347 Bleecker Street
Brooklyn, NY 11237BBL 3-03301-0042Map
Owner of record: Cecil 347, LLC
347 Bleecker Street is a walk-up apartment building built in 1899 in Brooklyn, 11237. It has 3 residential units across 2 floors. The owner of record is Cecil 347, LLC. HPD has recorded 46 housing violations here, most recently on February 12, 2026. 1 of the 46 most recent violations are still open.
- HPD violations
- 46
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 61
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 46
- CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees at all hotwater fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west
Feb 12, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1b, 1st story, 1st apartment from south at west
Feb 12, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system from first story public hall to boiler room at public hall, 1st story
Jun 27, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 3rd story, 1st apartment from south at west
Jun 27, 2024 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jun 27, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 27, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Jun 27, 2024
Closed — Violation dismissed
Show 36 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 21, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 23, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 23, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 7, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
May 22, 2019
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of 1/2 inch gap between door frame and door in the entrance located at apt 3, 3rd story, 1st apartment from north at east
May 22, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
May 22, 2019 · Apt 3
Closed — Violation closed - ANon-hazardous
Refit .. in the entrance located at apt 3, 3rd story, 1st apartment from north at east
May 22, 2019 · Apt 3
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective rotted wood backsplash at sink countertop in the kitchenette located at apt 3, 3rd story, 1st apartment from north at east
May 22, 2019 · Apt 3
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ***minimum 100 watts of incandescent light required***
Sep 2, 2010
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at front door to building
Apr 14, 2010
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door from west at north wall, 1st door frame from west at north wall, north wall, south wall, west wall in the 3rd room from north located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from west at north wall, west wall, 1st wall cabinet from north at east wall, 1st window frame from south at west wall in the 2nd room from north at west located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 4th room from north at west located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from west at north wall in the kitchen located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from north at east wall in the private hallway located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st closet from west at north wall wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 4th room from north at east located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north at west located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall, north wall, ceiling in the 4th room from north at west located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling in the 3rd room from north located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall, ceiling in the 1st room from north at west located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, ceiling, east wall in the private hallway located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at east located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3fl, 3rd story, 1st apartment from west at north
Jul 24, 2009 · Apt 3FL
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watt minimum required fixture present light not on
Apr 3, 1999
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Sewage
Mar 9, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Apr 18, 2019 · Apt 3
Close - General
Bell/buzzer/intercom
Apr 18, 2019 · Apt 3
Close - General
Cabinet
Apr 18, 2019 · Apt 3
Close - Water leak
Slow leak
Apr 18, 2019 · Apt 3
Close - Unsanitary condition
Mold
Apr 18, 2019 · Apt 3
Close - Door/window
Door frame
Apr 18, 2019 · Apt 3
Close - Unsanitary condition
Pests
Jun 12, 2018 · Apt 3
Close - General
Cabinet
Jun 12, 2018 · Apt 3
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jun 12, 2018 · Apt 3
Close - Unsanitary condition
Mold
Jun 12, 2018 · Apt 3
Close - Water leak
Slow leak
Jul 25, 2017 · Apt 3A
Close - Unsanitary condition
Pests
Jul 25, 2017 · Apt 3A
Close - Unsanitary condition
Mold
Jul 25, 2017 · Apt 3A
Close - Unsanitary condition
Mold
Jul 25, 2017 · Apt 3A
Close - Unsanitary condition
Pests
Jun 19, 2014 · Apt 1FL
Close - Unsanitary condition
Pests
Jun 19, 2014 · Apt 1FL
Close - Water leak
Damp spot
Jun 19, 2014 · Apt 1FL
Close - Paint/plaster
Ceiling
Jun 19, 2014 · Apt 1FL
Close - Nonconst
Rubbish
Jul 16, 2010 · Apt 3
Close - Plumbing
Bathtub/shower
Jul 16, 2010 · Apt 3
Close - Electric
Lighting
Jul 16, 2010 · Apt 3
Close - Plumbing
Bathtub/shower
Mar 31, 2010 · Apt 3
Close - Plumbing
Shower-stall
Mar 31, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Mar 31, 2010 · Apt 3
Close - Nonconst
Vermin
Mar 31, 2010 · Apt 3
Close - Nonconst
Vermin
Mar 31, 2010 · Apt 3
Close - General
Mold
Jul 20, 2009 · Apt 3FL
Close - General
Floor
Jul 20, 2009 · Apt 3FL
Close - Paint/plaster
Wall
Jul 20, 2009 · Apt 3FL
Close - Nonconst
Vermin
Jul 20, 2009 · Apt 3FL
Close - Nonconst
Vermin
Jul 20, 2009 · Apt 3FL
Close - General
Cabinet
Dec 2, 2004 · Apt BSMT
Close - General
Locks
Dec 2, 2004 · Apt BSMT
Close - General
Stairs
Dec 2, 2004 · Apt BSMT
Close - Plumbing
Water-leaks
Dec 2, 2004 · Apt BSMT
Close - Plumbing
Basin/sink
Dec 2, 2004 · Apt BSMT
Close - Plumbing
Bathtub/shower
Dec 2, 2004 · Apt BSMT
Close - Paint/plaster
Wall
Dec 2, 2004 · Apt BSMT
Close - Paint/plaster
Ceiling
Dec 2, 2004 · Apt BSMT
Close - General
Mold
Dec 2, 2004 · Apt BSMT
Close - Paint/plaster
Wall
Dec 2, 2004 · Apt BSMT
Close - Nonconst
Vermin
Dec 2, 2004 · Apt BSMT
Close - Nonconst
Vermin
Dec 2, 2004 · Apt BSMT
Close - General
Doors
Nov 11, 2004 · Apt BSMT
Close - Paint/plaster
Wall
Nov 11, 2004 · Apt BSMT
Close - General
Stairs
Nov 11, 2004 · Apt BSMT
Close - General
Stairs
Nov 11, 2004 · Apt BSMT
Close - Plumbing
Water-leaks
Nov 11, 2004 · Apt BSMT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1899
- Floors
- 2
- Residential units
- 3
- Building area
- 3,078 ft²
- Lot area
- 1,958 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3301 / 42
- Assessed value
- $88,500
- Landmark / historic district
- No
HPD registration #359479, last renewed Jul 14, 2026.
Questions about 347 Bleecker Street
Who owns 347 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is Cecil 347, LLC.
Does 347 Bleecker Street have violations?
Yes. NYC HPD has recorded 46 housing violations at this property.
Is 347 Bleecker Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 347 Bleecker Street built?
City records list 1899 as the year it was built.
How many apartments are in 347 Bleecker Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.