1425 Broadway
Brooklyn, NY 11221BBL 3-03357-0005Map
Owner of record: Joel Johnson, LLC
1425 Broadway is a mixed residential and retail building built in 1910 in Brooklyn, 11221. It has 2 residential units across 3 floors. The owner of record is Joel Johnson, LLC. HPD has recorded 78 housing violations here, most recently on May 19, 2026. 7 of the 50 most recent violations are still open.
- HPD violations
- 78
- DOB violations
- 26
- ECB violations
- 14
- HPD complaints
- 127
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 78
- BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
May 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
May 19, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 27, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 27, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 27, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall in the 1st room from east at south located at apt 3, 3rd story
Feb 11, 2020 · Apt 3
Open — First no access to re- inspect violation - CImmediately hazardous
Replace with new the broken or defective glass pane at upper sash window in the 1st room from east at south located at apt 3, 3rd story
Feb 11, 2020 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Dec 10, 2019 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective locking device at entrance door at public hall, 1st story
Dec 4, 2019
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the 1st room from east located at apt 3, 2nd story, 1st apartment from east at south
Dec 4, 2019 · Apt 3
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from east at south located at apt 3, 2nd story, 1st apartment from east at south
Dec 4, 2019 · Apt 3
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures gas stove in the kitchen located at apt 3, 3rd story, apartment at south
Jul 15, 2015 · Apt 3
Closed — Violation closed - BHazardous
Abate the nuisance consisting of sheetrock partition wall erected decreasing the size 3rd story 0f public hall and enclosing scuttle opening within 3 sty apartment.
Jul 15, 2015
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 3fl, 3rd story
Nov 14, 2012 · Apt 3FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 3fl, 3rd story
Nov 14, 2012 · Apt 3FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north and west walls in the 1st room from north located at apt 3fl, 3rd story
Nov 14, 2012 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Make safe by properly repairing the structural defect. wood floor in the 1st room from north located at apt 3fl, 3rd story
Nov 14, 2012 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Make safe by properly repairing the structural defect floors and ceiling and walls en1 and en2 room in the entire apartment located at apt 3fl, 3rd story
Nov 14, 2012 · Apt 3FL
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen and bathroom in the entire apartment located at apt 3fl, 3rd story
Nov 14, 2012 · Apt 3FL
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures outlet at north wall in the kitchen located at apt 1fl, 1st story
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet at toilet bowl in the bathroom located at apt 1fl
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 1fl
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 1fl
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 1fl, 1st story
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1fl, 1st story
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1fl, 1st story
Nov 2, 2012 · Apt 1FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 1fl, 1st story
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 1fl, 1st story
Nov 2, 2012 · Apt 1FL
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling 1 sq. ft. in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of gas to the fixtures .... in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents rats in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric light fixture at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at all walls and ceilings throughout in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at west wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose convector radiator and enclosure at north wall in the 3rd room from north located at apt 2, 2nd story, 1st apartment from north at east
Aug 10, 2012 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2fl, 2nd story, apartment at south
Aug 6, 2012 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story, apartment at south
Aug 6, 2012 · Apt 2FL
Closed — Violation closed
DOB building violations · 26
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 30, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 30, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 30, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 27, 2013
Dob violation - active - Emergency none
Egncy-emergency none
Jan 31, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - active
Show 16 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active
ECB violations · 14
- Class - 2
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances,or wiring in use. observed at the front of the pharmacy inside the awning splices made w/o junction boxes or approve boxe
Dec 26, 2019 · Penalty $2,000
Resolve - Class - 1
Incorrect size flue piping, chimney not sealed, cease use water heater, maintain boiler; correct all listed violations
Jul 30, 2019 · Penalty $6,250
Active - Class - 1
Incorrect flue pipe size chimney not sealed.cease use water heaters, maintain boiler; correct violation
Jul 30, 2019 · Penalty $6,250
Active - Class - 1
Incorrect flue size, chimney not sealed. cease use water heaters, maintain boiler; correct all listed violations
Jul 30, 2019 · Penalty $6,250
Active - Class - 1
Unlawful acts failure to comply w/an order of the commissioner.noted:on 8/6/09, a swo#2893 and violation #34788035h was written for supported scaffold does not meet code specification.in the body of the viola-
Mar 9, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/an order of commissioner. unlawful acts.failure tocoply w/commissioner's vacate order no.397/12 to vacate the 2nd & 3rd flrs due to instability of structure.at time of inspection observed 2n
Dec 11, 2012 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: cellar ceiling/1st flr joist in disrepair, temporarily suppoeted by lally columns.interior of 2nd and 3rd flrs defective. walls separating from ceiling
Dec 4, 2012 · Penalty $1,000
Active - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34955197x issued on 8/4/12 pursuant to 28-204.4 & 1rcny 102-01. for failure to maintain conditions.
Oct 17, 2012 · Penalty $800
Resolve - Class - 1
Failure to maintain building noted: at interior public stair between 1st & 2nd & 2nd & 3rd floors sagging w/2nd floor hall buckled & slopingoff level,building leaning noticeably at street facing elevation,out
Aug 4, 2012 · Penalty $1,000
Active - Class - 2
Failure to maintain bldg interior:defect noted:cellar ceiling/1st flr joist in disrepair,@ exposure#4 interior wall beams rotted/beams rotted where seated on foundation wall,interior staircase to cellar leaning
Jul 29, 2010 · Penalty $500
Active
Show 4 more ↓
- Class - 1
Supported scaffold does not meet building code specification. -noted scaffold at exp# 1. there are adequate tie ins (1) one plank work surface approx 9.5" that is not secured and extended over 18' past brace an
Aug 6, 2009 · Penalty $1,600
Active - Class - 1
Erected supported scaffold 40 feet of higher w/o a permit -noted scaffold at exp #1 approx 42' high. there are no permits as per dob database. swo written 7-30-09 by j. cobien #2893 rem:obtain a permit.
Aug 6, 2009 · Penalty $1,200
Resolve - Hazardous
Failure to maintain exterior building wall: defect is a piece of parapet 4'x4' missing from front of building noted defective rear wall, defective chimneys missing leaders & gutters at rear. remedy: maintain ex
Dec 20, 2002 · Penalty $800
Active - Non-hazardous
Occupancy contrary to that allowed by building department reocrds. from a 2 family apartment one each floor 2nd and 3rd to 3 apartment each floor. 2nd and 3rd. remedy:discontinue the illegal occupancy or
Mar 18, 1991 · Penalty $285
Active
Complaints
- Plumbing
Radiator
May 18, 2026 · Apt 2
Close - Plumbing
Water supply
May 18, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Apr 17, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 2
Close - Electric
Power outage
Mar 22, 2022 · Apt 3
Close - Flooring/stairs
Floor
Nov 1, 2021 · Apt 3
Close - Unsanitary condition
Pests
Nov 1, 2021 · Apt 3
Close - Unsanitary condition
Pests
Nov 1, 2021 · Apt 3
Close - Unsanitary condition
Pests
Mar 17, 2021 · Apt 3
Close - Heat/hot water
Apartment only
Feb 10, 2021 · Apt 3FL
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 8, 2021 · Apt 3FL
Close - Door/window
Door
Jul 2, 2020 · Apt 3FL
Close - Heat/hot water
Apartment only
Dec 9, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Dec 3, 2019 · Apt 3
Close - Paint/plaster
Wall
Dec 3, 2019 · Apt 3
Close - Heat/hot water
Apartment only
Dec 3, 2019 · Apt 3
Close - Door/window
Door
Dec 3, 2019 · Apt 3
Close - Heat/hot water
Entire building
Aug 1, 2019 · Apt 1
Close - Electric
No lighting
Mar 23, 2018 · Apt BLDG
Close - Electric
No lighting
Mar 22, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 4, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 4, 2015 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 4, 2015 · Apt BLDG
Close - Safety
Smoke detector
Jul 15, 2015 · Apt 3
Close - Safety
Fire escape
Jul 15, 2015 · Apt 3
Close - General
Cooking gas
Jul 15, 2015 · Apt 3
Close - Door/window
Door
Apr 17, 2015 · Apt 2
Close - Safety
Fire escape
Apr 17, 2015 · Apt 2
Close - Safety
Carbon monoxide detector
Apr 17, 2015 · Apt 2
Close - Safety
Smoke detector
Apr 17, 2015 · Apt 2
Close - Plumbing
Bathtub/shower
Apr 17, 2015 · Apt 2
Close - Unsanitary condition
Pests
Apr 17, 2015 · Apt 2
Close - Unsanitary condition
Pests
Apr 17, 2015 · Apt 2
Close - Paint/plaster
Wall
Apr 17, 2015 · Apt 2
Close - Unsanitary condition
Mold
Apr 17, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Mar 12, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Mar 9, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Mar 5, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Feb 16, 2015 · Apt 2
Close - Electric
Electric-supply
Dec 31, 2014 · Apt 1
Close - Electric
Electric-supply
Dec 31, 2014 · Apt 1
Close - General
Floor
Dec 5, 2012 · Apt 3FL
Close - Heating
Heat related
Nov 13, 2012 · Apt 3FL
Close - Electric
Lighting
Nov 8, 2012 · Apt 1FL
Close - Plumbing
Bathtub/shower
Nov 8, 2012 · Apt 1FL
Close - Plumbing
Water-leaks
Oct 28, 2012 · Apt 1FL
Close - Plumbing
Shower-stall
Oct 28, 2012 · Apt 1FL
Close - Plumbing
Bathtub/shower
Oct 28, 2012 · Apt 1FL
Close - Plumbing
Toilet
Oct 28, 2012 · Apt 1FL
Close - Nonconst
Vermin
Oct 28, 2012 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1910
- Floors
- 3
- Residential units
- 2
- Building area
- 4,500 ft²
- Lot area
- 2,380 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3357 / 5
- Assessed value
- $143,280
- Landmark / historic district
- No
HPD registration #814318, last renewed Jul 7, 2026.
Questions about 1425 Broadway
Who owns 1425 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Joel Johnson, LLC.
Does 1425 Broadway have violations?
Yes. NYC HPD has recorded 78 housing violations at this property.
Is 1425 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1425 Broadway built?
City records list 1910 as the year it was built.
How many apartments are in 1425 Broadway?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.