1507 Gates Avenue
Brooklyn, NY 11237BBL 3-03336-0028Map
Owner of record: Gates Living LLC
1507 Gates Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is Gates Living LLC. HPD has recorded 221 housing violations here, most recently on September 23, 2026. 11 of the 50 most recent violations are still open.
- HPD violations
- 221
- DOB violations
- 5
- ECB violations
- 2
- HPD complaints
- 53
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 221
- ANon-hazardous
Properly repair with similar material the broken or defective wooden window casing at 1st and 2nd window from west at north in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Sep 23, 2026 · Apt 3L
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall and ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Sep 23, 2026 · Apt 3L
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Sep 23, 2026 · Apt 3L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 13, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 13, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 6, 2026 · Apt 3R
Open — Defect letter issued - BHazardous
Properly repair or replace the broken or defective counter top at sink in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 6, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 6, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 6, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq. ft. at south wall in the bathroom located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 6, 2026 · Apt 3R
Open — Defect letter issued
Show 40 more ↓
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout at basement
Apr 6, 2026
Open — Not complied with - BHazardous
Replace with new the missing electrical outlet cover plate at south wall in the 3rd room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 6, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 6, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Apr 6, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling ceiling in the kitchen located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approx 8 sq feet at the ceiling in the kitchen located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation dismissed - BHazardous
Replace with new the missing ontlet cover at the west wall in the 2nd room from north located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling ( tin ceiling in this room ) in the 5th room from north located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 2nd room from north located at apt 3r, 3rd story, 2nd apartment from north at east
Mar 18, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 3rd door frame from west at north wall in the 4th room from north located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 5th room from north located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the entrance door in the 3rd room from north located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department entrance door 3rd door from west at north wall in the 4th room from north located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3r, 3rd story, 2nd apartment from west at north
Feb 18, 2026 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Sep 25, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Sep 25, 2025 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Dec 2, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Dec 2, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Dec 2, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Dec 2, 2024 · Apt 1R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove device preventing door from being self-closing permanently installed sweep and kickstand at bottom of door keeping it from being self closing in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Dec 2, 2024 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical outlets and light fixtures troughout in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Dec 2, 2024 · Apt 1R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2024
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from south at west
Jan 20, 2024 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 3r, 3rd story, 2nd apartment from south at west
Jan 20, 2024 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Jan 20, 2024 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Jan 20, 2024 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Jan 20, 2024 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Jan 20, 2024 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at west
Jan 20, 2024 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Nov 14, 2022 · Apt 3R
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active
ECB violations · 2
- Class - 2
No manual reset low water cut off. holes in ceiling. sign on door. correct all violations
Oct 16, 2020 · Penalty $625
Active - Hazardous
No manual pressure control
Feb 16, 1989 · Penalty $150
Resolve
Complaints
- Water leak
Heavy flow
Jul 29, 2026 · Apt 3L
Close - Paint/plaster
Ceiling
Jul 29, 2026 · Apt 3L
Close - Paint/plaster
Wall
Jul 29, 2026 · Apt 3L
Close - Water leak
Slow leak
Apr 5, 2026 · Apt 1R
Close - Unsanitary condition
Pests
Apr 5, 2026 · Apt 1R
Close - Unsanitary condition
Pests
Apr 5, 2026 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Apr 5, 2026 · Apt 1R
Close - Paint/plaster
Ceiling
Apr 5, 2026 · Apt 1R
Close - Unsanitary condition
Mold
Feb 6, 2026 · Apt 3R
Close - Paint/plaster
Ceiling
Feb 6, 2026 · Apt 3R
Close
Show 40 more ↓
- Water leak
Heavy flow
Jan 23, 2026 · Apt 3R
Close - Electric
Power outage
Sep 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Electric
Power outage
Dec 1, 2024 · Apt 1R
Close - Heat/hot water
Apartment only
Dec 1, 2024 · Apt 1R
Close - Paint/plaster
Ceiling
Jan 19, 2024 · Apt 3R
Close - Paint/plaster
Wall
Nov 10, 2022 · Apt 3R
Close - Flooring/stairs
Floor
Nov 10, 2022 · Apt 3R
Close - Unsanitary condition
Mold
Nov 10, 2022 · Apt 3R
Close - Paint/plaster
Window/frame
Nov 10, 2022 · Apt 3R
Close - Unsanitary condition
Pests
Nov 10, 2022 · Apt 3R
Close - Water leak
Slow leak
Nov 10, 2022 · Apt 3R
Close - Door/window
Door
Feb 3, 2020 · Apt BLDG
Close - Safety
Fire escape
Feb 3, 2020 · Apt BLDG
Close - Safety
Window guard broken/missing
Feb 3, 2020 · Apt 3R
Close - Unsanitary condition
Pests
Dec 5, 2019 · Apt 3R
Close - Unsanitary condition
Pests
Dec 5, 2019 · Apt 3R
Close - Safety
Smoke detector
Dec 5, 2019 · Apt 3R
Close - Safety
Carbon monoxide detector
Dec 5, 2019 · Apt 3R
Close - Unsanitary condition
Pests
Dec 5, 2019 · Apt 2R
Close - Unsanitary condition
Pests
Dec 5, 2019 · Apt 1L
Close - Unsanitary condition
Pests
Dec 5, 2019 · Apt 1L
Close - Paint/plaster
Wall
Dec 19, 2015 · Apt 3
Close - Paint/plaster
Ceiling
Dec 19, 2015 · Apt 3
Close - Paint/plaster
Ceiling
Dec 19, 2015 · Apt 3
Close - Unsanitary condition
Pests
Jun 13, 2015 · Apt 3L
Close - Heat/hot water
Apartment only
Jan 31, 2015 · Apt 1R
Close - Heating
Heat related
Feb 18, 2014 · Apt NA
Close - Heating
Heat related
Dec 28, 2013 · Apt 3L
Close - Heating
Heat related
Dec 25, 2013 · Apt NA
Close - Heating
Heat related
Dec 22, 2013 · Apt NA
Close - Heating
Heat related
Dec 21, 2013 · Apt NA
Close - Heating
Heat related
Oct 23, 2013 · Apt 2L
Close - Heating
Heat related
Jul 9, 2012 · Apt 1R
Close - Heating
Heat related
Jul 9, 2012 · Apt 2L
Close - Nonconst
Vermin
Aug 13, 2008 · Apt 2R
Close - Paint/plaster
Wall
Aug 13, 2008 · Apt 2R
Close - Nonconst
Vermin
Aug 13, 2008 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 3,750 ft²
- Lot area
- 1,875 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3336 / 28
- Assessed value
- $477,900
- Landmark / historic district
- No
HPD registration #318444, last renewed Sep 24, 2025.
Questions about 1507 Gates Avenue
Who owns 1507 Gates Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Gates Living LLC.
Does 1507 Gates Avenue have violations?
Yes. NYC HPD has recorded 221 housing violations at this property.
Is 1507 Gates Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1507 Gates Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 1507 Gates Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.