58 Menahan Street
Brooklyn, NY 11221BBL 3-03314-0023Map
Owner of record: Raka Realty Corp.
58 Menahan Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 5 residential units across 3 floors. The owner of record is Raka Realty Corp.. HPD has recorded 165 housing violations here, most recently on February 13, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 165
- DOB violations
- 11
- ECB violations
- 3
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 165
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ...missing located at apt 1, 1st story, 1st section from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules ...missing located at apt 1, 1st story, 1st section from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...door and frame at vestibule door , 1st story
Feb 13, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective ...glass panel at vestibule door , 1st story
Feb 13, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective connection ... at waste line at sink in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in ... waste line at sink in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ...at ceiling and all walls in the 1st room from north at east located at apt 1, 1st story, 1st apartment from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ...light fixture at ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ... porcelain enamel finish by method of glazing at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 13, 2026 · Apt 1
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 9, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 9, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 9, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 9, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 9, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 9, 2025
Open — Nov sent out - BHazardous
Refit the building entrance door
Jul 9, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at building front
Jul 9, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 9, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jul 9, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jul 9, 2025 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jul 9, 2025 · Apt 1STFLO
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jul 9, 2025 · Apt 1STFLO
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked leading to basement at boiler room
Jul 9, 2025
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jul 9, 2025 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from north at east
Jul 9, 2025 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame at public hall, 1st story
Jul 9, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 26, 2025 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 26, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 26, 2025 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 26, 2025 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 26, 2025 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Jun 26, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jun 26, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective door frame at building front entrance door , 1st story
Jun 25, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective latch at vestibule door , 1st story
Jun 25, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household articles at public hall, 1st story
Feb 14, 2025
Open — Nov sent out - BHazardous
Repair or replace the smoke detector that is defective in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Feb 14, 2025 · Apt 1L
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story
Feb 14, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box [ missing notice ] at public hall, 1st story
Feb 14, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Feb 14, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Feb 14, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Feb 14, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at building entrance door , 1st story
Feb 14, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story
Feb 14, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance door , 1st story
Feb 14, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum temperature of 130 degrees fahrenheit in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
Feb 14, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 1l, 1st story, 1st apartment from east at south
Feb 14, 2025 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from east at south
Feb 14, 2025 · Apt 1L
Open — Notice of issuance sent to tenant
DOB building violations · 11
- Construction other optional
C-construction other optional
Dec 29, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
Show 1 more ↓
- Boiler boiler optional
B-boiler boiler optional
Dec 9, 1991
Vp*-violation unserved ecb- dismissed
ECB violations · 3
- Class - 1
Work w/o a permit. gut rehab in progress @the cellar @the time of inspection. full height partitions erected to enclose bathrooms (integrating new electric, plumbing/drains) living areas etc; work is 80%complet
Sep 16, 2014 · Penalty $800
Active - Non-hazardous
24a,24b. coil box corroded and leaking.
Dec 9, 1991
Resolve - Non-hazardous
Flue damper not working properly.
Mar 1, 1989
Resolve
Complaints
- Unsanitary condition
Pests
Oct 9, 2026 · Apt 2L
Open - Unsanitary condition
Sewage
Oct 9, 2026 · Apt 2L
Open - Unsanitary condition
Garbage/recycling storage
Oct 9, 2026 · Apt 2L
Open - Heat/hot water
Apartment only
Feb 27, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jul 8, 2025 · Apt 1STFLO
Close - Unsanitary condition
Pests
Jul 8, 2025 · Apt 1STFLO
Close - Unsanitary condition
Pests
Jul 8, 2025 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jun 25, 2025 · Apt 1
Close - Paint/plaster
Wall
Apr 7, 2025 · Apt 2L
Close
Show 40 more ↓
- Paint/plaster
Wall
Apr 7, 2025 · Apt 2L
Close - Water leak
Slow leak
Apr 7, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 14, 2025 · Apt 1L
Close - Safety
Smoke detector
Feb 14, 2025 · Apt 1L
Close - Safety
Carbon monoxide detector
Feb 14, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Feb 14, 2025 · Apt 1L
Close - Unsanitary condition
Pests
Feb 14, 2025 · Apt 1L
Close - Paint/plaster
Ceiling
Feb 14, 2025 · Apt 1L
Close - Water leak
Heavy flow
Jan 15, 2025 · Apt FIRSTF
Close - Paint/plaster
Wall
Jan 15, 2025 · Apt FIRSTF
Close - Flooring/stairs
Floor
Jan 15, 2025 · Apt FIRSTF
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt BASEME
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt 1FLOOR
Close - Water leak
Slow leak
Jul 21, 2024 · Apt APARTM
Close - Flooring/stairs
Floor
Jul 21, 2024 · Apt APARTM
Close - Paint/plaster
Wall
Jul 21, 2024 · Apt APARTM
Close - Unsanitary condition
Mold
Jun 27, 2024 · Apt 2L
Close - Paint/plaster
Wall
Jun 27, 2024 · Apt 2L
Close - Water leak
Slow leak
Jun 27, 2024 · Apt 2L
Close - Unsanitary condition
Pests
Jun 27, 2024 · Apt 2L
Close - Plumbing
Water supply
Mar 17, 2023 · Apt 2L
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt 2L
Close - Paint/plaster
Ceiling
Aug 7, 2022 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 1, 2019 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 14, 2017 · Apt 1
Close - Heat/hot water
Entire building
Apr 30, 2014 · Apt BLDG
Close - General
Window guards
Feb 25, 2014 · Apt 3L
Close - General
Window guards
Feb 25, 2014 · Apt 3L
Close - General
Window guards
Feb 25, 2014 · Apt 3L
Close - Heating
Heat related
Apr 13, 2009 · Apt 2L
Close - Heating
Heat related
Dec 27, 2005 · Apt BLDG
Close - Heating
Heat related
Dec 20, 2004 · Apt BLDG
Close - Heating
Heat related
Nov 8, 2004 · Apt 3L
Close - Heating
Heat related
Oct 23, 2004 · Apt 3L
Close - Heating
Heat related
Oct 19, 2004 · Apt ALL
Close - Paint/plaster
Wall
Sep 14, 2004 · Apt 3L
Close - General
Mold
Sep 14, 2004 · Apt 3L
Close - General
Mold
Sep 14, 2004 · Apt 3L
Close - Plumbing
Water-leaks
Sep 14, 2004 · Apt 3L
Close - Paint/plaster
Wall
Sep 14, 2004 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 5
- Building area
- 4,125 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3314 / 23
- Assessed value
- $631,350
- Landmark / historic district
- No
HPD registration #304271, last renewed Oct 24, 2025.
Questions about 58 Menahan Street
Who owns 58 Menahan Street?
The owner of record in NYC Department of City Planning PLUTO data is Raka Realty Corp..
Does 58 Menahan Street have violations?
Yes. NYC HPD has recorded 165 housing violations at this property.
Is 58 Menahan Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 58 Menahan Street built?
City records list 1931 as the year it was built.
How many apartments are in 58 Menahan Street?
It has 5 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.