223 Himrod Street
Brooklyn, NY 11237BBL 3-03268-0046Map
Owner of record: Primo Apt LLC
223 Himrod Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is Primo Apt LLC. HPD has recorded 130 housing violations here, most recently on May 4, 2026.
- HPD violations
- 130
- DOB violations
- 8
- ECB violations
- 0
- HPD complaints
- 137
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 130
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Sep 15, 2022 · Apt 1L
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 1l lower level, 1st story, 1st apartment from south at west
Sep 15, 2022 · Apt 1L
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective window counter balance lower sash at south wall in the 5th room from north located at apt 1l, 1st story, 1st apartment from south at west
Sep 15, 2022 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Sep 15, 2022 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 1l, 1st story, 1st apartment from south at west
Sep 15, 2022 · Apt 1L
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 3, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 3, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 30, 2019
Closed — Violation dismissed - IInformation / order
Above premises have been vacant and untenanted except for caretaker for 60 days or more, and cannot be reoccupied until a new certificate of occupancy has been obtained. premises have been vacant since june 14th, 2016
Jun 14, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 9, 2015
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective base cabinet ( water damaged base ) in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic walls at wash tub in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls & ceilings thru-out in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Dec 19, 2013 · Apt 2L
Closed — Violation closed - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 1r, 1st story, apartment at north
Oct 27, 2013 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak ceiling at public hall, 3rd story
Oct 27, 2013
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .... in the entrance located at apt 3r, 3rd story, 1st apartment from north at east
Oct 27, 2013 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Oct 27, 2013 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective ceramic tile floor in the kitchen located at apt 3r, 3rd story, 1st apartment from north at east
Oct 27, 2013 · Apt 3R
Closed — Violation closed - BHazardous
Properly secure the loose hand rail at public hall, 3rd story
Oct 27, 2013
Closed — Violation closed - BHazardous
Provide wire mesh under sky lite at 1st public hall bulkhead from east
Oct 27, 2013
Closed — Violation closed - BHazardous
Replace with new the broken or defective door in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Oct 27, 2013 · Apt 1R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors /... in the bathroom located at apt 1r, 1st story, 1st apartment from west at north
Oct 27, 2013 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire rated ceiling at public hall, 3rd story
Oct 27, 2013
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets sink in the kitchen located at apt 1r, 1st story, apartment at north
Oct 27, 2013 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 1; in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 4th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, east wall, west wall in the 2nd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, north wall, south wall, east wall, west wall in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of double cylinder key operate lock.at gate at front areaway
Oct 18, 2013
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall, 1st radiator from west at north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st wall cabinet from north at east wall, 1st door from west at north wall in the 2nd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, 1st door frame from south at west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Oct 18, 2013 · Apt 2L
Closed — Violation closed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 5, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 16, 2024 · Apt 1R
Close - Door/window
Window frame
Sep 18, 2022 · Apt 1L
Close - Door/window
Window frame
Sep 18, 2022 · Apt 1L
Close - Unsanitary condition
Mold
Sep 18, 2022 · Apt 1L
Close - Safety
Carbon monoxide detector
Sep 13, 2022 · Apt 1L
Close - Plumbing
Basin/sink
Sep 13, 2022 · Apt 1L
Close - Door/window
Window frame
Sep 13, 2022 · Apt 1L
Close - Door/window
Window frame
Sep 13, 2022 · Apt 1L
Close - Unsanitary condition
Pests
Sep 13, 2022 · Apt 1L
Close - Unsanitary condition
Mold
Sep 13, 2022 · Apt 1L
Close
Show 40 more ↓
- Plumbing
Basin/sink
Sep 1, 2022 · Apt 1L
Close - General
Cabinet
Sep 1, 2022 · Apt 1L
Close - Door/window
Window frame
Sep 1, 2022 · Apt 1L
Close - Unsanitary condition
Pests
Sep 1, 2022 · Apt 1L
Close - Safety
Carbon monoxide detector
Sep 1, 2022 · Apt 1L
Close - Unsanitary condition
Mold
Sep 1, 2022 · Apt 1L
Close - Unsanitary condition
Mold
Aug 2, 2022 · Apt 1L
Close - Door/window
Window frame
Aug 2, 2022 · Apt 1L
Close - Door/window
Window frame
Aug 2, 2022 · Apt 1L
Close - Safety
Window guard broken/missing
Aug 2, 2022 · Apt 1L
Close - Unsanitary condition
Pests
Aug 2, 2022 · Apt 1L
Close - Door/window
Door frame
Aug 2, 2022 · Apt 1L
Close - Safety
Carbon monoxide detector
Aug 2, 2022 · Apt 1L
Close - General
Cabinet
Aug 2, 2022 · Apt 1L
Close - Unsanitary condition
Pests
Aug 2, 2022 · Apt 1L
Close - Plumbing
Basin/sink
Aug 2, 2022 · Apt 1L
Close - Unsanitary condition
Mold
Jul 1, 2022 · Apt 1L
Close - Unsanitary condition
Pests
Jul 1, 2022 · Apt 1L
Close - Door/window
Window frame
Jul 1, 2022 · Apt 1L
Close - General
Cabinet
Jul 1, 2022 · Apt 1L
Close - Safety
Carbon monoxide detector
Jul 1, 2022 · Apt 1L
Close - Unsanitary condition
Mold
Nov 1, 2020 · Apt 1L
Close - Heat/hot water
Apartment only
Jul 23, 2019 · Apt 1L
Close - Water leak
Heavy flow
Aug 14, 2018 · Apt LOWER
Close - Water leak
Heavy flow
Aug 14, 2018 · Apt LOWER
Close - Unsanitary condition
Pests
May 27, 2016 · Apt ALL
Close - Safety
Carbon monoxide detector
Jun 2, 2015 · Apt 1R
Close - Unsanitary condition
Pests
Jun 2, 2015 · Apt 1L
Close - Flooring/stairs
Floor
Jan 21, 2015 · Apt 1L
Close - Heat/hot water
Entire building
Nov 18, 2014 · Apt 1L
Close - Heat/hot water
Entire building
Nov 15, 2014 · Apt BLDG
Close - Nonconst
Vermin
Aug 13, 2013 · Apt 3R
Close - Nonconst
Carbon monoxide
Aug 13, 2013 · Apt 3R
Close - Nonconst
Vermin
Aug 13, 2013 · Apt 3R
Close - Nonconst
Vermin
Aug 13, 2013 · Apt 3R
Close - General
Floor
Aug 13, 2013 · Apt 3R
Close - Nonconst
Smoke detector
Aug 13, 2013 · Apt 3R
Close - Nonconst
Vermin
Aug 13, 2013 · Apt 3R
Close - General
Doors
Aug 13, 2013 · Apt 3R
Close - Nonconst
Carbon monoxide
Aug 13, 2013 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,500 ft²
- Lot area
- 2,500 ft²
- Zoning
- C4-3
- Community board
- 304
- Council district
- 37
- Block / lot
- 3268 / 46
- Assessed value
- $573,300
- Landmark / historic district
- No
HPD registration #361418, last renewed Jun 11, 2025.
Questions about 223 Himrod Street
Who owns 223 Himrod Street?
The owner of record in NYC Department of City Planning PLUTO data is Primo Apt LLC.
Does 223 Himrod Street have violations?
Yes. NYC HPD has recorded 130 housing violations at this property.
Is 223 Himrod Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 223 Himrod Street built?
City records list 1931 as the year it was built.
How many apartments are in 223 Himrod Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.