125 Maspeth Avenue
Brooklyn, NY 11211BBL 3-02885-0001Map
Owner of record: Maspeth Park Housing Development Fund Co Rporation
125 Maspeth Avenue is an elevator apartment building built in 2025 in Brooklyn, 11211. It has 311 residential units across 18 floors. The owner of record is Maspeth Park Housing Development Fund Co Rporation. HPD has recorded 4 housing violations here, most recently on September 26, 2018.
- HPD violations
- 4
- DOB violations
- 414
- ECB violations
- 106
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Sep 26, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures located at dormitory 323, 3rd story
Sep 17, 2018 · Apt 323
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures at community bathroom, 1st story
Oct 12, 2016
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at dormitory 605, 1st story
May 3, 2016 · Apt 605
Closed — Violation closed
DOB building violations · 414
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2019
Dob violation - resolved - Plumbing none
The department of buildings intends to revoke all plumbing work under permit number laa 310355219 due to master plumber license suspended lmp number 1839 stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Mar 19, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2017
Dob violation - resolved
ECB violations · 106
- Class - 2
Monorail suspended scaffold system installed contrary to plans-attachment of beams to concrete slab-using choke/sling lines-as per plan 5/16" wire rope with j-bolts at top and bottom ,timble,shackle to be used,
Jul 28, 2026 · Penalty $1,250
Active - Class - 2
Observed installed fixed monorail multipoint suspended scaffold on site-upon checking dob records-no notification for fixed/non adjustable scaffold provided to dob as required(only counterweights/adjustable sca
Jul 28, 2026 · Penalty $2,500
Active - Class - 2
At the time of my inspection -observed outrigger beam suspended scaffold installed at exp#2(roof) with tieback installed to angle anchorage system on concrete wall-no pull test performed/provided as required-st
Jul 28, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection, during a department-issued high wind advisory, observed a suspended scaffold platform landed on the edge of the seventh-floor balcony without protection and not secured as required by the
Jul 28, 2026 · Penalty $620
Resolve - Class - 2
Responding to an incident, where worker istvan benedek resulted in injury his right leg when testing material hoist, inspection revealed. contractor failure to safeguard, no means and methods how to handle mate
Jul 27, 2026 · Penalty $5,000
Active - Class - 1
At time of inspection observed: pre-cast (5' by 5' approx.) panel installation in progress, using chain hoist not showing on drawings. no blow-up drawings section and details for manual rail system. creating un
Jul 27, 2026 · Penalty $2,500
Resolve - Class - 1
18-story new building, i observed facade work at exposures 1 and 2 using a suspended scaffold while workers were below without overhead protection or a controlled access zone. this created a hazardous condition
Jul 16, 2026 · Penalty $10,000
Resolve - Class - 1
At the time of my inspection of a 18 story new building,responding to an incident reported by local 79 that worker got injured. i observed suspended scaffold installed at exposure #1,2,3,4,upon scanning of 1 sc
Apr 29, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection, responding to an incident reported by local 79 that worker got injured. investigation reveal that incident occurred from 04-22-2026. injured worker was waiting for the elevator at
Apr 29, 2026 · Penalty $5,000
Resolve - Class - 1
Bc 2104.5. failure to provide masonry cmu block wall construction bracing accordance with tms 602/aci 530.1 asce 6 section 3.3e. as noted attime of inspection on an active construction site 18 story new buildin
May 16, 2025 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 2
Failure to maintain/display on site documents required by bc chapter 33. as noted at time of inspection on an active construction site, 18 story new building completed to bulkhead. observed at floors 17th, 18th
May 16, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to provide a continous inspection during grouting operation. as noted at time of inspection at an active construction site, 18 storynew building. observed at 1st floor exposure #2. cmu block masonry wal
May 16, 2025
Resolve - Class - 2
A time of inspection cn-717/24, cd-4409, liebherr ltm-1100-4.2, crane user rnc industries llc failed to have a licensed lift director, master rigger or master rigger foreman on site.; 28-424.2, comply with code
Apr 3, 2025
Resolve - Class - 2
A time of inspection cn-717/24, cd-4409, liebherr ltm-1100-4.2, gc: broadway builders llc failed to have a licensed lift director, master rigger or master rigger foreman on site; 28-424.2, comply with code
Apr 3, 2025
Resolve - Class - 2
At the time of inspection active job site at foundation phase i observed 2 trucks parked with concrete operation in progress obstructing sidewalk shared by public with no dot permit to close sidewalk creating a
Dec 9, 2024 · Penalty $625
Resolve - Class - 2
At the time of inspection active jobsite i observed sidewalk not maintained as per code(3303.4.1.1}referencing to chapter 33 i observed dirt and debris on the ground adjacent to jobsite fence at exposure#1 crea
Dec 9, 2024 · Penalty $2,500
Resolve - Class - 2
Noted: observed throughout cellar at various locations, spalling and missing concrete exposing re-bars and steel beams of the ceiling slab, also compromising fireproofing of steel beams., repair and/or replace
Nov 9, 2021 · Penalty $1,562
Active - Class - 2
Noted: observed throughout entire building at each floor more than 20 existing emergency lights were not operational when tested., repair/replace lighting
Nov 9, 2021 · Penalty $625
Active - Class - 2
Noted: building altered/changed from a medical facility and now occupied as a homeless shelter contrary to certificate of occupancy #214644., obtain a valid c of o or discontinue illegal occupancy
Nov 9, 2021 · Penalty $3,125
Active - Class - 1
Work without a permit.
Sep 28, 2021 · Penalty $2,500
Active - Class - 2
Unregistered boiler.
Sep 28, 2021 · Penalty $625
Active - Class - 1
Upon inspection device was found out of service. restore to service immediately and contact the dob at [email protected] for a complete inspection.
Sep 23, 2021 · Penalty $1,250
Active - Class - 1
Upon inspection device was found out of service. restore to service immediately and contact dob at [email protected] for a complete inspection.
Sep 23, 2021 · Penalty $1,250
Active - Class - 2
Failure to maintain the building in code compliant manner- observed at the above address no ventilation in gas meter rooms located the basement/cellar., repair and/or replace
Mar 2, 2020 · Penalty $1,562
Active - Class - 1
I observed exposed current carrying conductors and dangerous wiring methods of equipments, was installed at basement and roof location. energized wires protruding from ridged conduit running horizontal on parap
Mar 2, 2020 · Penalty $1,600
Active - Class - 2
Failure to maintain the building in code compliant manner- observed at the above address sprinkler head located on the 6 floor stairway installed incorrectly( sprinkler installed into the ceiling)., repair and/
Mar 2, 2020 · Penalty $625
Active - Class - 2
I observed no ventilation in the gas meter room located in the basement. , repair and/or replace
Aug 21, 2019
Active - Class - 1
97x17 upon inspection the device is found to be out of service creating a hazardous condition as per 1rcny 11-02. restore to service immediately and notify nyc dob taht the device has been returned to service
Jun 23, 2019
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #353728542 issued on 11/20/18 and to file a cert.of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissioner's
May 1, 2019
Active - Class - 3
Failure to maintain bldg in code-compliant manner. obsered on 3/4/19 at above address cracked sight glass on 2 out of 3 boilers. rmdy: repair and or replace. *photos taken
Mar 4, 2019
Active - Class - 2
Altered/changed building occupied w/o a valid certificate of occupancyas per 28-118.3.1, 28-118.3.2. building altered from a medical labora tory into a homelss shelter, cofo #214644 indicates premise to be for
Mar 4, 2019
Active - Class - 3
Failure to maintain building in code-compliant manner. observed n 3/4/19 at above address zip screws used on dryer fl. rmdy: repair and replace. *photos taken.
Mar 4, 2019
Active - Class - 2
Failure to maintain building in code compliant manner. noted: observedthroughout cellar, spalling concrete of ceiling slab throughout cellarexposing re-bars, metal lathe at areas that pcs have fallen off.rmdy:
Mar 4, 2019
Active - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35372854z issued on 01/20/2018, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01 test station for sprinkl
Mar 1, 2019
Active - Class - 1
C/u 59h10,67b10; (59,h,10)brake pad worn/defective replace and properly adjust.(67,b,10)in car phone not working.
Feb 13, 2019
Resolve - Class - 1
97x10; 97,x,10 upon inspection, device was found out-of-service.restore device to service immediately and contact nyc d.o.b for a complete inspection.
Feb 13, 2019
Resolve - Class - 2
52bb12; 52,bb,12 reshackle hoist ropes tag expired.
Feb 13, 2019
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35372854z issued on 11/20/18 and to file a certificate of correction pursuant to 28-201 and 1rcny 102-01.note:no document file for
Jan 11, 2019 · Penalty $6,250
Active - Class - 1
Failure to maintain building in a code compliant manner.observed on the top fl no pressure gauge installed on the inspector test station forthe automatic fire sprinkler system and in stairwell 4b a fire sprinkl
Nov 20, 2018
Active - Class - 1
Failure to maintain building in code compliant manner.observed on floor no pressure guage installed on the inspectors test station and also in stairwell 4b a fire sprinkler head painted.rem:repair and or replac
Aug 15, 2018
Resolve - Class - 2
Failure to maintain building in code compliant manner.observed in cellar two ball drips incorrectly installed at the fire department check valve.a previous violation #35325222z was issued on 03/30/18 for the sa
Aug 15, 2018
Resolve - Class - 2
Failure to maintain bldg in code compliant manner.no fire stopping perbc 712.3;27-345.noted:observed at cellar-gas meter room have pipes penetrating into adjacent rooms and areas,holes/openings in walls with no
Aug 15, 2018
Active - Class - 2
Failure to maintain building in code compliant manner.noted:observed throughout cellar,concrete ceiling has spalling concrete,missing concrete at various locations throughout cellar exposing re-enforcements ste
Aug 15, 2018
Active - Class - 2
Building occupied without a valid certificate of occupancy as per 28-118.3.1;28-118.3.2.noted:c of o #214644 states premise to be for laboratories,a morgue,an autopsy room,museum,sterilizing room,locker rooms n
Aug 15, 2018
Active - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control #812642.rem:submit required technical report.
May 18, 2018
Active - Class - 2
Failure to maintain building in code compliant manner.observed in cellar two ball drips installed incorrectly at the fd check valve.previoussummons #353111032 issued on 11/20/17 refers.rem:repair and/or replace
Mar 30, 2018
Resolve - Class - 2
Failure to maintain building in code compliant manner.observed on rooffuture gas connection and gas piping not painted to protect it from elements.photos taken.rem:repair and/or replace.
Mar 30, 2018
Resolve - Class - 2
Failure to maintain building in code compliant manner.observed at top of stairwell no pressure gauge installed on the inspection test valve and a five sprinkler head painted in stairwell 412.previous summons #3
Mar 30, 2018
Active - Class - 2
97##5 failure to maintain elevator respodent failed to allow mandatory annual/routine inspection by the dept or approved agency per 28-304.16.1 and appendix k of the building code. multiple attempts to gain
Feb 16, 2018
Active - Class - 2
Failure to maintain building in code-compliant manner. observed on 01/17/18 at the above address sprinkler heads throughout building are too close to the light fixtures, obstructing the spread of water. rem: re
Jan 17, 2018
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2025
- Floors
- 18
- Residential units
- 311
- Building area
- 260,640 ft²
- Lot area
- 51,874 ft²
- Zoning
- —
- Community board
- 301
- Council district
- 34
- Block / lot
- 2885 / 1
- Assessed value
- $3,667,500
- Landmark / historic district
- No
Questions about 125 Maspeth Avenue
Who owns 125 Maspeth Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Maspeth Park Housing Development Fund Co Rporation.
Does 125 Maspeth Avenue have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 125 Maspeth Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 125 Maspeth Avenue built?
City records list 2025 as the year it was built.
How many apartments are in 125 Maspeth Avenue?
It has 311 residential units and 313 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.