289 Himrod Street
Brooklyn, NY 11237BBL 3-03270-0052Map
Owner of record: 289 Himrod, LLC
289 Himrod Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 289 Himrod, LLC. HPD has recorded 147 housing violations here, most recently on May 5, 2026. 23 of the 50 most recent violations are still open.
- HPD violations
- 147
- DOB violations
- 15
- ECB violations
- 2
- HPD complaints
- 344
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 147
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at fresh droppings and borrow at front yard
Sep 19, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 19, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
May 9, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
May 9, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at the ceiling in the 1st room from north located at apt 1l, 1st story, 1st apartment from south at west
May 9, 2025 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation metal door at the west wall in the private hallway located at apt 1l, 1st story, 1st apartment from south at west
May 9, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in the 5th room from north located at apt 1l, 1st story, 1st apartment from south at west
May 9, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Refit door in the 1st room from north located at apt 1l, 1st story, 1st apartment from south at west
May 9, 2025 · Apt 1L
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of exceeding the maximum temperature of a 130 degrees in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
May 9, 2025 · Apt 1L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and walls throughout in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
May 5, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
May 5, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
May 5, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west original violation 17871959 issued 05-may-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 5, 2025 · Apt 1L
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temp of 130 degrees in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
May 5, 2025 · Apt 1L
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
May 5, 2025 · Apt 1L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 29, 2025 · Apt 1L
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west original violation 17860124 issued 29-apr-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 29, 2025 · Apt 1L
Open — Notice of issuance sent to tenant - ANon-hazardous
Cleanse to the satisfaction of this department the building front yard, 1st story
Apr 29, 2025
Open — Not complied with - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at burrows and dropping at building front yard, 1st story
Apr 29, 2025
Open — Not complied with - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Apr 29, 2025 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq ft at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from south at west
Apr 29, 2025 · Apt 1L
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temp of 130 degrees at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Apr 29, 2025 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges door leading to rear yard in the 1st room from north located at apt 1l, 1st story, 1st apartment from south at west
Apr 29, 2025 · Apt 1L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Nov 9, 2024 · Apt 3L
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Nov 9, 2024 · Apt 3L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Oct 5, 2024 · Apt 1L
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1l, 1st story, 1st apartment from east at south
Oct 5, 2024 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 23, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 23, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of rodents rat droppings at cellar
Aug 23, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at south wall at cellar
Aug 23, 2024
Open — Nov sent out - BHazardous
§ 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling at room leading to water tank at cellar
Aug 23, 2024
Open — Nov sent out - BHazardous
Remove the illegal fastening padlock at entrance gate at cellar
Aug 23, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of construction materials and household items at public hall, 3rd story
Aug 23, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Aug 23, 2024 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at north at cellar
Aug 23, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor defective at public hall, 1st story
Jun 24, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 24, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Jun 24, 2022
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at building front yard
Jun 24, 2022
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3l, 3rd story, 1st apartment from south at west
Feb 25, 2022 · Apt 3L
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective in the entrance located at apt 3l, 3rd story, 1st apartment from south at west
Feb 25, 2022 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 1r, 1st story, 1st apartment from west at north
Sep 9, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window lower sash counterbalnce in the 3rd room from east located at apt 1r, 1st story, 1st apartment from west at north
Sep 9, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window lower sash counterbalance in the 1st room from east located at apt 1r, 1st story, 1st apartment from west at north
Sep 9, 2021 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden floor at boiler closet in the private hallway located at apt 1r, 1st story, 1st apartment from west at north
Sep 9, 2021 · Apt 1R
Closed — Violation dismissed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 5 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 2
- Class - 2
As per class 2 (b265) 28-303.7 failure to file a complete boiler inspection report as per dob records submit a current b09 report.
Jun 28, 2017 · Penalty $500
Active - Class - 1
Failure to maintain bldg in code-compliant manner. improper exit/exit access in that washer machine is obstructing hallway on 2nd flr also blocking staircase. remedy: remove obstruction from hallway.
Feb 17, 2010 · Penalty $6,000
Resolve
Complaints
- Water leak
Slow leak
Oct 23, 2026 · Apt 3LAND2
Open - Water leak
Damp spot
Oct 23, 2026 · Apt 3LAND2
Open - Unsanitary condition
Pests
Sep 9, 2026 · Apt FRONTO
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 9, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
May 4, 2025 · Apt 1L
Close - Unsanitary condition
Mold
May 4, 2025 · Apt 1L
Close
Show 40 more ↓
- Door/window
Door
Apr 27, 2025 · Apt 1L
Open - Unsanitary condition
Mold
Apr 27, 2025 · Apt 1L
Open - General
Cabinet
Apr 27, 2025 · Apt 1L
Open - Paint/plaster
Ceiling
Apr 27, 2025 · Apt 1L
Open - Appliance
Refrigerator
Apr 27, 2025 · Apt 1L
Open - Plumbing
Bathtub/shower
Apr 27, 2025 · Apt 1L
Open - Safety
Smoke detector
Apr 27, 2025 · Apt 1L
Open - Heat/hot water
Apartment only
Apr 27, 2025 · Apt 1L
Open - Plumbing
Basin/sink
Apr 27, 2025 · Apt 1L
Open - Heat/hot water
Entire building
Apr 27, 2025 · Apt 1L
Open - Unsanitary condition
Garbage/recycling storage
Jan 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 22, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 28, 2024 · Apt 2L
Close - Water leak
Heavy flow
Mar 8, 2024 · Apt 2LAND3
Close - Water leak
Slow leak
Mar 7, 2024 · Apt 2L
Close - Safety
Carbon monoxide detector
Nov 1, 2022 · Apt 1R
Close - Safety
Smoke detector
Nov 1, 2022 · Apt 1R
Close - Water leak
Damp spot
Jun 23, 2022 · Apt 2R
Close - Unsanitary condition
Mold
Jun 23, 2022 · Apt 2R
Close - Paint/plaster
Ceiling
Jun 23, 2022 · Apt 2R
Close - Paint/plaster
Ceiling
Feb 25, 2022 · Apt 3L
Close - Unsanitary condition
Mold
Sep 5, 2021 · Apt 1R
Close - Water leak
Damp spot
Sep 5, 2021 · Apt 1R
Close - Flooring/stairs
Floor
Sep 5, 2021 · Apt 1R
Close - Safety
Window guard broken/missing
Sep 5, 2021 · Apt 1R
Close - Door/window
Window frame
Sep 5, 2021 · Apt 1R
Close - Plumbing
Bathtub/shower
Sep 5, 2021 · Apt 1R
Close - Plumbing
Basin/sink
Sep 5, 2021 · Apt 1R
Close - Water leak
Slow leak
Sep 5, 2021 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 9, 2019 · Apt 3L
Close - Heat/hot water
Apartment only
Mar 20, 2018 · Apt 1L
Close - Heat/hot water
Apartment only
Mar 20, 2018 · Apt 1L
Close - Paint/plaster
Wall
Sep 8, 2017 · Apt 2R
Close - Plumbing
Basin/sink
Sep 8, 2017 · Apt 2R
Close - Unsanitary condition
Mold
Sep 8, 2017 · Apt 2R
Close - Plumbing
Bathtub/shower
Jun 22, 2016 · Apt 3L
Close - Door/window
Window frame
Jun 22, 2016 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,145 ft²
- Lot area
- 2,450 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3270 / 52
- Assessed value
- $637,200
- Landmark / historic district
- No
HPD registration #366475, last renewed Jul 30, 2025.
Questions about 289 Himrod Street
Who owns 289 Himrod Street?
The owner of record in NYC Department of City Planning PLUTO data is 289 Himrod, LLC.
Does 289 Himrod Street have violations?
Yes. NYC HPD has recorded 147 housing violations at this property.
Is 289 Himrod Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 289 Himrod Street built?
City records list 1931 as the year it was built.
How many apartments are in 289 Himrod Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.