roofy

96 Moore Street

Brooklyn, NY 11206BBL 3-03106-0014Map

Owner of record: Moore & Moore LLC

96 Moore Street is a walk-up apartment building built in 2025 in Brooklyn, 11206. It has 8 residential units across 4.25 floors. The owner of record is Moore & Moore LLC. HPD has recorded 17 housing violations here, most recently on September 23, 2026. 16 of the 17 most recent violations are still open.

HPD violations
17
DOB violations
0
ECB violations
0
HPD complaints
21

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 17

  • C

    Remove the illegal fastening double cylinder lock installed at building entrance door at public hall, 1st story

    Sep 23, 2026

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at all walls at laundry room at cellar

    Sep 23, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls at laundry room at cellar

    Sep 23, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Sep 23, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Sep 23, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Sep 23, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall

    Sep 23, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Sep 23, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Sep 23, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective at north, south, east and west walls in the 1st room from north located at apt 1a lower level, 1st story, 1st apartment from south at west

    Sep 11, 2026 · Apt 1A

    Open — Nov sent out
Show 7 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and north, south, east and west walls thoughtout. in the 1st room from north located at apt 1a lower level, 1st story, 1st apartment from south at west

    Sep 11, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 10, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and north, south, east and west walls thoughtout at cellar

    Sep 10, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at building front entrance

    Sep 10, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling, north, south, east and west walls. at cellar

    Sep 10, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at cellar

    Jun 6, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at cellar

    Jun 6, 2026

    Open — Invalid certification

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Pests

    Sep 20, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Sep 20, 2026 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Sep 9, 2026 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 1, 2026 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Sep 1, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Aug 28, 2026 · Apt 2A

    Close
  • Water leak

    Damp spot

    Aug 28, 2026 · Apt 2A

    Close
Show 11 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Aug 28, 2026 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Aug 25, 2026 · Apt 1A

    Close
  • Water leak

    Slow leak

    Aug 25, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Sewage

    Aug 20, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Aug 20, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Aug 20, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Jun 5, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    May 20, 2026 · Apt 1A

    Close
  • Unsanitary condition

    Mold

    Apr 1, 2026 · Apt 4B

    Close
  • Safety

    Sprinkler

    Mar 10, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2022 · Apt 4F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2025
Floors
4.25
Residential units
8
Building area
6,357 ft²
Lot area
2,500 ft²
Zoning
R6
Community board
301
Council district
34
Block / lot
3106 / 14
Assessed value
$1,038,150
Landmark / historic district
No

HPD registration #392054, last renewed Jul 23, 2026.

Questions about 96 Moore Street

Who owns 96 Moore Street?

The owner of record in NYC Department of City Planning PLUTO data is Moore & Moore LLC.

Does 96 Moore Street have violations?

Yes. NYC HPD has recorded 17 housing violations at this property.

Is 96 Moore Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 96 Moore Street built?

City records list 2025 as the year it was built.

How many apartments are in 96 Moore Street?

It has 8 residential units and 9 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.