46 Meserole Street
Brooklyn, NY 11206BBL 3-03049-0027Map
Owner of record: 46 Meserole Street LLC
46 Meserole Street is a walk-up apartment building built in 2013 in Brooklyn, 11206. It has 7 residential units across 4 floors. The owner of record is 46 Meserole Street LLC. HPD has recorded 17 housing violations here, most recently on April 17, 2024. 5 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 3
- ECB violations
- 19
- HPD complaints
- 88
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. at public hall, 1st story
Aug 11, 2023
Open — Invalid certification - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box [ missing ] at public hall, 1st story
Aug 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 11, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story
Aug 11, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household articles on floor at public hall, 4th story
Aug 11, 2023
Open — Invalid certification - BHazardous
Remove all encumbrances consisting of household articles at intermediate landing at public hall stairs, 3rd story
Aug 11, 2023
Open — Invalid certification - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 11, 2023
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at building front entrance court
Aug 11, 2023
Open — Nov sent out
Show 7 more ↓
- BHazardous
Provide security in the event of power outage ,by means of an acceptable mechanical heavy-duty lock and latch set on front entrance door to building , 1st story
Aug 11, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 20, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 23, 2015
Closed — Violation dismissed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2011
Dob violation - dismissed - Emergency none
Egncy-emergency none
May 28, 2010
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Feb 24, 2010
Dob violation - dismissed
ECB violations · 19
- Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. note: at the time of my inspection construction work in progress. upon request for approved & accepted plans none was provided,for
Aug 11, 2014
Resolve - Class - 2
Work does not conform to approved const documents &/or approved plans.note:@ the time of my insp const work in progress,i observed that there were three balconies on the 2nd fl level @ exp three,being const rev
Jun 25, 2014 · Penalty $250
Resolve - Class - 1
Failure to maintain / institute safety equipment measure or temporary const. guardrails are missing @ 3rd fl parapet ( 1" high) @ exposure 1also temp. railing @ 4th fl set lock is defective ( not attached @ are
Jun 17, 2014 · Penalty $1,200
Resolve - Class - 2
3303.11 required means of egress has not been maintained no lighting has been provided for inner stairway at all floors. remedy : partial l ighting in stairway and where necessary
Jun 17, 2014
Resolve - Class - 1
Failure to maintain adequare housekeeping per section requirements. anexcessive amount of debris, garbage, used material, etc was observed throughout each fl of bldg including roof & rear yard. note : some of t
Jun 17, 2014 · Penalty $2,400
Resolve - Class - 2
Work w/o permit, expired permit. noted: construction fence at rear & front of site in place. no fence permit was obtained. remedy: obtain permit.
Feb 22, 2012 · Penalty $800
Resolve - Class - 2
Failure to maintain. at front of lot cellar access door is defecttive loose and unsafe to stand/walk on. defective access door is covered w/an unsecured plywood board. remedy: make site safe. make repairs
Jun 2, 2011 · Penalty $500
Resolve - Class - 2
Illegal use in a residential district. residential district is r6. @ time of inspection vacant lot is used to store commercial truck dumpsters & other, bldg/construction materials/equipment.remedy: discontinue
Jun 2, 2011 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. noted: 8'high plywood job site fence erected, w/appl 320068966 is missing a 4'high x 8'long section at front of site (north side). making vacant graded lot
Feb 14, 2011 · Penalty $1,000
Resolve - Class - 2
Work w/o permit.work noted:approx 66 linear feet x 8 feet high of plywood construction fence erected @ front & rear of side w/o permit.rem:obtain permit immediately
Feb 14, 2011 · Penalty $800
Resolve
Show 9 more ↓
- Class - 2
1704.1.1 misc violations failure to file a special inspection statement of responsibilty prior to permit issuance & prior to start of wk under special insp requirement there are metal c joists installed @ the r
Feb 22, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to safeguad all persons & property affected by construction operations 320068966a2 due to unsafe demolition operations & not following the sequance of demolition the structural stability of the bldg
Feb 22, 2010
Resolve - Class - 2
Failure to provide sidewalk shed where required the sidewalk shed installed does not extend five feet past the side of the lot-line contrary to d o b requirements on both sides 320102009 provide sidewalk shed
Feb 22, 2010 · Penalty $2,400
Resolve - Class - 1
Misc violations removal or bearing & staying partitions before the floor framing system on the floor above has been removed the interior bearing partitions have been removed leaving the flr joist @ the 2nd /3rd
Feb 22, 2010 · Penalty $8,000
Resolve - Class - 1
Miscellaneous violations failure to properly shore & brace a weakend structure prior to full or partial demo the sequence of demo has not been followed & leaking the structural stability of the bldg unsafe & ha
Feb 22, 2010 · Penalty $8,000
Resolve - Class - 2
Work does not conform to approved construction documents &/orapproved amendments the 1st flr hallway walls have been removed & metal cjoistswere installed at the roof the plans called for wood joists 320068966a
Feb 22, 2010 · Penalty $500
Resolve - Class - 2
3303.2.4misc vio failure to provide require temporary or permanent sanitary facilities during construction remodeling or demolition opertions no such facility @time of inspection 2 men onsite cleaning debris
Feb 22, 2010 · Penalty $4,000
Resolve - Class - 3
Failure to maintain bldg wall front facade east side verticl crack fr om 2nd fl to roof remedy: make all repairs maintain exterior bldg wall
Mar 18, 2009 · Penalty $200
Resolve - Hazardous
B4b,bq9,32a,36,50a,b,c,d,e,f. 50a. flue pipe not properly sealed to chimney. 50b. holes in boiler room walls & ceiling. 50c. pipe back flow preventor discharge down no threaded end. 50d. pipe safety or relief
Oct 23, 2007 · Penalty $1,300
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 2, 2022 · Apt BLDG
Close - General
Cooking gas
Oct 13, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 26, 2016 · Apt 3B
Close - Heating
Heat related
Nov 20, 2009 · Apt 1L
Close - Paint/plaster
Wall
Aug 8, 2008 · Apt 1R
Close - General
Floor
Aug 8, 2008 · Apt 1R
Close - General
Ceramic-tile
Aug 8, 2008 · Apt 1R
Close - Plumbing
Bathtub/shower
Aug 8, 2008 · Apt 1R
Close - General
Floor
Aug 8, 2008 · Apt 1R
Close
Show 40 more ↓
- Nonconst
Janitor/super
Aug 5, 2008 · Apt 1L
Close - General
Mailbox
Aug 5, 2008 · Apt 1L
Close - Nonconst
Vermin
Aug 5, 2008 · Apt 1L
Close - Nonconst
Janitor/super
Aug 5, 2008 · Apt 1L
Close - Nonconst
Vermin
Aug 5, 2008 · Apt 1L
Close - General
Doors
Aug 5, 2008 · Apt 1L
Close - Plumbing
Water-leaks
Aug 5, 2008 · Apt 1L
Close - Plumbing
Basin/sink
Aug 5, 2008 · Apt 1L
Close - General
Floor
Aug 5, 2008 · Apt 1L
Close - Heating
Heat related
Aug 4, 2008 · Apt 3L
Close - Plumbing
Water supply
Jul 25, 2008 · Apt 1L
Close - Nonconst
Janitor/super
Jul 23, 2008 · Apt 1R
Close - Plumbing
Basin/sink
Jul 23, 2008 · Apt 1R
Close - Nonconst
Rubbish
Jul 23, 2008 · Apt 1R
Close - Nonconst
Smoke detector
Jul 23, 2008 · Apt 1R
Close - Electric
Bell-buzzer/intercom
Jul 23, 2008 · Apt 1R
Close - General
Mailbox
Jul 23, 2008 · Apt 1R
Close - Heating
Heat related
Jul 23, 2008 · Apt 1R
Close - Nonconst
Vermin
Jul 23, 2008 · Apt 1R
Close - Nonconst
Vermin
Jul 23, 2008 · Apt 1R
Close - Nonconst
Vermin
Jul 23, 2008 · Apt 1R
Close - Nonconst
Vermin
Jul 23, 2008 · Apt 1R
Close - General
Floor
Jul 23, 2008 · Apt 1R
Close - Electric
Wiring
Jul 23, 2008 · Apt 1R
Close - Nonconst
Vermin
Jul 23, 2008 · Apt 1R
Close - General
Windows
Jul 23, 2008 · Apt 1R
Close - Paint/plaster
Wall
Jul 23, 2008 · Apt 1R
Close - Plumbing
Water-leaks
Jul 23, 2008 · Apt 1R
Close - Plumbing
Basin/sink
Jul 23, 2008 · Apt 1R
Close - Heating
Heat related
Jul 23, 2008 · Apt 2L
Close - Nonconst
Rubbish
Jul 23, 2008 · Apt 1R
Close - General
Ceramic-tile
Jul 22, 2008 · Apt 1L
Close - Nonconst
Vermin
Jul 22, 2008 · Apt 1L
Close - Nonconst
Vermin
Jul 22, 2008 · Apt 1L
Close - General
Windows
Jul 22, 2008 · Apt 1L
Close - Plumbing
Water-leaks
Jul 22, 2008 · Apt 1L
Close - General
Mold
Jul 22, 2008 · Apt 1L
Close - Paint/plaster
Wall
Jul 22, 2008 · Apt 1L
Close - Plumbing
Water-leaks
Jul 22, 2008 · Apt 1L
Close - General
Cabinet
Jul 22, 2008 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2013
- Floors
- 4
- Residential units
- 7
- Building area
- 6,611 ft²
- Lot area
- 2,319 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 3049 / 27
- Assessed value
- $1,228,950
- Landmark / historic district
- No
HPD registration #385482, last renewed Jul 8, 2026.
Questions about 46 Meserole Street
Who owns 46 Meserole Street?
The owner of record in NYC Department of City Planning PLUTO data is 46 Meserole Street LLC.
Does 46 Meserole Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 46 Meserole Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 46 Meserole Street built?
City records list 2013 as the year it was built.
How many apartments are in 46 Meserole Street?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.