163 Troutman Street
Brooklyn, NY 11206BBL 3-03173-0055Map
Owner of record: 163 Troutman Realty LLC
163 Troutman Street is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 6 residential units across 3 floors. The owner of record is 163 Troutman Realty LLC. HPD has recorded 39 housing violations here, most recently on October 16, 2024.
- HPD violations
- 39
- DOB violations
- 5
- ECB violations
- 8
- HPD complaints
- 325
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 39
- CImmediately hazardous
Abate the infestation consisting of rodents rats excrement in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Oct 16, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective hinges in the entrance located at apt 1r, 1st story, 1st apartment from north at east
Oct 16, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand doorstop at vestibule door , 1st story
Oct 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Oct 16, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective hinges at door to rear yard in the 1st room from north located at apt 1r, 1st story, 1st apartment from north at east
Oct 16, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 1st apartment from east at south
Feb 10, 2024 · Apt 1L
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Feb 1, 2016
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening slide bolt with hasp capable receiving padlock at window gate to fire escape window in the 4th room from east located at apt 2r, 2nd story, 1st apartment from west at north
Feb 1, 2016 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening slide bolt with hasp capable receiving padlock at window gate to fire escape window in the 4th room from east located at apt 2l, 2nd story, apartment at south
Feb 1, 2016 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening slide bolt with hasp capable receiving padlock at window gate to rear yard in the 4th room from east located at apt 1l, 1st story, apartment at south
Feb 1, 2016 · Apt 1L
Closed — Violation closed
Show 29 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall, 1st window frame from east at south wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east
Jul 30, 2009 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Jul 30, 2009 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from north at east
Jul 30, 2009 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, west wall, 2nd window frame from east at south wall in the 4th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Jul 30, 2009 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective locking device on building entrance door at public hall, 1st story
Feb 2, 2009
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective cement mortar where chimney and flue pipe connect at cellar
Jan 24, 2009
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of rooms created at cellar
Jan 24, 2009
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 2nd closet from north at east wall door, 1st door frame from west at north wall, east wall in the 2nd room from north located at apt 1l, 1st story, 1st apartment from south at west
Aug 20, 2008 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 1l, 1st story, 1st apartment from south at west
Aug 20, 2008 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, west wall, 1st wall cabinet from south at west wall, 2nd wall cabinet from south at west wall in the 4th room from north located at apt 1l, 1st story, 1st apartment from south at west
Aug 20, 2008 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north located at apt 1l, 1st story, 1st apartment from south at west
Aug 20, 2008 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from north at east
Aug 6, 2008 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, ceiling, 1st door frame from east at south wall, north wall, west wall, 1st window frame from west at north wall in the 3rd room from north located at apt 2r, 2nd story, 1st apartment from north at east
Aug 6, 2008 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 2nd door frame from west at north wall, north wall, south wall, west wall, 1st window frame from east at south wall in the 4th room from north located at apt 2r, 2nd story, 1st apartment from north at east
Aug 6, 2008 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 2r, 2nd story, 1st apartment from north at east
Aug 6, 2008 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Aug 22, 2006 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 2l, 2nd story, 1st apartment from east at south
Aug 22, 2006 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st window frame from south at west wall in the 2nd room from east located at apt 1l, 1st story, 1st apartment from east at south
May 19, 2006 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 2nd closet from east at south wall door, 1st door frame from west at north wall, 1st door frame from south at west wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 1l, 1st story, 1st apartment from east at south
May 19, 2006 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from north at east wall, north wall in the 3rd room from east located at apt 1l, 1st story, 1st apartment from east at south
May 19, 2006 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from north at east wall in the kitchen located at apt 1l, 1st story, 1st apartment from east at south
May 19, 2006 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of rodents rats in the entire apartment located at apt 1r, 1st story
Jun 6, 2005 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, ceiling, 1st door frame from west at north wall, 1st door frame from east at south wall, 1st door frame from south at west wall, north wall, west wall, 1st window frame from south at west wall in the 3rd room from east located at apt 1l, 1st story, 1st apartment from east at south
Dec 16, 2004 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from east located at apt 1l, 1st story, 1st apartment from east at south
Dec 16, 2004 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, 1st door from west at north wall, 1st door frame from west at north wall, 1st door frame from south at west wall, 1st wall cabinet from east at south wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east located at apt 1l, 1st story, 1st apartment from east at south
Dec 16, 2004 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of rodents rats at open space, cellar
Jul 16, 2004
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of rodents escreta present in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
Mar 25, 2002 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of rodents rats at cellar
Jan 30, 2002
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of rodents rats in the entire apartment located at apt 3r, 3rd story
Apr 14, 2001 · Apt 3R
Closed — Violation closed
DOB building violations · 5
- Construction other optional
Stop all work,provide plans,call for re-inspection
Sep 14, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
Stop all work,secure site,safeguard,provide tenant protection plans,ca ll the dob at 718-802-3684 for full rescind
Sep 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
ECB violations · 8
- Class - 1
B1545,3a,5b,15,16,19b,21b,32a,38,50a,50b,50c,50d. 50a check valve required to be b/w back flow preventor and pressure reducing valve 50b drip log on relief valve reduced 50c d.a.r kit missing on oil pump 50d
May 11, 2009 · Penalty $5,000
Resolve - Class - 1
Failure to maintain building in code-compliant manner-noted 3rd flr left and right apt fire protection has been removed thoughout creating ahazardous condition for occupant(ex ceiling wood/lath/and sheetrock ar
Sep 3, 2008 · Penalty $5,000
Resolve - Hazardous
Work w/o a permit. work noted:partitions erected at cellar creating 5 rooms. plumbing lines run for 3 pc bathroom(shower stall,sink, toilet)remedy:obtain permit or restore premises to prior legal condition.
Sep 28, 2006 · Penalty $800
Resolve - Hazardous
Occupancy contrary to c of o noted:c of o #89448 indicates cellar to be unoccupied cellar has been altered into 4 sro rooms w/ 3 pc bathroomremedy:discontinue illegal use or amend c of o.
Sep 28, 2006 · Penalty $800
Resolve - Hazardous
Residence altered as a dwelling for more than the legally approved # of families, note c of o # 89448 of 10/11/1938 indicate a total of 6 fam, w/2 dwelling units per 1st thru 3rd fk, & use at cellar level as or
Feb 3, 2006 · Penalty $9,800
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved number of families. noted: from legal storage/boiler room occupancy to: illegal 4 single rooms occupancy at cellar level, with lo
Jan 31, 2006 · Penalty $1,000
Resolve - Hazardous
Work w/o a permit-hazardous. work noted: erected sheetrock partitions at cellar level of bldg, creating 4 single occupancy rooms, with doorsin each of the rooms; 3 pc. bathroom (shower stall, water closet,vanit
Jan 31, 2006 · Penalty $800
Resolve - Hazardous
Failure to provide at least two means of egress from room or space where required noted: at cellar level of bldg, created 4 single rooms occupancy, 3 pic bathroom (at rear of cellar) with only one mean of egres
Jan 31, 2006 · Penalty $480
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 15, 2024 · Apt 1R
Close - General
Ventilation system
Oct 8, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Oct 8, 2024 · Apt 1R
Close - Plumbing
Toilet
Sep 20, 2024 · Apt 3L
Close - Unsanitary condition
Pests
Sep 15, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Aug 10, 2024 · Apt 1R
Close - Unsanitary condition
Mold
Nov 17, 2023 · Apt 1L
Close - Unsanitary condition
Sewage
Nov 17, 2023 · Apt 1L
Close - Water leak
Heavy flow
Nov 17, 2023 · Apt 1L
Close - Plumbing
Basin/sink
Nov 17, 2023 · Apt 1L
Close
Show 40 more ↓
- Unsanitary condition
Pests
Oct 11, 2023 · Apt 1R
Close - Unsanitary condition
Pests
Jun 3, 2023 · Apt 1L
Close - Nonconst
Smoke detector
Jul 27, 2009 · Apt 2R
Close - Paint/plaster
Wall
Jul 27, 2009 · Apt 2R
Close - Paint/plaster
Wall
Jul 27, 2009 · Apt 2R
Close - Nonconst
Vermin
Jul 27, 2009 · Apt 2R
Close - Nonconst
Vermin
Jul 27, 2009 · Apt 2R
Close - Nonconst
Vermin
Jul 27, 2009 · Apt 2R
Close - Nonconst
Vermin
Jul 27, 2009 · Apt 2R
Close - Heating
Heat related
Jan 29, 2009 · Apt 1L
Close - Heating
Heat related
Jan 28, 2009 · Apt 1L
Close - Electric
Electric-supply
Jan 22, 2009 · Apt 2R
Close - Heating
Heat related
Jan 22, 2009 · Apt 2R
Close - Plumbing
Water supply
Jan 22, 2009 · Apt 1L
Close - Paint/plaster
Ceiling
Dec 11, 2008 · Apt 1L
Close - Electric
Wiring
Dec 11, 2008 · Apt 1L
Close - Nonconst
Vermin
Dec 8, 2008 · Apt 1L
Close - Paint/plaster
Wall
Dec 8, 2008 · Apt 1L
Close - Plumbing
Water-leaks
Dec 8, 2008 · Apt 1L
Close - Heating
Heat related
Dec 5, 2008 · Apt 1L
Close - Heating
Heat related
Nov 23, 2008 · Apt 1L
Close - Electric
Electric-supply
Nov 23, 2008 · Apt 1L
Close - Heating
Heat related
Nov 23, 2008 · Apt 1L
Close - Plumbing
Water supply
Nov 13, 2008 · Apt 1L
Close - Heating
Heat related
Nov 12, 2008 · Apt 1L
Close - Heating
Heat related
Nov 10, 2008 · Apt 1L
Close - Heating
Heat related
Nov 10, 2008 · Apt 1L
Close - Heating
Heat related
Nov 7, 2008 · Apt 1L
Close - Heating
Heat related
Nov 3, 2008 · Apt 1L
Close - Heating
Heat related
Oct 23, 2008 · Apt 1L
Close - General
Windows
Sep 22, 2008 · Apt 2R
Close - Construction
Roof
Sep 22, 2008 · Apt 2R
Close - Paint/plaster
Ceiling
Aug 29, 2008 · Apt 1L
Close - Plumbing
Water-leaks
Aug 29, 2008 · Apt 1L
Close - Electric
Electric-supply
Aug 18, 2008 · Apt 1L
Close - Plumbing
Water supply
Aug 16, 2008 · Apt 1L
Close - Nonconst
Rubbish
Aug 14, 2008 · Apt 2R
Close - Nonconst
Vermin
Aug 14, 2008 · Apt 2R
Close - Paint/plaster
Wall
Aug 14, 2008 · Apt 2R
Close - Paint/plaster
Wall
Aug 14, 2008 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,125 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3173 / 55
- Assessed value
- $510,750
- Landmark / historic district
- No
HPD registration #359862, last renewed Aug 20, 2025.
Questions about 163 Troutman Street
Who owns 163 Troutman Street?
The owner of record in NYC Department of City Planning PLUTO data is 163 Troutman Realty LLC.
Does 163 Troutman Street have violations?
Yes. NYC HPD has recorded 39 housing violations at this property.
Is 163 Troutman Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 163 Troutman Street built?
City records list 1931 as the year it was built.
How many apartments are in 163 Troutman Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.