125 Evergreen Avenue
Brooklyn, NY 11206BBL 3-03172-0006Map
Owner of record: Evergreen Terrace LLC
125 Evergreen Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 8 residential units across 4 floors. The owner of record is Evergreen Terrace LLC. HPD has recorded 321 housing violations here, most recently on January 18, 2025. 2 of the 50 most recent violations are still open.
- HPD violations
- 321
- DOB violations
- 8
- ECB violations
- 3
- HPD complaints
- 426
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 321
- CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room, 1st story
Jan 18, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jan 18, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees at all hotwater fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from west at north
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule hinges at public hall, 1st story
Jan 15, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 4th room from east located at apt 2l, 2nd story, 1st apartment from west at north
Apr 14, 2024 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 3rd room from east located at apt 2l, 2nd story, 1st apartment from west at north
Apr 14, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 4th room from east located at apt 2l, 2nd story, 1st apartment from west at north
Apr 14, 2024 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 3rd room from east located at apt 2l, 2nd story, 1st apartment from west at north
Apr 14, 2024 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 5th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st closet from north at east wall wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective rotted base of sink base cabinet in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, ceiling in the 5th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, west wall in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approx 3 sq.ft at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, 1st window frame from south at west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 32 sq.ft at north, east, south, west walls and ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, west wall, north wall, 1st door from east at south wall, east wall in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 7, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in vestibule at public hall, 1st story
Mar 5, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective strike plate locking device on door frame at building entrance
Mar 5, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at north and east walls, approx. 10 sq.ft. in the bathroom located at apt 4r, 4th story, 1st apartment from north at east
Apr 17, 2023 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective counter balance at lower sash at north window pane in the kitchen located at apt 4r, 4th story, 1st apartment from north at east
Apr 17, 2023 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4r, 4th story, 1st apartment from north at east
Apr 17, 2023 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 4r, 4th story, 1st apartment from north at east
Apr 17, 2023 · Apt 4R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 24, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Jun 29, 2021 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak through ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Jun 29, 2021 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, north wall in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from south at west
Jun 29, 2021 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak through ceiling in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from south at west
Jun 29, 2021 · Apt 3L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Jun 29, 2021 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active
ECB violations · 3
- Class - 2
Failure to maintain bldg in code compliant manner. at 1st fl hall 4 storage bins blocking hallway. remedy: maintain bldg remove.
Sep 23, 2015
Resolve - Class - 2
Occupancy contrary to that allowed by cofo & dept of bldg records. inerior rooms arranged & occupied within apt 3r & 4r in the 3sty apt 3r 4th room from east & in the 4sty apt 4r 3rd room from east inadquate li
Dec 5, 2011
Resolve - Non-hazardous
B4a/32a/21b/50a/50b/50c/50d/50e. (50a)pipe at water relief valve discharge down no threaded end. (50b)remove waste oil from boiler room. (50c)pipe safety or relief up right. (50d)flue pipe not properly sealed t
Apr 4, 2006 · Penalty $350
Active
Complaints
- Heat/hot water
Entire building
Jan 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2025 · Apt 2L
Close - Plumbing
Bathtub/shower
Jul 30, 2024 · Apt 4R
Close - Unsanitary condition
Pests
Jul 30, 2024 · Apt 4R
Close - Flooring/stairs
Floor
Jul 30, 2024 · Apt 4R
Close - Water leak
Slow leak
Jul 30, 2024 · Apt 4R
Close - Plumbing
Basin/sink
Jul 30, 2024 · Apt 4R
Close - Water leak
Slow leak
Mar 1, 2024 · Apt 2L
Close - Unsanitary condition
Mold
Mar 1, 2024 · Apt 2L
Close - Plumbing
Toilet
Feb 27, 2024 · Apt 2L
Close
Show 40 more ↓
- Plumbing
Basin/sink
Feb 27, 2024 · Apt 2L
Close - Water leak
Heavy flow
Feb 27, 2024 · Apt 2L
Close - Unsanitary condition
Mold
Feb 27, 2024 · Apt 2L
Close - Door/window
Window frame
Apr 12, 2023 · Apt 4R
Close - Appliance
Refrigerator
Apr 12, 2023 · Apt 4R
Close - Plumbing
Toilet
Apr 12, 2023 · Apt 4R
Close - Plumbing
Toilet
Apr 12, 2023 · Apt 4R
Close - Water leak
Heavy flow
Oct 11, 2022 · Apt 1L
Close - Plumbing
Basin/sink
Nov 29, 2021 · Apt 1L
Close - Flooring/stairs
Floor
Nov 29, 2021 · Apt 1L
Close - Plumbing
Toilet
Nov 29, 2021 · Apt 1L
Close - Paint/plaster
Wall
Nov 29, 2021 · Apt 1L
Close - Paint/plaster
Wall
Nov 29, 2021 · Apt 1L
Close - Paint/plaster
Ceiling
Nov 29, 2021 · Apt 1L
Close - Safety
Carbon monoxide detector
Nov 15, 2021 · Apt 3R
Close - Safety
Smoke detector
Nov 15, 2021 · Apt 3R
Close - Plumbing
Toilet
Sep 22, 2021 · Apt 1L
Close - Unsanitary condition
Pests
Jun 25, 2021 · Apt 3L
Close - Unsanitary condition
Mold
Jun 25, 2021 · Apt 3L
Close - Unsanitary condition
Pests
Jun 25, 2021 · Apt 3L
Close - Water leak
Slow leak
Jun 25, 2021 · Apt 3L
Close - Water leak
Heavy flow
Jun 22, 2020 · Apt 3L
Close - Flooring/stairs
Floor
Jun 22, 2020 · Apt 3L
Close - Unsanitary condition
Pests
Jun 22, 2020 · Apt 3L
Close - Paint/plaster
Wall
Jun 22, 2020 · Apt 3L
Close - Door/window
Door
Jun 22, 2020 · Apt 3L
Close - Water leak
Slow leak
Jun 22, 2020 · Apt 3L
Close - Unsanitary condition
Mold
Jun 22, 2020 · Apt 3L
Close - Paint/plaster
Wall
Jun 18, 2020 · Apt 3L
Close - Door/window
Door frame
Jun 18, 2020 · Apt 3L
Close - Water leak
Slow leak
Jun 18, 2020 · Apt 3L
Close - Electric
Outlet/switch
Jun 18, 2020 · Apt 3L
Close - Unsanitary condition
Pests
Jun 18, 2020 · Apt 3L
Close - Flooring/stairs
Floor
Jun 18, 2020 · Apt 3L
Close - Door/window
Door
Jun 18, 2020 · Apt 3L
Close - Paint/plaster
Ceiling
Jun 18, 2020 · Apt 3L
Close - Unsanitary condition
Mold
Jun 18, 2020 · Apt 3L
Close - General
Mailbox
May 27, 2020 · Apt 3L
Close - Paint/plaster
Wall
May 16, 2019 · Apt 1R
Close - Door/window
Door
May 16, 2019 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 5,750 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 34
- Block / lot
- 3172 / 6
- Assessed value
- $711,900
- Landmark / historic district
- No
HPD registration #329933, last renewed Aug 25, 2025.
Questions about 125 Evergreen Avenue
Who owns 125 Evergreen Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Evergreen Terrace LLC.
Does 125 Evergreen Avenue have violations?
Yes. NYC HPD has recorded 321 housing violations at this property.
Is 125 Evergreen Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 125 Evergreen Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 125 Evergreen Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.