358 Grove Street
Brooklyn, NY 11237BBL 3-03328-7501Map
Owner of record: Unavailable Owner
358 Grove Street is a condominium built in 2007 in Brooklyn, 11237. It has 59 residential units across 13 floors. The owner of record is Unavailable Owner. HPD has recorded 54 housing violations here, most recently on May 8, 2026. 2 of the 50 most recent violations are still open.
- HPD violations
- 54
- DOB violations
- 36
- ECB violations
- 15
- HPD complaints
- 213
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
May 4, 2023 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 9e, 9th story, 1st apartment from north at east
Nov 21, 2022 · Apt 9E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Nov 21, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 14d, 14th story, 1st apartment from north at east
Nov 15, 2022 · Apt 14D
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Nov 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 14d, 14th story, 1st apartment from north at east
Nov 15, 2022 · Apt 14D
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2e, 1st story, 1st apartment from north at east
Nov 13, 2022 · Apt 2E
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2019
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Replace with new the broken or defective electrical outlet cover at west wall at public hall, 9th story
Sep 18, 2019
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety cover for electrical outlet at west wall at public hall, 9th story
Sep 18, 2019
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing safety cover for electrical outlet at west wall at public hall, 1st story
Sep 18, 2019
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 9d, 9th story, 2nd apartment from north at east
Sep 18, 2019 · Apt 9D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 9d, 9th story, 2nd apartment from north at east
Sep 18, 2019 · Apt 9D
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9d, 9th story, 2nd apartment from north at east
Sep 18, 2019 · Apt 9D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9a, 9th story, 1st apartment from south at west
Sep 12, 2019 · Apt 9A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace with new the broken or defective rotted metal flue pipes in boiler room at cellar
Sep 12, 2019
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors at compactor closet, 14th story
Sep 12, 2019
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system no location at notice at public hall, 1st story
Sep 12, 2019
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 14d, 14th story, 1st apartment from north at east
Sep 12, 2019 · Apt 14D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 14d, 14th story, 1st apartment from north at east
Sep 12, 2019 · Apt 14D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east located at apt 14d, 14th story, 1st apartment from north at east
Sep 12, 2019 · Apt 14D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 14d, 14th story, 1st apartment from north at east
Sep 12, 2019 · Apt 14D
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 14d, 14th story, 1st apartment from north at east
Sep 12, 2019 · Apt 14D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 14d, 14th story, 1st apartment from north at east
Sep 12, 2019 · Apt 14D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at wash basin , sink and bathtub in the entire apartment located at apt 14d, 14th story, 1st apartment from north at east
Sep 12, 2019 · Apt 14D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9a, 9th story, 1st apartment from south at west
Sep 12, 2019 · Apt 9A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 12, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 24, 2018
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling over window in the 1st room from north at east located at apt 4d, 4th story, 2nd apartment from west at north
Jul 25, 2018 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north at east located at apt 4d, 4th story, 2nd apartment from west at north
Jul 25, 2018 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the bathroom located at apt 14d, 14th story, 1st apartment from north at east
Mar 7, 2018 · Apt 14D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 14d, 14th story, 1st apartment from north at east
Mar 7, 2018 · Apt 14D
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 26, 2017
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 14d, 14th story, 1st apartment from west at north
Aug 24, 2017 · Apt 14D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north located at apt 14d, 14th story, 1st apartment from west at north
Aug 24, 2017 · Apt 14D
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 14d, 14th story, 1st apartment from west at north
Aug 24, 2017 · Apt 14D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 14d, 14th story, 1st apartment from west at north
Aug 24, 2017 · Apt 14D
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 24, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 24, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 24, 2017
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 24, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 24, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 14d, 14th story, 1st apartment from west at north
Aug 24, 2017 · Apt 14D
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing elecrtical caps at south wall at public hall, 14th story
Aug 24, 2017
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 24, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 24, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Apr 11, 2015
Closed — Violation dismissed
DOB building violations · 36
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2021
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 3, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed
Show 26 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 3, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Apr 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 30, 2014
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 25, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 10, 2010
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2008
Dob violation - resolved
ECB violations · 15
- Class - 1
Class 1: upon inspection found device to be out of service. this presents a hazzardous condition to residents & emergency responders. restore to service repair immediately as per 1rcny 11-02. when service resto
Sep 7, 2023
Resolve - Class - 1
Failure to maintain; prohibited material i observed in laundry room in the cellar several gas dryers installed with gas flex connections which is prohibited and not code compliant and needs to be hard piped. ,
Sep 10, 2019 · Penalty $1,250
Resolve - Class - 1
Flue pipe collapsed, boiler c/u. do not operate boiler until all haz. cond. are corr.& dob is notified to lift the c/u
Sep 10, 2019
Resolve - Class - 1
Collapsed flue pipe, boiler cease use,do not operate until all hazardous conditions are corrected& dob is notified to lift cease use
Sep 10, 2019
Resolve - Class - 1
I observed in cellar boiler room for 7 gas boilers flu piping all rotted allowing high levels of carbon monoxide to escape into boiler room which is prohibited, not code complaint and very dangerous , repair an
Sep 10, 2019 · Penalty $1,250
Resolve - Class - 1
Flue pipe collapsed, boiler cease use. do not operate boiler until all hazardous conditions are corrected and dob is notified to lift c/u
Sep 10, 2019 · Penalty $1,250
Resolve - Class - 1
Flue pipe collapsed,boiler c/u. do not operate boiler until all haz. cond. are corr.&dob is notified to lift c/u
Sep 10, 2019
Resolve - Class - 1
Flue pipe collapsed,boiler cease use.do not operate boiler until all haz. cond. are corr.&dob is notified to lift c/u
Sep 10, 2019
Resolve - Class - 1
Flue pipe collapsed. boiler c/u. do not operate boiler until all haz. cond. are corr.& dob is notified to lift c/u
Sep 10, 2019
Resolve - Class - 1
Flue pipe collapsed.boiler cease use. do not operate boiler untill all hazardous conditions are immediately corrected¬ify dob to re-inspect to lift the cease use order 212 393 2694
Sep 10, 2019
Resolve
Show 5 more ↓
- Class - 1
Unlawful act,failure to comply with an order of the commissioner.records indicate no application filedto correct,certify & remove violation contained in summons #35343195l & #35313547z.rem:comply with commison
Oct 19, 2018 · Penalty $6,250
Resolve - Class - 1
Unlawful act,failure to comply with an order of the commissioner.records indicate no application filed to correct,certify,and remove violations contained in summons #35313547z.rem:comply with commissioners orde
Aug 27, 2018
Resolve - Class - 1
Ec314.25.misc violations of the electrical code technical standard.observed at front of building on wheel chair ramp and front steps are exposed live wires above the handrail can be touched is hazardous and dan
Jul 11, 2018 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit.based on physical observation,reinspection & search or departmental records,no permits was issued replacement of standpiperiser valves from cellar through 9th floors.in complaint #3315412 fdny
Aug 13, 2009 · Penalty $1,600
Resolve - Hazardous
Vertical safety netting not provided upon inspection of above address forming at 11thfl,masonary work & forming throughout the bldg.verticalsafety netting from 10th to 1stfl just hooked at ring for safety
Jul 13, 2006 · Penalty $2,000
Resolve
Complaints
- Water leak
Heavy flow
Sep 30, 2026 · Apt 10D
Close - Unsanitary condition
Mold
Sep 30, 2026 · Apt 10D
Close - Paint/plaster
Ceiling
Sep 30, 2026 · Apt 10D
Close - Heat/hot water
Entire building
Oct 13, 2025 · Apt 6E
Close - Plumbing
Water supply
Apr 30, 2025 · Apt BLDG
Close - Plumbing
Water supply
Feb 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Door/window
Door
Dec 17, 2024 · Apt BUILDI
Close - Heat/hot water
Entire building
Nov 15, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 9, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jun 11, 2024 · Apt 9E
Close - Heat/hot water
Entire building
May 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2023 · Apt BLDG
Close - Safety
Fire escape
May 21, 2023 · Apt BLDG
Close - Plumbing
Basin/sink
May 7, 2023 · Apt 11C
Close - Door/window
Window frame
May 7, 2023 · Apt 11C
Close - Plumbing
Basin/sink
May 7, 2023 · Apt 11C
Close - Heat/hot water
Entire building
May 3, 2023 · Apt 3A
Close - Heat/hot water
Entire building
May 2, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Apr 28, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 27, 2022 · Apt 11B
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt 9B
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt 14D
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt 14D
Close - Heat/hot water
Apartment only
Dec 23, 2022 · Apt 14D
Close - Heat/hot water
Entire building
Dec 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 13, 2022 · Apt 8A
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2022 · Apt 5A
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt 9D
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt 9E
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt 3A
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt 14D
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2007
- Floors
- 13
- Residential units
- 59
- Building area
- 49,867 ft²
- Lot area
- 20,000 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3328 / 7501
- Assessed value
- $5,760,059
- Landmark / historic district
- No
HPD registration #381220, last renewed Sep 12, 2025.
Questions about 358 Grove Street
Who owns 358 Grove Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 358 Grove Street have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 358 Grove Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 358 Grove Street built?
City records list 2007 as the year it was built.
How many apartments are in 358 Grove Street?
It has 59 residential units and 125 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.