roofy

126 Melrose Street

Brooklyn, NY 11206BBL 3-03162-0019Map

Owner of record: 126 Melrose LLC

126 Melrose Street is a walk-up apartment building built in 1931 in Brooklyn, 11206. It has 6 residential units across 3 floors. The owner of record is 126 Melrose LLC. HPD has recorded 33 housing violations here, most recently on March 24, 2023. 1 of the 33 most recent violations are still open.

HPD violations
33
DOB violations
13
ECB violations
1
HPD complaints
55

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 24, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 33

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 24, 2023

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 2nd apartment from east at south

    Mar 22, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing the doors that is missing or defective . in the entrance located at apt 2r, 2nd story, 2nd apartment from east at south

    Mar 22, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east

    Dec 6, 2022 · Apt 1L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east

    Dec 6, 2022 · Apt 1L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east

    Dec 6, 2022 · Apt 1L

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing the doors that is missing or defective door to rear yard in the 4th room from north located at apt 1l, 1st story, 1st apartment from north at east

    Dec 6, 2022 · Apt 1L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story

    Feb 26, 2022

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story

    Feb 26, 2022

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Feb 26, 2022

    Closed — Violation dismissed
Show 23 more ↓
  • B

    Remove all encumbrances consisting of household items at public hall, 2nd story

    Feb 26, 2022

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors leading to rear yard in the 4th room from north located at apt 1r, 1st story, 1st apartment from south at west

    May 15, 2021 · Apt 1R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice located at apt 3l, 3rd story, 1st apartment from east at south

    Apr 11, 2011 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing located at apt 3l, 3rd story, 1st apartment from east at south

    Apr 11, 2011 · Apt 3L

    Closed — Violation dismissed
  • B

    Replace with new the missing electrical light switch cover at west wall in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south

    Apr 11, 2011 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective wood door frame at south in the 1st room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Apr 11, 2011 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective bell buzzer system from 1st story public hall to apartment 3l, 3rd. story

    Apr 11, 2011

    Closed — Violation dismissed
  • B

    Replace with new the missing siding apporx. 64 sq. ft. at front areaway, 3rd story

    Apr 11, 2011

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the 2nd room from north, the bathroom located at apt 3l, 3rd story, 1st apartment from east at south

    Apr 11, 2011 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of uncapped radiator valve in the kitchen located at apt 3r, 3rd story, 2nd apartment from east at south

    Nov 9, 2005 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 3, 2005 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , west wall, south wall, ceiling in the 4th room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 3, 2005 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , ceiling in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 3, 2005 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , east wall, ceiling in the 1st room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 3, 2005 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color , west wall, east wall, south wall, north wall, ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 3, 2005 · Apt 3L

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 2nd door from east at south wall, 2nd door frame from east at south wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 3, 2005 · Apt 3L

    Open — Nov sent out
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 minimum watts required.

    Aug 12, 1999

    Closed — Violation dismissed
  • B

    D26-10.01 adm code properly repair with similar material the broken or defective plaster board ceiling cellar throughout.

    Nov 18, 1987

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors stair enclosure 1 sty public hall to cellar.

    Nov 18, 1987

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of vent sealed with cement mortar boiler room rear cellar.

    Nov 18, 1987

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors 3 sty west apt 3r.

    Nov 18, 1987

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors 2 sty west apt 2r.

    Nov 18, 1987

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors 1 sty east apt 1l.

    Nov 18, 1987

    Closed — Violation dismissed

DOB building violations · 13

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
Show 3 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed

ECB violations · 1

  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 30000058954y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo

    May 28, 2025 · Penalty $625

    Active

Complaints

  • Unsanitary condition

    Pests

    Feb 3, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Feb 1, 2023 · Apt 126

    Close
  • Plumbing

    Basin/sink

    Feb 1, 2023 · Apt 126

    Close
  • Unsanitary condition

    Pests

    Jan 25, 2023 · Apt 1RMOUS

    Close
  • Unsanitary condition

    Pests

    Jan 19, 2023 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Jan 14, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Jan 13, 2023 · Apt 1L

    Close
  • General

    Janitor/super

    Dec 14, 2022 · Apt 1L

    Close
  • Plumbing

    Water supply

    Dec 14, 2022 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2022 · Apt 1R

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 3, 2022 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Nov 2, 2022 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Feb 25, 2022 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Feb 25, 2022 · Apt LB

    Close
  • Unsanitary condition

    Mold

    Feb 25, 2022 · Apt LB

    Close
  • Electric

    Power outage

    Feb 25, 2022 · Apt 1L

    Close
  • Safety

    Smoke detector

    May 13, 2021 · Apt 1R

    Close
  • Door/window

    Door

    Sep 18, 2018 · Apt 1L

    Close
  • Door/window

    Door

    Sep 18, 2018 · Apt 2R

    Close
  • Door/window

    Door

    Sep 18, 2018 · Apt 3R

    Close
  • Paint/plaster

    Ceiling

    Sep 18, 2018 · Apt 3R

    Close
  • Outside building

    Roof door/hatch

    Mar 19, 2018 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Sep 25, 2015 · Apt 1R

    Close
  • Heating

    Heat related

    Dec 31, 2011 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Apr 30, 2011 · Apt 3L

    Close
  • Nonconst

    Vermin

    Mar 22, 2011 · Apt 3L

    Close
  • Nonconst

    Vermin

    Mar 22, 2011 · Apt 3L

    Close
  • General

    Floor

    Mar 22, 2011 · Apt 3L

    Close
  • Heating

    Heat related

    Mar 22, 2011 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Dec 31, 2010 · Apt 1L

    Close
  • General

    Windows

    Dec 31, 2010 · Apt 1L

    Close
  • Plumbing

    Toilet

    Dec 31, 2010 · Apt 1L

    Close
  • Plumbing

    Bathtub/shower

    Dec 31, 2010 · Apt 1L

    Close
  • Heating

    Heat related

    Dec 21, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 17, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 16, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 15, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 21, 2005 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 3, 2005 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 17, 2005 · Apt ANON

    Close
  • Heating

    Heat related

    Nov 3, 2005 · Apt BLDG

    Close
  • Plumbing

    Radiator

    Oct 11, 2005 · Apt 3L

    Close
  • Plumbing

    Water supply

    Oct 11, 2005 · Apt 3L

    Close
  • General

    Floor

    Oct 11, 2005 · Apt 3L

    Close
  • Electric

    Wiring

    Oct 11, 2005 · Apt 3L

    Close
  • General

    Cabinet

    Oct 11, 2005 · Apt 3L

    Close
  • General

    Ceramic-tile

    Oct 11, 2005 · Apt 3L

    Close
  • General

    Floor

    Oct 11, 2005 · Apt 3L

    Close
  • Nonconst

    Vermin

    Oct 11, 2005 · Apt 3L

    Close
  • Nonconst

    Vermin

    Oct 11, 2005 · Apt 3L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
3,750 ft²
Lot area
2,500 ft²
Zoning
M1-1
Community board
304
Council district
34
Block / lot
3162 / 19
Assessed value
$557,100
Landmark / historic district
No

HPD registration #359453, last renewed Sep 6, 2024.

Questions about 126 Melrose Street

Who owns 126 Melrose Street?

The owner of record in NYC Department of City Planning PLUTO data is 126 Melrose LLC.

Does 126 Melrose Street have violations?

Yes. NYC HPD has recorded 33 housing violations at this property.

Is 126 Melrose Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 126 Melrose Street built?

City records list 1931 as the year it was built.

How many apartments are in 126 Melrose Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.