81a Cornelia Street
Brooklyn, NY 11221BBL 3-03374-0049Map
Owner of record: Lavender Manor LLC
81a Cornelia Street is a walk-up apartment building built in 1913 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is Lavender Manor LLC. HPD has recorded 82 housing violations here, most recently on October 14, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 82
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 100
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 82
- BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Oct 14, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of lock on door to room to fire escape in the 1st room from east located at apt 2r, 2nd story, 1st apartment from west at north
Sep 12, 2024 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective leading to rear yard, hinges defective. at cellar
Sep 5, 2024
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of lock on door to room to fire escape in the 6th room from east located at apt 2l, 2nd story, 1st apartment from east at south
Sep 5, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Apr 19, 2023 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Apr 17, 2023 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand doorstop installed at building front entrance door , 1st story
Apr 12, 2023
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective the ceramic tile at floor and west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Apr 8, 2023 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Apr 8, 2023 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling , 3rd story
Apr 8, 2023
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window in the 5th room from east located at apt 2l, 2nd story, 1st apartment from east at south
Apr 8, 2023 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Apr 8, 2023 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective the ceramic tiles at west wall in the bathroom located at apt 1l lower level, 1st story, 1st apartment from east at south
Apr 8, 2023 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 1l lower level, 1st story, 1st apartment from east at south
Apr 8, 2023 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets wash basin in the bathroom located at apt 1l lower level, 1st story, 1st apartment from east at south
Apr 8, 2023 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Apr 8, 2023 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling by scuttle ladder , 3rd story
Apr 8, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling , 3rd story
Apr 8, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Apr 8, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Mar 31, 2023 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Mar 31, 2023 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 2l, 2nd story, 1st apartment from south at west
Mar 31, 2023 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2l, 2nd story, 1st apartment from south at west
Mar 31, 2023 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 6th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Feb 9, 2023 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the broken or defective frame at lower sash at window at west wall in the 2nd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Feb 9, 2023 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Feb 9, 2023 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 6th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Feb 9, 2023 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2l, 2nd story, 1st apartment from south at west
Jan 24, 2023 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the broken or defective window counter balance lower sash at west wall in the 2nd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Jan 24, 2023 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jan 24, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Jan 24, 2023 · Apt 2L
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Sep 7, 2021 · Apt 1L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1l, 1st story, 1st apartment from south at west
Sep 7, 2021 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
Aug 30, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 2r, 2nd story, 1st apartment from north at east
Aug 30, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 2r, 2nd story, 1st apartment from north at east
Aug 30, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
Aug 30, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at north stack, building rear
Aug 30, 2021
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entarnce located at apt 2r, 2nd story, 1st apartment from north at east
Aug 30, 2021 · Apt 2R
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed - BHazardous
Remove the illegal fastening consisting of hasp and eye capable of being padlocked at metal gate, building front yard
Dec 10, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jan 13, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 13, 2020
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 2
Occupancy contrary to that allowed by the c of o or bldg dept records.dob's records indicates premises to be legally approved for a 6 familydwelling w/no occupancy at cellar level;only for storage & mechanical
Aug 23, 2017 · Penalty $3,000
Resolve - Class - 2
Work does not conform to approved plans &/or approved amendments. work noted: at the time of inspection at sheet being used as a doorway. premises under job app#320284811 alt type 2 provides cellar level for
Aug 23, 2017 · Penalty $1,250
Resolve - Class - 2
Work w/o a permit. noted: at the time of inspection at exp#1 i observed new window units installed. the layout,sizes,& facade has been changed,vinyl to brick. remedy: obtain permit.
Aug 23, 2017 · Penalty $4,000
Active
Complaints
- Water leak
Slow leak
Oct 4, 2026 · Apt 1L
Close - Appliance
Refrigerator
Oct 4, 2026 · Apt 1L
Close - Water leak
Slow leak
Sep 16, 2026 · Apt 1L
Close - Heat/hot water
Apartment only
Apr 3, 2025 · Apt 2L
Close - Water leak
Slow leak
Jan 7, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 26, 2024 · Apt 3R
Close - Water leak
Heavy flow
Jan 23, 2024 · Apt 1L
Close - Flooring/stairs
Floor
Jan 23, 2024 · Apt 1L
Close - Paint/plaster
Wall
Jan 23, 2024 · Apt 1L
Close - Unsanitary condition
Pests
Aug 6, 2023 · Apt 1L
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jun 14, 2023 · Apt 1L
Close - Heat/hot water
Entire building
Apr 18, 2023 · Apt 3R
Close - Heat/hot water
Entire building
Apr 18, 2023 · Apt 2L
Close - Heat/hot water
Apartment only
Apr 14, 2023 · Apt 2R
Close - Heat/hot water
Entire building
Apr 11, 2023 · Apt BLDG
Close - General
Ventilation system
Apr 7, 2023 · Apt 1L
Close - Plumbing
Steam pipe/riser
Apr 7, 2023 · Apt 1L
Close - Safety
Carbon monoxide detector
Apr 7, 2023 · Apt 1L
Close - Unsanitary condition
Pests
Apr 7, 2023 · Apt 1L
Close - Heat/hot water
Apartment only
Apr 7, 2023 · Apt 1L
Close - Water leak
Heavy flow
Feb 15, 2023 · Apt 2L
Close - Water leak
Damp spot
Feb 15, 2023 · Apt 2L
Close - Water leak
Heavy flow
Feb 15, 2023 · Apt 2L
Close - Paint/plaster
Wall
Feb 15, 2023 · Apt 2L
Close - Flooring/stairs
Floor
Feb 15, 2023 · Apt 2L
Close - Door/window
Window frame
Feb 15, 2023 · Apt 2L
Close - Unsanitary condition
Pests
Feb 7, 2023 · Apt 3R
Close - Heat/hot water
Apartment only
Feb 7, 2023 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 7, 2023 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 6, 2023 · Apt 2L
Close - Water leak
Heavy flow
Jan 25, 2023 · Apt 2L
Close - Heat/hot water
Entire building
Jan 23, 2023 · Apt 2L
Close - Water leak
Heavy flow
Nov 11, 2022 · Apt 2L
Close - Water leak
Heavy flow
Sep 27, 2022 · Apt 1L
Close - Unsanitary condition
Mold
Sep 27, 2022 · Apt 1L
Close - Paint/plaster
Wall
Sep 27, 2022 · Apt 1L
Close - Water leak
Heavy flow
Sep 13, 2022 · Apt 2L
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt 2L
Close - Heat/hot water
Apartment only
Sep 5, 2021 · Apt 1L
Close - Heat/hot water
Apartment only
Dec 8, 2020 · Apt 2R
Close - Unsanitary condition
Pests
Dec 23, 2019 · Apt 2R
Close - Unsanitary condition
Pests
Jun 29, 2018 · Apt 2R
Close - Unsanitary condition
Mold
Jun 28, 2017 · Apt 1L
Close - Flooring/stairs
Floor
Jun 28, 2017 · Apt 1L
Close - General
Bell/buzzer/intercom
Jun 28, 2017 · Apt 1L
Close - Unsanitary condition
Pests
Jun 28, 2017 · Apt 1L
Close - Plumbing
Basin/sink
Jun 28, 2017 · Apt 1L
Close - Plumbing
Basin/sink
Jun 28, 2017 · Apt 1L
Close - Unsanitary condition
Pests
Jan 21, 2017 · Apt 2R
Close - Heat/hot water
Apartment only
Jan 21, 2017 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1913
- Floors
- 3
- Residential units
- 6
- Building area
- 4,875 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3374 / 49
- Assessed value
- $601,200
- Landmark / historic district
- No
HPD registration #324419, last renewed Aug 28, 2025.
Questions about 81a Cornelia Street
Who owns 81a Cornelia Street?
The owner of record in NYC Department of City Planning PLUTO data is Lavender Manor LLC.
Does 81a Cornelia Street have violations?
Yes. NYC HPD has recorded 82 housing violations at this property.
Is 81a Cornelia Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 81a Cornelia Street built?
City records list 1913 as the year it was built.
How many apartments are in 81a Cornelia Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.