roofy

761 Hart Street

Brooklyn, NY 11237BBL 3-03219-0048Map

Owner of record: Hart Living LLC

761 Hart Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is Hart Living LLC. HPD has recorded 132 housing violations here, most recently on December 1, 2025. 14 of the 50 most recent violations are still open.

HPD violations
132
DOB violations
18
ECB violations
2
HPD complaints
453

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 1, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 132

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 3R

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system lock door at 1st story at boiler room, 1st story

    Dec 1, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 3R

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south

    Dec 1, 2025 · Apt 3R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floors in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Nov 12, 2025

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 12, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Nov 12, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 12, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly secure the loose riser pipe in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Open — Invalid certification
  • B

    Remove all encumbrances consisting of household items at public hall, 1st story

    Nov 12, 2025

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items and strollers at public hall, 2nd story

    Nov 12, 2025

    Closed — Violation dismissed
  • A

    Provide a stationary iron ladder or fireproof stair for the outside cellar entrance scuttle ladder at public hall, 3rd story

    Nov 12, 2025

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective leaky air valve at riser in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective cracked porcelain enamel at washbasin in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the grout and mortar joints around bathtub perimeter in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of scalding hot water exceeding the maximunm temperature of 130 degrees in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Open — Invalid certification
  • C

    Properly repair or replace the broken or defective leaky valve at riser pipe in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from south at west

    Nov 12, 2025 · Apt 3L

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1r, 1st story, 1st apartment from north at east

    Oct 14, 2025 · Apt 1R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east located at apt 1r, 1st story, 1st apartment from west at north

    Jul 3, 2025 · Apt 1R

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective wall cabinet at south wall in the kitchen located at apt 1r, 1st story, 1st apartment from west at north

    Jul 3, 2025 · Apt 1R

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east located at apt 1r, 1st story, 1st apartment from west at north

    Jul 3, 2025 · Apt 1R

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1r, 1st story, 1st apartment from west at north

    Jul 3, 2025 · Apt 1R

    Open — Nov sent out
  • B

    Properly secure the loose wall hung cabinet at south wall in the kitchen located at apt 1r, 1st story

    Jun 26, 2025 · Apt 1R

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from west at north

    Sep 18, 2024 · Apt 1R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Sep 18, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Sep 18, 2024 · Apt 1R

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective lock at building entrance door

    Aug 21, 2024

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective locking device at building entrance door , 1st story

    Aug 21, 2024

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at the south wall in the bathroom located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Replace or repair the self-closing the doors that is missing or defective hinges at door in the entrance located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Open — Not complied with
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at the west wall in the kitchen located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the 3rd room from east, the 1st room from east located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at the west wall in the kitchen located at apt 1r, 1st story, 1st apartment from west at north original violation 17185665 issued 12-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 12, 2024 · Apt 1R

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... less than 30 sq ft at the walls and ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from west at north

    Aug 12, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... less than 30 sq ft at the walls and ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from west at north original violation 17185657 issued 12-aug-24 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).

    Aug 12, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    May 29, 2024 · Apt 2L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south

    May 29, 2024 · Apt 2L

    Closed — Violation dismissed

DOB building violations · 18

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
Show 8 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 2

  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 30000059391y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo

    Jul 1, 2025 · Penalty $3,125

    Active
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments.an applicaiton filed under job#320861037 for interior renovation however, built condition consist of full height partition ere

    May 20, 2015 · Penalty $2,500

    Active

Complaints

  • Heat/hot water

    Apartment only

    Jul 19, 2026 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Jul 19, 2026 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Jul 19, 2026 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 5, 2025 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2025 · Apt 2L

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Oct 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2025 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Oct 17, 2025 · Apt 1I

    Close
  • Heat/hot water

    Apartment only

    Oct 13, 2025 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Sep 5, 2025 · Apt 1L

    Close
  • Door/window

    Door

    Aug 20, 2024 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 20, 2024 · Apt BLDG

    Close
  • Door/window

    Door

    Aug 20, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Aug 9, 2024 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Aug 9, 2024 · Apt 1R

    Close
  • Door/window

    Window frame

    Aug 9, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Aug 9, 2024 · Apt 1R

    Close
  • Plumbing

    Bathtub/shower

    Aug 9, 2024 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Aug 9, 2024 · Apt 1R

    Close
  • Door/window

    Window frame

    Jul 31, 2024 · Apt 3L

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2024 · Apt 3L

    Close
  • Flooring/stairs

    Floor

    Jul 31, 2024 · Apt 3L

    Close
  • Water leak

    Slow leak

    Jul 31, 2024 · Apt 3L

    Close
  • Door/window

    Door

    Jul 31, 2024 · Apt 3L

    Close
  • Water leak

    Heavy flow

    Jul 31, 2024 · Apt 3L

    Close
  • Safety

    Smoke detector

    Jul 31, 2024 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Jul 31, 2024 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Jul 31, 2024 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    May 28, 2024 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    May 28, 2024 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    May 28, 2024 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Jan 30, 2022 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2022 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Jan 30, 2022 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Jan 30, 2022 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Jan 21, 2022 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Jan 21, 2022 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Jan 21, 2022 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2022 · Apt 2L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 12, 2018 · Apt 3L

    Close
  • Door/window

    Door

    Apr 12, 2018 · Apt 3L

    Close
  • Door/window

    Door

    Apr 12, 2018 · Apt 3L

    Close
  • Water leak

    Slow leak

    Jan 3, 2018 · Apt 2L

    Close
  • Heating

    Heat related

    Apr 4, 2011 · Apt 1R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
4,125 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3219 / 48
Assessed value
$396,900
Landmark / historic district
No

HPD registration #362712, last renewed Sep 24, 2025.

Questions about 761 Hart Street

Who owns 761 Hart Street?

The owner of record in NYC Department of City Planning PLUTO data is Hart Living LLC.

Does 761 Hart Street have violations?

Yes. NYC HPD has recorded 132 housing violations at this property.

Is 761 Hart Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 761 Hart Street built?

City records list 1931 as the year it was built.

How many apartments are in 761 Hart Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.