work without a permit. i observed in cellar boiler room newly installed hot water heater with all new gas piping and water piping with new shut off valves. no permits on file. remedy: obtain permit

    Nov 27, 2018 · Penalty $12,500

    Active
  • Class - 2

    Failure to maintain exterior bldg wall or appurtenances. at exp#2 masonry oarging in state of disrepair at various locations. also brickwall around windows at 3rd fl in state of disrepair. exp#4 masonry parging

    Nov 2, 2017 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain bldg walls or appurtenances. noted: at left side of bldg (exp #2) approx 20'x15' area of stucco is missing exposing brick wall to elements,also noted above front entry section of brick wall

    Dec 17, 2014 · Penalty $2,500

    Active
  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families two family converted to four sro apt at 1st floor store converted to sro apt.remedy:discontinue illegal use or

    Aug 8, 2001 · Penalty $2,500

    Active
  • Hazardous

    Failure to maintain building defects noted:1-no firestopping on 1st floor ceiling and walls at various location.2-hallway no firestopping at various location throughout.remedy:maintain building

    Aug 8, 2001 · Penalty $2,500

    Active
  • Hazardous

    Occupancy contrary to that allowed by the certificate of occupany or building department records.first story changed from commercial use to an class "a" apartment.partitions erected and kitchen and bathroom fac

    Aug 3, 2001 · Penalty $2,500

    Active
  • Hazardous

    Work without a permit-hazardous work noted: erected a woods away a 1st floor rear. prup ladder drop to away roof remedy: make safe immediately obtain permit if feasible or restore to prior legal condition

    Sep 19, 2000 · Penalty $2,500

    Active
  • Hazardous

    Failure to maintain exterior building wall defect is: the two side wall's of building brick's are messing pulling away at various location also hole exterior side wall's remedy:make safe, maintain exterior buil

    Aug 24, 2000 · Penalty $2,500

    Active
  • Hazardous

    Failure to maintain interior building wall defect: front central ave side of building corner wall facing jefferson ave side brick are loose pulling away missing also corroded from 2nd to 3rd story. remedy: make

    Jun 1, 2000 · Penalty $2,500

    Active

Complaints

  • Heat/hot water

    Entire building

    Oct 7, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 6, 2025 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2025 · Apt BLDG

    Close
  • Electric

    Outlet/switch

    Jun 7, 2025 · Apt 1R

    Close
  • Water leak

    Slow leak

    Jun 7, 2025 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    May 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 30, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 23, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 22, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Apr 21, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 16, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 14, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 9, 2025 · Apt 2L

    Close
  • Water leak

    Heavy flow

    Apr 8, 2025 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Apr 8, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Apr 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Apr 8, 2025 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Apr 6, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 4, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 4, 2025 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Apr 3, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 3, 2025 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Apr 2, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 2, 2025 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Mar 31, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Mar 31, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2025 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Mar 6, 2025 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Mar 5, 2025 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Mar 5, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Mar 5, 2025 · Apt 2L

    Close
  • Plumbing

    Water supply

    Feb 25, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2025 · Apt 2L

    Close
  • Plumbing

    Water supply

    Feb 25, 2025 · Apt 2L

    Close
  • Water leak

    Heavy flow

    Feb 25, 2025 · Apt 3R

    Close
  • Water leak

    Damp spot

    Feb 25, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Feb 25, 2025 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Feb 21, 2025 · Apt 1R

    Close
  • Plumbing

    Water supply

    Feb 21, 2025 · Apt 3R

    Close
  • Water leak

    Slow leak

    Feb 21, 2025 · Apt 1R

    Close

Sales history

DatePriceTypeUnits
Aug 14, 2026$3,000Rentals - walkup apartments5
Dec 29, 2025$4,000Rentals - walkup apartments5

Building details

Building type
Walk-up apartment building (C2)
Year built
1920
Floors
3
Residential units
5
Building area
5,150 ft²
Lot area
2,498 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3383 / 2
Assessed value
$655,200
Landmark / historic district
No

HPD registration #354564, last renewed Nov 10, 2015.

Questions about 479 Central Avenue

Who owns 479 Central Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 479 Central LLC.

Does 479 Central Avenue have violations?

Yes. NYC HPD has recorded 1,342 housing violations at this property.

Is 479 Central Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 479 Central Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 479 Central Avenue?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.