roofy

1416 Dekalb Avenue

Brooklyn, NY 11237BBL 3-03246-0012Map

Owner of record: Siragusa, John

1416 Dekalb Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is Siragusa, John. HPD has recorded 512 housing violations here, most recently on May 4, 2026. 48 of the 50 most recent violations are still open.

HPD violations
512
DOB violations
29
ECB violations
13
HPD complaints
519

What to know

Concern
28 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 512

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 4, 2026

    Open — Nov sent out
  • C

    Provide seal up of all accesible openings at entire building

    Mar 25, 2026

    Open — Nov sent out
  • I

    The premises have been vacated by an order of this department and cannot be reoccupied except for caretaker, until (1) an application and plan for the work required by this article have been filed with and approved by the department of buildings, where required, (2) such work has been completed by the owner and approved by the department or the department of buildings where required, (3) where required by the department of buildings, a new certificate of occupancy has been obtained and (4) the department has inspected and determined that such dwelling is habitable. 1l 1st story (w1), 1r 1st story (e1), 2l 2nd story (w1),2r 2nd story (e1), 3l 3rd story (w1), and 3r 3rd story(e1) vacate order #260524

    Mar 16, 2026

    Open — Info nov sent out
  • C

    Properly repair with similar material the broken or defective sagging and sloping wood flooring at rear section of apartment in the entire apartment located at apt 3l, 3rd story, apartment at west

    Mar 4, 2026 · Apt 3L

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective sagging and sloping wood flooring at rear section of apartment in the entire apartment located at apt 2l, 2nd story, apartment at west

    Mar 4, 2026 · Apt 2L

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective sagging and sloping flooring at rear section of apartment in the entire apartment located at apt 1l, 1st story, apartment at west

    Mar 4, 2026 · Apt 1L

    Open — Nov sent out
  • C

    Make safe by properly repairing the structural defect ..structural girders and beams at rear of building sagging and stressed with potenatial for collapse.

    Mar 4, 2026

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of excessive clutter in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Feb 13, 2026 · Apt 3R

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective slopping wood floor in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Feb 13, 2026 · Apt 3R

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Feb 13, 2026 · Apt 3R

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Feb 13, 2026 · Apt 3R

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Feb 13, 2026 · Apt 3R

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Feb 13, 2026 · Apt 3R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from north at east

    Feb 13, 2026 · Apt 3R

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story

    Dec 24, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the scuttle ladder hatch at public hall, 3rd story

    Dec 24, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective plaster with fire rated material at the scuttle ladder hatch at public hall, 3rd story

    Dec 24, 2025

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at the scuttle ladder hatch at public hall, 3rd story

    Dec 24, 2025

    Open — Nov sent out
  • C

    Provide seal up to all opening through out in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west

    Dec 24, 2025 · Apt 3R

    Open — Nov sent out
  • C

    Properly secure the loose scuttle ladder at public hall, 3rd story

    Dec 24, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective plaster with fire rated material at the ceiling at public hall, 3rd story

    Dec 24, 2025

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak at the ceiling at public hall, 3rd story

    Dec 24, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 20, 2025

    Open — Info nov sent out
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 3rd story

    Nov 12, 2025

    Open — Nov sent out
  • C

    Properly secure the loose handrail at public hall stairs, 1st story

    Nov 12, 2025

    Open — Nov sent out
  • C

    Properly secure the loose handrail at cellar

    Nov 12, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood sub floor at public hall, 1st story

    Nov 12, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door leading to cellar at public hall, 1st story

    Nov 12, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 27, 2025 · Apt 2L

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 27, 2025 · Apt 2L

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 27, 2025 · Apt 2L

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2r, 2nd story, 1st apartment from east at south

    Oct 27, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective slopping wood flooring in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Oct 27, 2025 · Apt 2R

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar

    Oct 27, 2025

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from east at south

    Oct 27, 2025 · Apt 2R

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of house hold items and garbage at public hall, 3rd story

    Oct 27, 2025

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective handrail at all stories at public hall

    Oct 27, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story

    Oct 27, 2025

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rat burrows at cellar

    Oct 27, 2025

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling at cellar

    Oct 27, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood joist at ceiling at cellar

    Oct 27, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective metal window lintel all window 1st story at building front yard

    Oct 27, 2025

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 27, 2025 · Apt 2L

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective sloping wood flooring in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 27, 2025 · Apt 2L

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceilings in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Oct 27, 2025 · Apt 1L

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Oct 27, 2025 · Apt 1L

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Oct 27, 2025 · Apt 1L

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Oct 27, 2025 · Apt 1L

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Oct 27, 2025 · Apt 1L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor in the 2nd room from east located at apt 1l, 1st story, 1st apartment from west at north

    Oct 27, 2025 · Apt 1L

    Open — Nov sent out

DOB building violations · 29

  • Immediate emergency anythingoptional

    Install three lines of temporary shoring at the rear half of the building from the top of cellar slab to the underside of the roof, approx 30 lf each line. install the 1st line approx 4ft from exp 2,2nd line at along the center of the building, & the 3rd line approx 4ft from exp 4. additionally, install temeporary shoring posts at the

    Mar 4, 2026

    Dob violation - dismissed
  • Construction other optional

    Full vacate and failure to maintain bldg in safe condition the bldg was in a state of disrepair w/floors&wood girdrs@rear half of the bldg w/1st to 3rdfl heavily saggng,deterioratd,&strctrlly cmprmsd.ownr to rtain nyspe to eval the ent bldg&perm rpair under permit.strt wrk by 5/4/26&cmpltd/sgnd off by 71/1/2026

    Mar 4, 2026

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant. at time of inspection observed at apartment 2r floor severely slopping at kitchen/bathroom. structural damage to supporting floor joist.

    Feb 13, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. at time of inspection observed in multiple apartments severely uneven/slopped floors along with corresponding ceilings above/below. at cellar main support girder severely sagging shows signs of deterioration with shoring work performed.

    Jan 29, 2026

    Dob violation - active
  • Construction other optional

    I observed at basement level inadequate support of the relieving wall, makeshift columns observed at basement near exp3 supporting the relieving wall above .

    Jan 13, 2026

    Dob violation - active
  • Construction other optional

    At time of inspection i observed at 2nd floor apt 2r ,the kitchen area floor slanted and not level, ceiling dislodged, at bathroom ongoing water leak can cause bathtub to sink and fall at any time to 1st floor due to structural concerns cast iron tub leaning ,ceiling collapse signs of water damage.

    Jan 13, 2026

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner. at time of inspection observed in apt 2r kitchen area floor slanted and not level, also observed at bathroom floor slanted and cast iron tub leaning.

    Jul 29, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
Show 19 more ↓
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed

ECB violations · 13

  • Class - 2

    Failure to file certificate of correction with the dept. of buildings for violation #39175320r, file a certificate of correction

    Jul 14, 2026 · Penalty $1,280

    Active
  • Class - 2

    Failure to file certificate of correction with the dept of buildings for vio#39173669k, file a certificate of correction

    Jul 14, 2026 · Penalty $1,280

    Active
  • Class - 1

    Unlawful acts. failure to comply with the commissioner's order to obtain an engineering report for violation#39173789p as stated in dob vio25-01849 issued 7/9/25. as of 7/14/2026, no engineering report has been

    Jul 14, 2026 · Penalty $6,280

    Active
  • Class - 2

    Failure to obtain a temporary construction permit prior to installation/use of temporary construction equipment. observed at exposure 1, green panel fence is installed on property prior to obtaining permit for

    Jul 14, 2026 · Penalty $1,280

    Active
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings for summons # 39155334j issued 7/29/25., file a certificate of correction

    Apr 27, 2026 · Penalty $6,250

    Active
  • Class - 1

    At time of insp. observed in multiple apt where fl. in kitchen, bathrooms severely uneven/slopping along w/bulging ceilings in corresponding apt's above & below defective fl's. main support girders at cellar ha

    Jan 29, 2026 · Penalty $25,000

    Active
  • Class - 1

    In reference to complaint 3a23585,inspector #2387 issued ecb 39155334j,also dobvio25-01849 for apt 2r,with remedy provide pe report within 72 hours to [email protected] to which building owner fa

    Jan 14, 2026 · Penalty $12,500

    Active
  • Class - 1

    Failure to comply with commissioner's order. ecb viol#39155334j issued 7/29/25.violating conditions still exist , the kitchen area floor slanted and not level and ceiling dislodged, in bathroom cast iron tub le

    Jan 13, 2026 · Penalty $12,500

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. observed apt 1r,3r in state of disrepair, wood lath exposed, deteriorated sheet rock, water damaged that is affecting apt2r,note owner failed resolve compl

    Jan 13, 2026 · Penalty $12,500

    Active
  • Class - 1

    In apt 2r, in bedroom, section of finished ceiling approximately 3' x 3' has dislodged and fallen into room., repair and/replace

    Jul 29, 2025 · Penalty $25,000

    Active
Show 3 more ↓
  • Class - 2

    As per class 2 (b265) 28.303.7 failure to file a complete boiler inspection report as per dob records. submit a current b09 report.

    Mar 16, 2018 · Penalty $3,125

    Active
  • Class - 1

    Failure to maintain building in code compliant manner.on 2/23/18 @ approx 5:30pm i observed in the cellar a gas future i connection a gas flared union fitting a black gas bushing fitting and a flood in the cell

    Feb 23, 2018 · Penalty $5,000

    Active
  • Class - 1

    Work without a permit.on 2/23/18 @ approx 5:30pm i observed in the cellar a newly installed sanitary pvc,piping installed and the removal ofa sanitary trap without any permits on file.rem:obtain all required pe

    Feb 23, 2018 · Penalty $8,000

    Active

Complaints

  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Dec 19, 2025 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Dec 19, 2025 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Oct 23, 2025 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Oct 23, 2025 · Apt 2R

    Close
  • Plumbing

    Toilet

    Oct 23, 2025 · Apt 2R

    Close
  • Plumbing

    Basin/sink

    Oct 23, 2025 · Apt 2R

    Close
  • Door/window

    Door frame

    Oct 23, 2025 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Oct 23, 2025 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Oct 23, 2025 · Apt 2R

    Close
Show 40 more ↓
  • Plumbing

    Bathtub/shower

    Oct 17, 2025 · Apt 2R

    Close
  • Water leak

    Slow leak

    Oct 17, 2025 · Apt 2R

    Close
  • Plumbing

    Toilet

    Oct 17, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Oct 5, 2025 · Apt 2L

    Close
  • Appliance

    Electric/gas range

    Oct 5, 2025 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Oct 1, 2025 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Oct 1, 2025 · Apt 2R

    Close
  • Paint/plaster

    Ceiling

    Jul 9, 2025 · Apt 1L

    Close
  • Water leak

    Heavy flow

    Jul 9, 2025 · Apt 1L

    Close
  • Plumbing

    Bathtub/shower

    Jan 23, 2025 · Apt 2R

    Close
  • Flooring/stairs

    Floor

    Jan 23, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jan 12, 2025 · Apt 2R

    Close
  • Door/window

    Window frame

    Nov 29, 2023 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Nov 29, 2023 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2023 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Nov 16, 2022 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2022 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Aug 8, 2018 · Apt 1L

    Close
  • Water leak

    Heavy flow

    Aug 8, 2018 · Apt 1L

    Close
  • Plumbing

    Toilet

    Jun 4, 2018 · Apt 1L

    Close
  • Electric

    Outlet/switch

    Apr 9, 2018 · Apt 1L

    Close
  • Water leak

    Heavy flow

    Apr 9, 2018 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Mar 1, 2018 · Apt 2R

    Close
  • Water leak

    Heavy flow

    Mar 1, 2018 · Apt 2R

    Close
  • General

    Cooking gas

    Feb 9, 2018 · Apt 1L

    Close
  • General

    Cooking gas

    Feb 5, 2018 · Apt 1L

    Close
  • Appliance

    Electric/gas range

    Feb 1, 2018 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2018 · Apt 2L1L

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2017 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Aug 16, 2017 · Apt 2R

    Close
  • Plumbing

    Toilet

    Aug 16, 2017 · Apt 2R

    Close
  • Plumbing

    Bathtub/shower

    Jul 20, 2017 · Apt 2R

    Close
  • Plumbing

    Toilet

    Jul 20, 2017 · Apt 2R

    Close
  • Heat/hot water

    Apartment only

    Jun 26, 2017 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Jun 26, 2017 · Apt 2R

    Close
  • Electric

    Lighting

    Jun 8, 2017 · Apt 1L

    Close
  • Electric

    Lighting

    Jun 8, 2017 · Apt 1L

    Close
  • Plumbing

    Water supply

    Jun 8, 2017 · Apt 1L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
4,350 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3246 / 12
Assessed value
$538,650
Landmark / historic district
No

HPD registration #363613, last renewed Aug 24, 2016.

Questions about 1416 Dekalb Avenue

Who owns 1416 Dekalb Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Siragusa, John.

Does 1416 Dekalb Avenue have violations?

Yes. NYC HPD has recorded 512 housing violations at this property.

Is 1416 Dekalb Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1416 Dekalb Avenue built?

City records list 1931 as the year it was built.

How many apartments are in 1416 Dekalb Avenue?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.