roofy

364 Palmetto Street

Brooklyn, NY 11237BBL 3-03353-0008Map

Owner of record: 364 Palmetto LLC

364 Palmetto Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 364 Palmetto LLC. HPD has recorded 199 housing violations here, most recently on July 21, 2026. 8 of the 50 most recent violations are still open.

HPD violations
199
DOB violations
17
ECB violations
9
HPD complaints
227

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 199

  • B

    Remove all encumbrances consisting of house hold items at public hall, 3rd story

    Jul 21, 2026

    Open — Nov certified on time
  • B

    Provide slide bolt or hook on roof door that allow reentry to roof to bulk head at 1st public hall bulkhead from north, 3rd story

    Jul 21, 2026

    Open — Nov certified on time
  • C

    Provide ready access to buildings heating system door lock. at 1st boiler room from north

    Dec 20, 2025

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 20, 2025 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 20, 2025 · Apt 3R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling. in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 20, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 20, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 20, 2025 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling. in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 20, 2025 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Aug 13, 2025 · Apt 3L

    Open — Invalid certification
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Aug 13, 2025 · Apt 3L

    Open — Invalid certification
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt unit3l, 3rd story, 1st apartment from west at north

    Jun 15, 2025 · Apt UNIT3L

    Open — Notice of issuance sent to tenant
  • B

    Remove all encumbrances consisting of large amount of mail at public hall, 1st story

    Jun 15, 2025

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jan 22, 2025 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jan 22, 2025 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jan 22, 2025 · Apt 1R

    Closed — Violation dismissed
  • B

    Refit apt door in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    Jan 22, 2025 · Apt 1R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 1r, 1st story, 1st apartment from west at north

    Dec 22, 2024 · Apt 1R

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Dec 22, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked leading to basement at boiler room

    Dec 22, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 1, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 12, 2021

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of several decorative faux timber joists at the ceiling of the 1st story public hall

    May 2, 2019

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of timber panels on walls of the public hall stair bulkhead

    May 2, 2019

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of timber panels on walls of the 1st, 2nd and 3rd story public hall

    May 2, 2019

    Closed — Violation dismissed
  • C

    Properly secure the loose wire glass at sky light in the 2nd room from north located at apt 3r, 3rd story, 1st apartment from south at west

    Mar 6, 2018 · Apt 3R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 3a, 3rd story, 1st apartment from north at east

    Oct 25, 2016 · Apt 3A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective paint and plaster at ceiling at public hall, 1st story

    Jul 28, 2016

    Closed — Violation closed
  • C

    Properly repair the broken or defective door at entrance at public hall, 1st story

    Mar 8, 2016

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling at public hall, 2nd story

    Mar 8, 2016

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Mar 8, 2016

    Closed — Violation closed
  • C

    Remove all obstructions and repair all defects in wash basin in the bathroom located at apt 1b, 1st story, 1st apartment from south at west

    Mar 8, 2016 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair the broken or defective lower sash window balances in the 1st room from north located at apt 1b, 1st story, 1st apartment from south at west

    Mar 8, 2016 · Apt 1B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Mar 8, 2016 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Mar 8, 2016 · Apt 1B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color dry wall at south wall in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Sep 23, 2015 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair the broken or defective window spring balances lower sash off set #1 and #2 windows. in the 1st room from north located at apt 1b, 1st story, 1st apartment from south at west

    Sep 23, 2015 · Apt 1B

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures electric wall outlets at east, west, and north walls. in the 4th room from north located at apt 1b, 1st story, 1st apartment from south at west

    Sep 23, 2015 · Apt 1B

    Closed — Violation closed
  • B

    Replace with new the broken or defective wood door in the 4th room from north located at apt 1b, 1st story, 1st apartment from south at west

    Sep 23, 2015 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of loose ceiling light fixture. in the 3rd room from north located at apt 3, 1st story

    Aug 12, 2015 · Apt 3

    Closed — Violation closed
  • C

    Abate the nuisance consisting of rodents in the entire apartment located at apt 3, 3rd story

    Aug 12, 2015 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3, 3rd story

    Aug 12, 2015 · Apt 3

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in the kitchen located at apt 3, 3rd story

    Aug 12, 2015 · Apt 3

    Closed — Violation closed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires in panel box at cellar

    Jul 28, 2015

    Closed — Violation closed
  • C

    Replace with new the broken or defective offset #1 window outer glass pane lower sash in the 1st room from north located at apt 2a, 2nd story, 1st apartment from north at east

    Jul 28, 2015 · Apt 2A

    Closed — Violation closed
  • C

    Replace with new the broken or defective fire proof door in the entrance located at apt 2a, 2nd story, 1st apartment from north at east

    Jul 28, 2015 · Apt 2A

    Closed — Violation closed
  • C

    Replace with new the broken or defective wood door in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east

    Jul 28, 2015 · Apt 2A

    Closed — Violation closed
  • B

    Replace with new the broken or defective wood closet door in the private hallway located at apt 2a, 2nd story, 1st apartment from north at east

    Jul 28, 2015 · Apt 2A

    Closed — Violation closed
  • C

    Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east

    Jul 28, 2015 · Apt 2B

    Closed — Violation closed
  • C

    Properly repair the broken or defective apt door lockset in the entrance located at apt 2a, 2nd story, apartment at east

    Jun 30, 2015 · Apt 2A

    Closed — Violation closed

DOB building violations · 17

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 23, 2014

    Dob violation - dismissed
  • Construction other optional

    Stop all work contact borough commissioner office

    Apr 5, 2014

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 31, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
Show 7 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed

ECB violations · 9

  • Class - 2

    Failure to provide approved/accepted set of plans @ active job site @ time of insp. gut rehab under permit# 321502423 which expired on 2/12/17- as per permit posted. a crew of about 5 persons working on the 4 l

    Apr 11, 2017

    Resolve
  • Class - 2

    Unapproved/unsafe unsuitable electrical equipment devices apparatus materials appliances or wiring in use.defective outlets in apt 2a 3r & bsmt wiring by service area.rem:comply w/ ec code.

    Apr 23, 2014 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to provide adequate circuit overcurrent protection device per table.#2 thhn fused @ 200 amps in bsmt panel.rem:provide adequate overcurrent protection.

    Apr 23, 2014 · Penalty $10,000

    Resolve
  • Class - 3

    Failure to use approved conductors & or equipment.line & low voltage conductors in same raceway.rem:provide approved conductors/equipment.

    Apr 23, 2014 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.noted:in apartment 3r an accumulation of const debris & material stored up in apartment.throughout creating a fire hazard.storage of insulation old plaste & lum

    Apr 23, 2014 · Penalty $5,000

    Resolve
  • Class - 2

    Fail to maintain building in code-compliant manner.noted:thruout all apartments there are cracks above door openings & separations in ceiling from partitions.also sheetrock bulging from ceiling leaks some broke

    May 10, 2013 · Penalty $250

    Resolve
  • Class - 2

    B254,61,24b,34b,50,50a. 50-expansion tank defective. 50a-boiler feed direct into cast iron boiler.

    Mar 15, 2013 · Penalty $500

    Active
  • Class - 1

    Failure to maintain in code-compliant manner. noted: 2nd flr apt 2 rear - duo to water damage - rear walls damage w/molds spore growth (extension), missing sheetrock at apt 1 "b" extensive water damage to wall

    Apr 28, 2009 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code comliant manner. noted defect: 1) rear fire escape missingg gooseneck ladder obstruction roof access. 2) there exists water seepage throughout interior sheetrock walls inside

    Oct 17, 2008 · Penalty $5,000

    Resolve

Complaints

  • Water leak

    Slow leak

    Jul 18, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 3R

    Close
  • Unsanitary condition

    Mold

    Dec 16, 2025 · Apt 3R

    Close
  • Paint/plaster

    Wall

    Dec 16, 2025 · Apt 3R

    Close
  • Unsanitary condition

    Mold

    Jul 31, 2025 · Apt 3L

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2025 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Jun 10, 2025 · Apt UNIT3L

    Close
  • Heat/hot water

    Apartment only

    Dec 24, 2024 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Dec 20, 2024 · Apt 1R

    Close
  • Door/window

    Window frame

    Mar 5, 2018 · Apt 3R

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Mar 5, 2018 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2016 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Apr 13, 2016 · Apt 1B

    Close
  • Door/window

    Window frame

    Apr 13, 2016 · Apt 1B

    Close
  • Door/window

    Door

    Mar 3, 2016 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Mar 3, 2016 · Apt 1B

    Close
  • Plumbing

    Basin/sink

    Mar 3, 2016 · Apt 1B

    Close
  • Door/window

    Window frame

    Mar 3, 2016 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Mar 3, 2016 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Oct 8, 2015 · Apt 2A2L

    Close
  • Heat/hot water

    Entire building

    Oct 7, 2015 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Aug 30, 2015 · Apt 2B

    Close
  • Door/window

    Window frame

    Jun 9, 2015 · Apt 2A

    Close
  • Door/window

    Door

    Jun 9, 2015 · Apt 2A

    Close
  • Paint/plaster

    Wall

    May 1, 2015 · Apt 2L

    Close
  • Door/window

    Door

    May 1, 2015 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2015 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2015 · Apt 3L

    Close
  • Plumbing

    Water supply

    Oct 7, 2014 · Apt 2A

    Close
  • Plumbing

    Water supply

    Sep 19, 2014 · Apt 2A

    Close
  • Plumbing

    Water supply

    Sep 15, 2014 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Feb 12, 2014 · Apt 1B

    Close
  • Plumbing

    Basin/sink

    Feb 12, 2014 · Apt 2A

    Close
  • Nonconst

    Rubbish

    Feb 12, 2014 · Apt 1B

    Close
  • General

    Floor

    Feb 12, 2014 · Apt 1B

    Close
  • Nonconst

    Rubbish

    Feb 12, 2014 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Feb 12, 2014 · Apt 1B

    Close
  • Nonconst

    Smoke detector

    Feb 12, 2014 · Apt 1B

    Close
  • Nonconst

    Carbon monoxide

    Feb 12, 2014 · Apt 1B

    Close
  • Heating

    Heat related

    Feb 12, 2014 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Feb 12, 2014 · Apt 1B

    Close
  • General

    Windows

    Feb 12, 2014 · Apt 1B

    Close
  • General

    Doors

    Feb 12, 2014 · Apt 1B

    Close
  • Electric

    Wiring

    Feb 12, 2014 · Apt 1B

    Close
  • General

    Window guards

    Feb 12, 2014 · Apt 1B

    Close
  • General

    Windows

    Feb 12, 2014 · Apt 3A

    Close
  • General

    Floor

    Feb 12, 2014 · Apt 3A

    Close
  • Electric

    Wiring

    Feb 12, 2014 · Apt 2A

    Close
  • General

    Window guards

    Feb 12, 2014 · Apt 2A

    Close
  • General

    Floor

    Feb 12, 2014 · Apt 2A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
5,100 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3353 / 8
Assessed value
$561,600
Landmark / historic district
No

HPD registration #304964, last renewed Sep 13, 2025.

Questions about 364 Palmetto Street

Who owns 364 Palmetto Street?

The owner of record in NYC Department of City Planning PLUTO data is 364 Palmetto LLC.

Does 364 Palmetto Street have violations?

Yes. NYC HPD has recorded 199 housing violations at this property.

Is 364 Palmetto Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 364 Palmetto Street built?

City records list 1931 as the year it was built.

How many apartments are in 364 Palmetto Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.