142 Graham Avenue
Brooklyn, NY 11206BBL 3-03071-0006Map
Owner of record: Graham Living LLC
142 Graham Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11206. It has 8 residential units across 5 floors. The owner of record is Graham Living LLC. HPD has recorded 25 housing violations here, most recently on September 21, 2026. 12 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 26
- ECB violations
- 14
- HPD complaints
- 6
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from east at south
Sep 21, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4b, 4th story, 1st apartment from east at south
Sep 21, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4b, 4th story, 1st apartment from east at south
Sep 21, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south
Sep 21, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south
Sep 21, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 21, 2026
Open — Nov sent out
Show 15 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective latch at building front entrance door , 1st story
Feb 11, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 25, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 1st story, apartment at east
Feb 17, 2020 · Apt 1B
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation dismissed
DOB building violations · 26
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Construction other optional
Make site safe, stop all work forthwith contact commissioner's office at 718 802-3677
Oct 10, 2014
Dob violation - dismissed - Construction other optional
Make site safe, stop all work forthwith contact commissioner's office at 718 802-3677
Oct 10, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 24, 2014
Dob violation - dismissed - Construction other optional
Borough comm. has ordered all work application withdrawal from appl#310116806./remedy: stop all work immediately and make the site sa fe
Jul 23, 2014
Dob violation - dismissed - Construction other optional
Borough comm. has oredered all work stopped due to applicant withdrawa l from appl#320078919/remedy; stop all work immediately and make the s ite safe
Jul 23, 2014
Dob violation - dismissed - Construction other optional
Stop all work immediately and make the site safe!
Jul 23, 2014
Dob violation - dismissed - Construction other optional
Stop all work immediately and make site safe
Jul 23, 2014
Dob violation - dismissed
Show 16 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 9, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 24, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 12, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2002
Dob violation - resolved - Elevator elevatorrequired
3p901
Apr 12, 2000
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 1997
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 17, 1995
Dob violation - dismissed
ECB violations · 14
- Class - 1
11m06 97x10 99bb05 98bb05 21q03.11-m-06-exposed wiring inside the elevator,car button station removed 97-x-10-elevator not running.restore to service so proper insp could be performed.21-q-03-lobby interlock co
Jun 27, 2014 · Penalty $5,000
Resolve - Class - 2
Supported scaffolds at exp 1 does not meet dob code specifications. noted: loose safety netting. pictures filed. remedy: maintain supported scaffold safety nettings.
Jan 17, 2014 · Penalty $400
Resolve - Class - 2
Sidewalk shed at exp #1 does not meet dob code specifications. noted: missing horizontal braces at multiple locations. pictures filed. remedy: comply w/dob code requirements.
Jan 17, 2014 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations in that at front facade,netting from pipe scaffold,erected on top of sidewalk shed has come loose & is now hanging from shed &
Jan 15, 2014 · Penalty $12,000
Resolve - Class - 2
97##5 failure to maintain elevator device.respondent failed to allow mandatory annual/routine inspetion by the dept or approved agency per 28-304.6.1 and appendix k of the building code.multiple attempts to ga
Sep 26, 2013 · Penalty $530
Resolve - Class - 2
97** failure to maintain elevator device.respondent failed to provide proper access in order that the dob can perform periodic inspection per 28-304.6 and appendix k of the building code respondent failed to pr
Mar 25, 2013 · Penalty $500
Resolve - Class - 2
Sidewalk shed does not meet bldg code specifications. noted: at time of inspectioon signage from the permit holder had not been posted as required by bldg code. remedy: conform to bldg code specifications.
May 30, 2012 · Penalty $4,000
Resolve - Class - 2
Sidewalk shed does not meet bldg code specifications. noted: at time of inspection parapet for sidewalk shed was damaged. section of the end catcher (45 degree angles) was missing on the left side. remedy:
May 30, 2012 · Penalty $10,000
Resolve - Class - 2
Sec. 28-105.11;27-194 misc violation. failure to post work permit on aconstruction or demolition site in a conspicuous location. noted: building is closed for work under alt 1 permit #310216806 permit is not vi
Aug 11, 2009
Resolve - Non-hazardous
83x10/11b10/66o02. 83- repair & restore to service so a full inspection can be made by this dept.
May 16, 2006 · Penalty $180
Resolve
Show 4 more ↓
- Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy or bldg dept records. illegal occupancy noted: at 3rd flr of bldg one room is being used for physical theapy treatment.
May 4, 2006 · Penalty $400
Resolve - Non-hazardous
75u 57o
Jan 13, 1999 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain ythe rear,exterior wall.approximately a 4ft.x 10 ft.area of the rear ,2 floor wall is burned 2 months,thus,exposing the brick elevator shaft wall.remedy:repair and seal the wall.
May 2, 1995 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain rear bldg wall:approx.4ftx10ft,area of the 2floor rear wall is burned away,thus,exposing the brick,elevator shaft,wall. remedy:replace all charged studs and properly seal the wall.
Mar 24, 1995 · Penalty $175
Resolve
Complaints
- General
Ventilation system
Sep 16, 2026 · Apt 4B
Close - Water leak
Heavy flow
Sep 16, 2026 · Apt 4B
Close - Door/window
Door
Feb 12, 2025 · Apt BUILDI
Close - Door/window
Door
Feb 6, 2025 · Apt BUILDI
Close - Door/window
Door
Feb 3, 2025 · Apt 5F
Close - Heat/hot water
Apartment only
Feb 14, 2020 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 8
- Building area
- 8,909 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 3071 / 6
- Assessed value
- $725,850
- Landmark / historic district
- No
HPD registration #388226, last renewed Aug 26, 2020.
Questions about 142 Graham Avenue
Who owns 142 Graham Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Graham Living LLC.
Does 142 Graham Avenue have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 142 Graham Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 142 Graham Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 142 Graham Avenue?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.