roofy

401 Suydam Street

Brooklyn, NY 11237BBL 3-03211-0041Map

Owner of record: 401 Suydam St LLC

401 Suydam Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 401 Suydam St LLC. HPD has recorded 46 housing violations here, most recently on August 16, 2017.

HPD violations
46
DOB violations
4
ECB violations
2
HPD complaints
129

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Aug 16, 2017

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 46

  • B

    Repair the roof so that it will not leak over ceiling at public hall, 3rd story

    Aug 16, 2017

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective plaster all walls and ceiling at public hall, 3rd story

    Aug 16, 2017

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 16, 2017

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 16, 2017

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 16, 2017

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story

    Aug 16, 2017

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present

    Nov 15, 2015

    Closed — Violation dismissed
  • B

    Replace or repair the self-closing doors that is missing or defective ............... in the entrance located at apt 3l, 3rd story, 1st apartment from south at west

    Sep 9, 2015 · Apt 3L

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required , light fixtures present

    Sep 2, 2015

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present

    Aug 23, 2015

    Closed — Violation closed
Show 36 more ↓
  • C

    M/d law abate the nuisance consisting of 3 free standing radiators at public hall at north , 1st story

    Sep 16, 2014

    Closed — Violation dismissed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts incandscent light required, light fixture present. at front areaway

    Jun 17, 2014

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north

    Sep 13, 2013 · Apt 2L

    Closed — Violation closed
  • C

    Replace with new the broken or defective interior glass at lower sash at window in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Sep 13, 2013 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair the broken or defective locking device,entrance door to building at public hall, 1st story

    Sep 10, 2012

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 10, 2012 · Apt 3L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective plaster ceiling and walls with fire retarding materials at public hall, 2nd story

    Sep 7, 2012

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3l, 3rd story

    Sep 7, 2012 · Apt 3L

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the entire apartment located at apt 3l, 3rd story

    Sep 7, 2012 · Apt 3L

    Closed — Violation closed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ...... in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 6, 2012 · Apt 3L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor, in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east

    Aug 21, 2012 · Apt 3L

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required

    May 1, 2012

    Closed — Violation closed
  • C

    Remove the illegal fastening -- double cylinder key operated lock installed on door street entrance to building

    Oct 31, 2011

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor and vinyl tile in the kitchen located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • B

    Replace with new the missing base board at west wall in the bathroom located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • B

    Replace the broken or defective vanity sink top in the bathroom located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroom located at apt 1r, 1st story, apartment at east

    Oct 7, 2010 · Apt 1R

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Oct 7, 2010

    Closed — Violation closed
  • B

    Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations ... at public hall, 1st story

    Oct 7, 2010

    Closed — Violation closed
  • B

    Repair the broken or defective connection at sink waste line in the kitchen located at apt 2r, 2nd story, apartment at east

    Oct 7, 2010 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from north located at apt 2r, 2nd story, apartment at east

    Oct 7, 2010 · Apt 2R

    Closed — Violation closed
  • B

    Properly repair the broken or defective upper and lower window sash in the entire apartment located at apt 2r, 2nd story, apartment at east

    Oct 7, 2010 · Apt 2R

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of corroded bathtub in the bathroom located at apt 2r, 2nd story, apartment at east

    Oct 7, 2010 · Apt 2R

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, south wall in the 6th room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 6, 2010 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 6, 2010 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 6, 2010 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall, 1st door frame from east at south wall, north wall, west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 6, 2010 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, east wall in the 4th room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 6, 2010 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st door frame from north at east wall in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north

    Oct 6, 2010 · Apt 2L

    Closed — Violation closed
  • B

    D26-13.03 adm code abate the nuisance consisting of vermin mice & roaches 3 sty apt 3l. located at apt 3l

    May 8, 1987 · Apt 3L

    Closed — Violation closed
  • B

    D26-10.01 adm code properly repair with similar material the broken or defective wood floor 1 sty north apt 1r east room. located at apt 1r

    Apr 23, 1987 · Apt 1R

    Closed — Violation closed
  • B

    D26-10.01 adm code & 309 m/d law abate the nuisance consisting of concealed leak ceiling 1 sty north apt 1r bathroom & kitchen. located at apt 1r

    Apr 23, 1987 · Apt 1R

    Closed — Violation closed

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 13, 2014

    Dob violation - dismissed
  • Construction other optional

    Work without a permitr; remedy; stop all work, make site safe, contact this office @ 718 802-3685 prior to return to work

    Dec 7, 2009

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    Work without a permit; remedy: stop all work except to make safe

    Jul 2, 2009

    Vw*-violation - work w/o permit dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed

ECB violations · 2

  • Class - 1

    Work w/o a permit observed active constr work @ 2nd flr(right) apt.1) found men working installing new plumbing water,waste & gas lines.2) found apt to be completly gutted w/new framing in process of being inst

    May 12, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain bldg noted at rear of the cellar part of wooden fl joists rotten demiched from driping water creating unsafe condition remedy: obtain all necessary permits to replace demiched fl joists make

    Sep 15, 2009

    Resolve

Complaints

  • Water leak

    Slow leak

    Oct 23, 2025 · Apt LOBBY

    Close
  • Paint/plaster

    Ceiling

    Oct 23, 2025 · Apt LOBBY

    Close
  • Door/window

    Door

    Oct 23, 2025 · Apt LOBBY

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 9, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 9, 2025 · Apt 3O

    Close
  • Unsanitary condition

    Pests

    Jul 9, 2025 · Apt 3O

    Close
  • Unsanitary condition

    Pests

    Jul 9, 2025 · Apt 30

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 9, 2025 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Jul 9, 2025 · Apt 30

    Close
  • Unsanitary condition

    Pests

    Jul 9, 2025 · Apt 30

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Dec 12, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Dec 12, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Dec 12, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Dec 3, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Dec 3, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Aug 6, 2024 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Jan 16, 2024 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Jan 16, 2024 · Apt 3L

    Close
  • Flooring/stairs

    Floor

    Jan 16, 2024 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2024 · Apt 3L

    Close
  • Plumbing

    Water supply

    Jan 16, 2024 · Apt 3L

    Close
  • Door/window

    Door

    Jan 16, 2024 · Apt 3L

    Close
  • Door/window

    Door

    Jan 16, 2024 · Apt 3L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 16, 2024 · Apt 3L

    Close
  • General

    Janitor/super

    Jan 16, 2024 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Nov 30, 2023 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Aug 7, 2017 · Apt BLDG

    Close
  • Flooring/stairs

    Stairs

    Jun 27, 2016 · Apt 2

    Close
  • Plumbing

    Water supply

    Feb 15, 2016 · Apt 1L

    Close
  • Plumbing

    Water supply

    Feb 14, 2016 · Apt IR

    Close
  • Electric

    Lighting

    Sep 2, 2015 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 19, 2015 · Apt 3L

    Close
  • General

    Bell/buzzer/intercom

    Apr 23, 2015 · Apt 1R

    Close
  • Plumbing

    Water supply

    Feb 25, 2015 · Apt 3R

    Close
  • Plumbing

    Water supply

    Feb 25, 2015 · Apt 1L

    Close
  • Plumbing

    Water supply

    Feb 24, 2015 · Apt 1L

    Close
  • Plumbing

    Water supply

    Feb 24, 2015 · Apt 1R

    Close
  • General

    Windows

    Sep 5, 2013 · Apt 2L

    Close
  • General

    Windows

    Sep 5, 2013 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Aug 17, 2012 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Aug 17, 2012 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Aug 17, 2012 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Aug 17, 2012 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Aug 17, 2012 · Apt 3L

    Close
  • Plumbing

    Water-leaks

    Aug 17, 2012 · Apt 3L

    Close
  • Plumbing

    Water-leaks

    Aug 17, 2012 · Apt 3L

    Close
  • Plumbing

    Water-leaks

    Aug 17, 2012 · Apt 3L

    Close
  • Plumbing

    Water-leaks

    Aug 17, 2012 · Apt 3L

    Close
  • General

    Floor

    Aug 17, 2012 · Apt 3L

    Close
  • General

    Doors

    Aug 5, 2011 · Apt B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
4,875 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3211 / 41
Assessed value
$494,550
Landmark / historic district
No

HPD registration #350151, last renewed Aug 20, 2025.

Questions about 401 Suydam Street

Who owns 401 Suydam Street?

The owner of record in NYC Department of City Planning PLUTO data is 401 Suydam St LLC.

Does 401 Suydam Street have violations?

Yes. NYC HPD has recorded 46 housing violations at this property.

Is 401 Suydam Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 401 Suydam Street built?

City records list 1931 as the year it was built.

How many apartments are in 401 Suydam Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.