1228 Putnam Avenue
Brooklyn, NY 11221BBL 3-03375-0019Map
Owner of record: Townhouse Rental V, L.l.c.
1228 Putnam Avenue is a walk-up apartment building built in 1910 in Brooklyn, 11221. It has 6 residential units across 4 floors. The owner of record is Townhouse Rental V, L.l.c.. HPD has recorded 53 housing violations here, most recently on November 6, 2025.
- HPD violations
- 53
- DOB violations
- 26
- ECB violations
- 55
- HPD complaints
- 35
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 53
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings [ missing notice ]
Nov 6, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox [ missing notice ] at public hall, 1st story
Nov 6, 2025
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 6, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story
Nov 6, 2025
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 6, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of room use for living purposes, lower level of legal duplex located at apt one, 1st story, 1st apartment from east at south
Nov 6, 2025 · Apt ONE
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Nov 6, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2018
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrial wire at west wall in the bathroom located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 3rd room from north at west located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlets at west and east walls in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the 1st room from north located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - ANon-hazardous
Refit entrance door in the 1st room from north located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the bathroom located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective matal ceiling in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor at walking area in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower and upper sash window in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane at lower sash window in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower sash window in the 1st room from north located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceiling in the entire apartment located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective sagging wood floor at entire wood floor in the 1st room from north located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - BHazardous
Properly repair the broken or defective sagging wood floor entire floor in the bathroom located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2ndfl, 2nd story
Jun 23, 2018 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective upper and lower sash at windows in the 3rd room from north at west located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures ''gas range '' in the kitchen located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of extension cord connected from 1st story apartment to 2nd story apartment
Jan 7, 2018
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at wash basin , water closet , bathtub and sink located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at wash basin , sink and bathtub located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures '' gas range'' in the kitchen located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective upper and lower sash at wndow in the kitchen located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood flooring in the kitchen located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 2nd story
Jan 7, 2018 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak above ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective upper and lower sashes of windows in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 2nd story
Dec 30, 2017
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor at public hall, 2nd story
Dec 30, 2017
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective skylight in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective upper and lower sashes of window in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinylfloor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak above ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Dec 30, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story
Dec 27, 2017 · Apt 2R
Closed — Violation closed
DOB building violations · 26
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 9, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 28, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed
Show 16 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 26, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
May 14, 2019
Vp*-violation unserved ecb- dismissed
ECB violations · 55
- Class - 1
Failure to maintain adequate housekeeping per section requirements.note:at time of my inspection of an active 4 story building under construction.i fully enclosed and topped off at bulkhead level.i observed tha
Jun 7, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain adequate pre-shaft logs as required.note:at time of inspection of an active jobsite with 6 workers of various trade while responsing to a complaint at this jobsite i observed while on site t
Jun 7, 2021
Resolve - Class - 2
Housekeeping. note: at time of my inspection of a 4 sty bldg topped off at roof construction work in progress. i observed construction debris consisted off plywood,wires,cardboard,wood & platic pails on top of
Apr 7, 2021 · Penalty $625
Resolve - Class - 1
Failure to ensure workers attend pre-shift meeting prior to commencement of work.alt bldg 4 story currently on roof level.i observed contractor did not have pre-shift safety meeting up on my request.pre-shift
Apr 5, 2021 · Penalty $2,500
Resolve - Class - 1
3314.1 failure to maintain pipe scaffold(guardrail,toe board,planks) alt1 bldg 4 story currently at roof level active construction site.i observed pipe scaffold on exp.#1 w/missing planks,toe boards & guardrai
Apr 5, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. at the time of my inspection of a 4 sty alt-1 jobsite,w/work in progress,i observed scaffold setup on the roof of the @ j prop is
Mar 19, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to display/maintain on site. document required by chapter 33. at the time of my inspection of a 4 sty alt-1 jobsite at roof level w/construction work ongoing,i observed at exp#4 pipe scaffold loaded on
Mar 19, 2021
Resolve - Class - 1
Sec. 3314.2 inadequate scaffold system. at the time of my inspection of a 4 sty alt-1 jobsite at roof level w/work in progress,i observed inadequate scaffold system missing guardrail & adequate planking. inadeq
Mar 19, 2021 · Penalty $625
Resolve - Class - 2
Temporary construction equipment on site-expired permit. at time of inspection of 4 sty alt-1 active job site observed construction fence atexp#1,exp#3,exp#2&4 rear yard. upon review of dept records(bis & dob n
Mar 10, 2021 · Penalty $3,125
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.at the time of inspection of a 4 story alt 1 job site,active work.i observed workers performing work at roof level exp#2 approx. 1ft. from leading
Feb 4, 2021 · Penalty $5,000
Resolve
Show 40 more ↓
- Class - 2
Failure to provide approved/accepted construction documents at jobsiteat time of inspection.note:at the time of inspection at active construction pipe work in progress,i observed sws and supported scaffold in p
Jan 13, 2021 · Penalty $312
Resolve - Class - 2
3309.10 protections of roof.note at the time of my inspection of an active jobsite,i observed that there were no adequate roof protection as required at exposure#2.contractor did not protect terracotta tiles in
Jan 13, 2021 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment onsite-expired permit.note:at the time of my inspection of 4 story building,i observed construction fence in place at exposure#1.after review the building information system(bis
Jan 13, 2021 · Penalty $625
Resolve - Class - 1
3314.1 supported scaffold does not meet code specification.note:at thetime of inspection at active construction site,i observed supported scaffold installed at exposure#1 and at expo#3.also i observed erected s
Jan 13, 2021 · Penalty $2,500
Resolve - Class - 2
Temporary construction equipment onsite-expired permit.note:at the time of inspection,i observed active construction site sws in place at exposure#1.after review of the building information system(bis)and do
Jan 13, 2021 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendmnets as noted at the time of my inspection observed (1) at second floor on the structural plan were missing in 10 x 19 beam at expo
Nov 17, 2020 · Penalty $625
Resolve - Class - 1
License to enter adjoining property at the time of inspection of an active jobsite of 4 story bldg observed,worker were performing works on adjacent property roof when i asked to see the {allers} agreement to
Nov 10, 2020 · Penalty $625
Resolve - Class - 1
Bc 3309.10,bc 3309.1,failure to provide protection of roof. at time ofinspection of active permit site observed building structure steel columns in place from 3rd fl working deck level up to 4th fl adjacent to
Nov 6, 2020 · Penalty $6,250
Resolve - Class - 1
Bc3301.2 failure to safeguard public and property-no overhead protection for adjacent property.at time of inspection of a 4 story alt 1 currently at 2nd floor i observed eork being done above adjacent property
Oct 7, 2020 · Penalty $6,250
Resolve - Class - 1
Sec. 33309.14 protection of windows. at the time of inspection of an active jobsite observed on the 2nd fl construction operation in progress & that the windows at ajacent bldg at exp#2 had no protection,failur
Oct 6, 2020 · Penalty $6,250
Resolve - Class - 1
Guardrail system.at the time of inspection of an active jobsite of 4 story bldg observed,at level 2 there was suported scaffold erected in place missing guardrail system,scaffold w/out adequate guardrail syste
Sep 9, 2020 · Penalty $6,250
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientationor refresher.at the time of inspection of an active jobsite observed, workers are performing works w/out receiving site safety orientation
Sep 9, 2020 · Penalty $12,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35407494l issued on 06/25/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to safeguard all persons & property affecte
Sep 4, 2020 · Penalty $3,125
Resolve - Class - 2
Temporary construction equipment on site.expired permit.note:at the time of my inspection of a 4 story alteration construction site.i observed construction fence in place upon review of department records the p
Aug 26, 2020 · Penalty $3,125
Resolve - Class - 2
Temporary construction equipment permit expired.at time of inspection of 4 stry bldg under alt at 2nd stry framing active jobsite observed construction fence in place.upon the research of the dept records it wa
Aug 17, 2020 · Penalty $3,125
Resolve - Class - 2
Sidewalk shed parapet panel. at the time of my inspection,i observed asidewalk shed erected at exp#1. i also observed that there were no sidewalk shed parapet panel in place as required by code. a sidewalk shed
Aug 14, 2020 · Penalty $625
Resolve - Class - 2
Failure to provide proper concrete washout procedures. at time of inspection of an active site performing concrete operations pouring the 1st fl slab i observed concrete pump truck parked in roadway at exposure
Aug 12, 2020 · Penalty $625
Resolve - Class - 1
Sec. bc3303.4 housekeeping. note: at the time of inspection observed 4workers siting in 1st fl level,doing there coffy break. also observed huge amount of garbage black bags(full of garbage),damaged woods,metal
Jul 29, 2020
Resolve - Class - 2
Sec. 3307.4 warning sign,personnel & barriers. at the time of inspection on active jobsite observed,materials & debris stored at street container not(guarded)by barriers to safeguard publuc from hazard accessib
Jul 16, 2020 · Penalty $625
Resolve - Class - 1
Unlawfully continued work while on a notice of a stop work order. at atime of inspection observed active jobsite w/workers performing soil diging work at basement level contrary to stop work order issued on dat
Jul 16, 2020
Resolve - Class - 1
Permit holder failure to ensure workers receive site safety orientation or(refresher. at the time of inspection on active jobdsite observed,workers are performing works w/o receiving site safety orientation or
Jul 16, 2020 · Penalty $2,500
Resolve - Class - 2
Job-site fence not constructed or maintained pursuant to subsection.note:at the time of my inspection of an 2 story building with no active work,i observed at exposure one and construction fence with missing vi
Feb 11, 2020 · Penalty $500
Resolve - Class - 1
Bc 3309.1 failure to protect adj properties.at time of my inspection iobserved of exp# 2 & #4 loose bricks that are protectional.both exp are exposed to weather element and in danger of possible collapse.also s
Feb 10, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35407494l issued on 06/25/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to safeguard all person/property affected b
Jan 25, 2020
Resolve - Class - 2
Bc3307.2.2/failure to provide provide enclosement & beyond sws and height of fence.at the time of my inspection of an inactive 4 story alt 1site.i observed that there wasnt enclosement between the sws and the f
Jan 25, 2020 · Penalty $1,250
Resolve - Class - 3
Bc3307.7.3/missing viewing fence panel(plexiglass)at the time of my inspection of an inactive 4 story alt 1 site.i observed the constructionfence had missing plexiglass for the viewing panels.plexiglass cover a
Jan 25, 2020 · Penalty $500
Resolve - Class - 2
Failure to comply with the commissioners order conatined in summons/violation #35407494l issued on 06-26-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for failure to safegua
Nov 22, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35407494l issued on 06-25-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for failure to safeguard all persons & construction affected by
Oct 17, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35407494l issued on 6/25/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for:failure to safeguard a
Sep 6, 2019 · Penalty $3,125
Resolve - Class - 1
Ac28-211.1, ac28-101.4.5 false statement-the respondent, the applicantof record for drawings file dunder job no. 321755515 falsified the pw1 filed with the departmet. tje respondent failed to indicate that the
Aug 15, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. noted: premises is a 2story vacant alt2 3321755515 exp 3/4/2020 with rior stop work order 35424956l. inspection revealed a port
Jun 25, 2019 · Penalty $10,000
Resolve - Class - 1
Bc 3301.13.12 construction superintendent failed to provide adequate (c)person. note:at time of inspection of a proposed 4 story building. at time of inspection i observed 3 workers inside site installing cmu b
May 9, 2019
Resolve - Class - 1
Failure to provide adequate housekeeping per section requirements. note:at time of inspection i observed a proposed 4 story building job site in progress. upon my inspection i observed material and debris scatt
May 9, 2019 · Penalty $625
Resolve - Class - 1
Permit holder/owner/workers employer failed to ensure each construction or demolition worker successfully completed the required training under bc3321.1-i observed 3 workers on site when asked for osha training
May 9, 2019 · Penalty $1,250
Resolve - Class - 2
Construction superintendent failed to perform duties as per code. the following hazardous conditions were observed and stop work order was issued to this construction site on this date. (1)failed to provide ade
May 9, 2019 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and or approved amendments.at time of inspection on an active site of a proposed 4-story alt-1,i observed demolition,structural,alteration,and foundation
Mar 22, 2019
Resolve - Class - 1
Construction superintendent failed ot notify the department of conditions as required . at time of inspection on an active job site of a 4 story alt-1 i observed various tools on site with multiple unsafe
Mar 22, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide sidewalk shed where required at time of inspection on an active site of a proposed 4 story alt-1 i observed proposed building height greater than 40 feet with current structure height above
Mar 22, 2019
Resolve - Class - 1
3309.9;failure to waterproof adjoining wall during construction and demolition operations.at time of inspection on an active site of proposed 4 story alt-1 i observed out of service of sequence demo structural
Mar 22, 2019 · Penalty $625
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition workerssuccessfully completed the required training under bc 3321.1. during my inspection i observed henry fernandez at a building site which
Mar 22, 2019 · Penalty $5,000
Resolve
Complaints
- Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Oct 31, 2025 · Apt 1
Close - Unsanitary condition
Mold
Oct 31, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 3R
Close - Door/window
Window frame
Oct 6, 2020 · Apt 3
Close - Electric
Outlet/switch
Jun 21, 2018 · Apt 2NDFL
Close - Electric
Outlet/switch
Jun 21, 2018 · Apt 2NDFL
Close - Door/window
Window frame
Jun 21, 2018 · Apt 2NDFL
Close - Paint/plaster
Ceiling
Jun 21, 2018 · Apt 2NDFL
Close - Paint/plaster
Wall
Jun 21, 2018 · Apt 2NDFL
Close
Show 25 more ↓
- Flooring/stairs
Floor
Jun 21, 2018 · Apt 2NDFL
Close - Door/window
Window frame
Jun 21, 2018 · Apt 2NDFL
Close - Door/window
Window frame
Jun 21, 2018 · Apt 2NDFL
Close - Paint/plaster
Wall
Jun 21, 2018 · Apt 2NDFL
Close - Flooring/stairs
Floor
Jun 21, 2018 · Apt 2NDFL
Close - Flooring/stairs
Floor
Jun 21, 2018 · Apt 2NDFL
Close - General
Cooking gas
Jun 21, 2018 · Apt 2NDFL
Close - Plumbing
Water supply
Jan 9, 2018 · Apt 2
Close - General
Cooking gas
Jan 9, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt HOUSE
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt 2FL
Close - General
Cooking gas
Jan 5, 2018 · Apt 2FL
Close - Plumbing
Toilet
Jan 5, 2018 · Apt 2FL
Close - Plumbing
Water supply
Jan 5, 2018 · Apt 2FL
Close - Plumbing
Water supply
Jan 4, 2018 · Apt 2
Close - General
Cooking gas
Jan 3, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Jan 3, 2018 · Apt 2
Close - Heat/hot water
Entire building
Jan 2, 2018 · Apt 2
Close - General
Cooking gas
Jan 2, 2018 · Apt 2
Close - Heat/hot water
Entire building
Jan 2, 2018 · Apt 2
Close - Heat/hot water
Entire building
Dec 28, 2017 · Apt 2
Close - Heat/hot water
Apartment only
Dec 26, 2017 · Apt 2R
Close - General
Cooking gas
Dec 20, 2017 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Dec 20, 2017 · Apt 2NDFL
Close - Heat/hot water
Entire building
Dec 20, 2017 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1910
- Floors
- 4
- Residential units
- 6
- Building area
- 5,095 ft²
- Lot area
- 2,075 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3375 / 19
- Assessed value
- $733,950
- Landmark / historic district
- No
HPD registration #390513, last renewed Jul 1, 2026.
Questions about 1228 Putnam Avenue
Who owns 1228 Putnam Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Townhouse Rental V, L.l.c..
Does 1228 Putnam Avenue have violations?
Yes. NYC HPD has recorded 53 housing violations at this property.
Is 1228 Putnam Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1228 Putnam Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 1228 Putnam Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.