53 Scott Avenue
Brooklyn, NY 11237BBL 3-02989-0032Map
Owner of record: S53 LLC
53 Scott Avenue is a factory / industrial built in 2021 in Brooklyn, 11237. The owner of record is S53 LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 5
- ECB violations
- 12
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 5
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under application #321588796 on 6/3/22 due to construction superintendent withdrawal
Jun 7, 2022
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under application #321588796 on 6/3/22 due to construction superintendent withdrawal
Jun 7, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed
ECB violations · 12
- Class - 2
Pedestrian protection does not meet code specification observed sidewalk shed erected at active job site.the post were not nailed down to wood blocks.some pods were not placed/position on the wood blocks proper
May 13, 2022 · Penalty $5,000
Resolve - Class - 2
Bc3307.6.5.7 unable to provide periodic insp letter.atoi,const site was active&performing interior finishing&framing work.upon request unable to provide periodic insp letter for sws co,which requires on every 6
Feb 22, 2022
Resolve - Class - 2
Pedestrian protectiond oes not meet code specifications.at time of inspection at an active construction job site,i observed active work at roof level at exposure#2 and curtain wall at exposure#3 within 10ft exp
Jan 20, 2022 · Penalty $2,400
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33.at time of inspection at an active construction job site,upon requesting embedded concrete safety straps log for safety straps being used on
Jan 20, 2022
Resolve - Class - 1
Bc33016-design drawings.at time of inspection at an active construction job site,i observed working platforms at freight elevator shaft from1st floor through 6th floor,upon request for design drawing for the sa
Jan 20, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain/display onsite documents required by chapter 33. at time of inspection observed sidewalk shed in place. upon request of the dept of bldgs approved drawings. none where available or could be
Oct 27, 2021 · Penalty $3,125
Resolve - Class - 2
Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance w/section. at time of inspection observed a sidewalk shed in place. sidewalk shed did not have posted or
Oct 27, 2021
Resolve - Class - 2
Failure to maintain/display onsite documents required by chapter 33.atthe time of inspection at a 4 story new building active jobsite.upon request for sidewalk shed drawings,permit holder failed to provide/disp
Sep 15, 2021
Resolve - Class - 2
Failed to provide debris netting at space bet sidewalk shed and construction fence.at time of inspection of proposed 4 story commercial nb observed construction fence in place and sidewalk shed and fence with d
Aug 10, 2021
Resolve - Class - 1
Permit holder failed to ensure workers attend pre-shift safety meetingprior to commercement of work. note: at time of inspection of 4 sty new bldg currently at foundation level,work in progress. upon my request
Jul 1, 2021 · Penalty $5,000
Resolve
Show 2 more ↓
- Class - 1
Failure to notify dept prior to commencement of earthwork note:@time of my insp of proposed 4stynb under const,active jobsite in foundation phase.upon rev of dept records of notification prior to start of earth
May 12, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3301.7 doc to be kept on site.note:@time of my insp of proposed 4stynb under const active jobsite in foundation phase.upon request for preconst survey upon request for monitoring records,none were produced th
May 12, 2021 · Penalty $2,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Factory / industrial (F9)
- Year built
- 2021
- Floors
- 5
- Residential units
- —
- Building area
- 58,115 ft²
- Lot area
- 11,925 ft²
- Zoning
- M3-1
- Community board
- 301
- Council district
- 34
- Block / lot
- 2989 / 32
- Assessed value
- $4,169,250
- Landmark / historic district
- No
Questions about 53 Scott Avenue
Who owns 53 Scott Avenue?
The owner of record in NYC Department of City Planning PLUTO data is S53 LLC.
Does 53 Scott Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 53 Scott Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 53 Scott Avenue built?
City records list 2021 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.