roofy

167 Starr Street

Brooklyn, NY 11237BBL 3-03187-0041Map

Owner of record: Irving Starr LLC

167 Starr Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 8 residential units across 4 floors. The owner of record is Irving Starr LLC. HPD has recorded 86 housing violations here, most recently on July 23, 2026. 22 of the 50 most recent violations are still open.

HPD violations
86
DOB violations
2
ECB violations
1
HPD complaints
198

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 86

  • B

    Remove all encumbrances consisting of consisting of air conditioner at public hall, 3rd story

    Jul 23, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 6, 2026

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Mar 23, 2026

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout yard

    Mar 23, 2026

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Dec 9, 2025 · Apt 2L

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from south at west

    Dec 9, 2025 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west

    Dec 9, 2025 · Apt 2L

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north original violation 17924922 issued 29-may-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    May 29, 2025 · Apt 4R

    Open — Nov certified late
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the bathroom located at apt 4r, 4th story, 2nd apartment from west at north

    May 29, 2025 · Apt 4R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4r, 4th story, 2nd apartment from west at north

    May 29, 2025 · Apt 4R

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 4r, 4th story, 2nd apartment from west at north

    May 29, 2025 · Apt 4R

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 27, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 14, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 2, 2022

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Sep 25, 2021 · Apt 3L

    Open — Notice of issuance sent to tenant
  • C

    Code: arrange and make self-closing the doors in the entrance located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 22, 2021 · Apt 3L

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 22, 2021 · Apt 3L

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 22, 2021 · Apt 3L

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 22, 2021 · Apt 3L

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 22, 2021 · Apt 3L

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall and east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 22, 2021 · Apt 3L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3l, 3rd story, 1st apartment from south at west

    Aug 30, 2021 · Apt 3L

    Open — Invalid certification
  • B

    Properly repair the broken or defective mechanical vent system at ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west

    Aug 30, 2021 · Apt 3L

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 3l, 3rd story, 1st apartment from south at west

    Aug 30, 2021 · Apt 3L

    Open — Invalid certification
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west

    Aug 30, 2021 · Apt 3L

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west

    Aug 30, 2021 · Apt 3L

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west

    Aug 30, 2021 · Apt 3L

    Open — Invalid certification
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    May 10, 2021

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors in the entrance located at apt 2r, 2nd story, 2nd apartment from south at west

    May 10, 2021 · Apt 2R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx, 2 sq. ft. at ceiling in the bathroom located at apt 2r, 2nd story, 2nd apartment from south at west

    May 10, 2021 · Apt 2R

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front

    May 10, 2021

    Closed — Violation dismissed
  • B

    Provide a safe and adequate supply of electric service to the fixtures outlet east wall in the 2nd room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood cabinet base in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Open — Nov sent out
  • B

    Repair the broken or defective connection waste pipe at sink in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Provide a safe and adequate supply of electric service to the fixtures outlet north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the private hallway located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective cover east wall on/off electrical switch for ceiling light fixture in the private hallway located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Provide a safe and adequate supply of electric service to the fixtures north and south outlets east wall in the private hallway located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). replace located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • A

    Refit upper and lower sash window north wall in the 1st room from north located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors at front entrance located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • C

    Properly repair the broken or defective locking mechanism at front door entrance to building

    Mar 29, 2021

    Open — Nov certified late
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 29, 2021

    Closed — Violation closed
  • B

    Repair or replace the smoke detector replace located at apt 2l, 2nd story, 1st apartment from west at north

    Mar 29, 2021 · Apt 2L

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at public hall, 1st story

    Feb 24, 2021

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east located at apt 2r, 2nd story, 1st apartment from west at north

    Feb 24, 2021 · Apt 2R

    Open — Not complied with
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from east located at apt 2r, 2nd story, 1st apartment from west at north

    Feb 24, 2021 · Apt 2R

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 1st apartment from west at north

    Feb 24, 2021 · Apt 2R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door to cellar at public hall, 1st story

    Jan 31, 2017

    Closed — Violation closed
  • A

    M/d law abate the nuisance consisting of wooden base board at the east wall in the bathroom located at apt 1l, 1st story, 1st apartment from east at south

    Jan 31, 2017 · Apt 1L

    Closed — Violation closed

DOB building violations · 2

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed

ECB violations · 1

  • Class - 2

    Unsafe unapproved unsuitable electrical equipment devices apparatus appliances materials or wiring in use. expose wiring in basement in service area also defective switch & outlets in apt 1l. remedy: obtain per

    Mar 2, 2017 · Penalty $400

    Resolve

Complaints

  • Water leak

    Slow leak

    Aug 27, 2026 · Apt 2L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 2, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 2, 2026 · Apt LOBBY

    Close
  • Unsanitary condition

    Pests

    Mar 20, 2026 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2026 · Apt 1R

    Close
  • General

    Cabinet

    Mar 2, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Mar 2, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Mar 2, 2026 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 3L

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Jan 26, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2025 · Apt 2L

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 10, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 2, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 1, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    May 22, 2025 · Apt 4R

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2025 · Apt 4L

    Close
  • Appliance

    Electric/gas range

    Apr 2, 2024 · Apt 1R

    Close
  • Water leak

    Slow leak

    Apr 2, 2024 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Apr 2, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Apr 2, 2024 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Dec 24, 2022 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2022 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Sep 20, 2021 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Sep 20, 2021 · Apt 3L

    Close
  • Unsanitary condition

    Mold

    Sep 20, 2021 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Sep 20, 2021 · Apt 3L

    Close
  • Water leak

    Slow leak

    Sep 7, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Sep 7, 2021 · Apt BLDG

    Close
  • Door/window

    Window frame

    Sep 7, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 7, 2021 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2021 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Aug 12, 2021 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Aug 12, 2021 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Mar 16, 2021 · Apt 3R

    Close
  • Heat/hot water

    Apartment only

    Mar 9, 2021 · Apt 3R

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2021 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2020 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jul 23, 2018 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Jul 23, 2018 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Jul 23, 2018 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Jul 23, 2018 · Apt 3L

    Close
  • General

    Cabinet

    Jul 23, 2018 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2017 · Apt 1L

    Close
  • Water leak

    Slow leak

    Jan 26, 2017 · Apt 1L

    Close
  • Unsanitary condition

    Mold

    Jan 26, 2017 · Apt 1L

    Close
  • Plumbing

    Radiator

    Jan 26, 2017 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2017 · Apt 1L

    Close
  • Plumbing

    Boiler

    Jan 23, 2017 · Apt 1L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1931
Floors
4
Residential units
8
Building area
7,800 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
304
Council district
34
Block / lot
3187 / 41
Assessed value
$585,900
Landmark / historic district
No

HPD registration #339781, last renewed Jul 24, 2025.

Questions about 167 Starr Street

Who owns 167 Starr Street?

The owner of record in NYC Department of City Planning PLUTO data is Irving Starr LLC.

Does 167 Starr Street have violations?

Yes. NYC HPD has recorded 86 housing violations at this property.

Is 167 Starr Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 167 Starr Street built?

City records list 1931 as the year it was built.

How many apartments are in 167 Starr Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.