570 Grand Street
Brooklyn, NY 11211BBL 3-02785-0029Map
Owner of record: Oswald Torres
570 Grand Street is a mixed residential and retail building built in 1920 in Brooklyn, 11211. It has 2 residential units across 3 floors. The owner of record is Oswald Torres. HPD has recorded 4 housing violations here, most recently on March 31, 2005. 4 of the 4 most recent violations are still open.
- HPD violations
- 4
- DOB violations
- 9
- ECB violations
- 21
- HPD complaints
- 14
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- BHazardous
Replace with new the missing 5 balusters at handrail/banister at public hall, 2nd story
Mar 31, 2005
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color fire retarding ceilings and walls from 1st to 3rd sty at public hall
Mar 31, 2005
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sagging wood floor at public hall, 2nd story
Mar 31, 2005
Open — Nov sent out - BHazardous
Properly secure the loose 8 baluster at handrail/banister at public hall, 2nd story
Mar 31, 2005
Open — Nov sent out
DOB building violations · 9
- Immediate emergency anythingoptional
1)remove damage sidewalk shed 2)install approximately 40lf of sidewalk shed along lorimer street
Aug 19, 2024
Dob violation - dismissed - Construction other optional
Structuring rendered non compliant damage observed to side walk shed to have been caused by vehicle impact causing sidewalk shed to collaps ed completely
Aug 18, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 22, 2023
Dob violation - active - Immediate emergency anythingoptional
Install approximately 20 linear feet of sidewalkshed along the lorimer sideof premises. the section of sidewalk shed shall be centered below this 2ndstory window located at center span of the three story portion of the building
Jul 18, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Emergency none
Egncy-emergency none
Sep 28, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active
ECB violations · 21
- Class - 2
Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 39519343x., file a certificate of correction
Sep 16, 2025 · Penalty $6,250
Active - Class - 2
Temporary construction equipment on site-expired. noted; sidewalk shedinstall under job #b00908501 issued on 08-15-2023 has expired on 08-15-2024. remedy: renew permit.
Aug 18, 2024
Resolve - Class - 1
Noted : observed brick wall over the sidewalk of lorimer street side has several cracks and is bulging below the second floor.
Jul 17, 2023 · Penalty $1,250
Active - Class - 2
Failure to comply w/ the comm's order to file a cert. of correction w/the dob.respondent failed to comply w/ the comm's order to correct th e violating conditions and to file a cert of correction pursuant to 28
Dec 22, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to maintain building wall & appurtenances. note: brick wall over the sidewalk of lorimer st has several cracks & is bulging below the 2nd fl & between the 2nd & 3rd fls. remedy: repair exterior building
Oct 2, 2010 · Penalty $10,000
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances.note:brick wall over the sidewalk of lorimer st has cracked & is bulging below the 2nd flr window.a vertical crack through the brickwork of said wall was also obs
Aug 7, 2010 · Penalty $10,000
Resolve - Class - 1
Failure to maintain bldg wall or appurtenances. noted: brick wall overlorimer st (#2 facade) has cracked below 2nd fl window & between 2nd &3rd fl windows. the wall is also bulging from 2nd to 3rd fl. rem: repa
Feb 6, 2010 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg exterior wall. defect noted: at exp 2 brick wall bulging throughout wall, crack in brick above 2nd sty window through 3rd sty window. remedy: provide dob engineers report ensuring
Sep 25, 2009 · Penalty $5,000
Active - Hazardous
Failure to maintain building east elevation exterior bldg wall is out of plumb and bulging b/w 2nd & 3rd flr windows. also, numerous vertical cracks. remedy: repair wall and obtain engineers report.
Jul 20, 2007 · Penalty $2,500
Active - Hazardous
Failure to maintain exterior bldg. wall at 1st flr level on lorimer stside. concrete laminate 1" thick is pulling away from wall at top 12 feet high from sidewalk is 5" away from bldg. (separated from bldg) rem
Mar 31, 2006 · Penalty $10,000
Resolve
Show 11 more ↓
- Hazardous
Failure to maintain exterior bldg. wall. defects noted 1) at 1st flr level on lorimer st. side, concrete laminate ~1" thick is pulling away from wall, at top ~5" away from bldg. also concrete has cracks & missi
Nov 30, 2005 · Penalty $2,500
Resolve - Hazardous
Failure to maintain building.note.vertical and horizontal cracks in first floor bathroom approx.1/4"wide at various locations.also second floor wood joists over"hair salon"are rotten and sagging.remedy:obtain a
Jun 24, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain bldg:interior.defect noted:wood flr joists broken,cracked,shifted,sagging.noted locations:(1)cellar pipe east in ceiling adjacent plumbing 4"waste(2)1st flr ceiling east at 4" waste pipe w/e
May 9, 2005 · Penalty $2,500
Resolve - Non-hazardous
Work w/o a permit.work noted:a structural steel i beam column approx. 10'widex18'ht is erected from cellar slab to 2nd flr wood flr joists.noted locations:(1)cellar flr to ceiling east(2)1st flr to 2nd flr jois
May 9, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior bldg wall.defect noted:facade w/cracked open, broken masonry exterior wall.locations:(1)east facade 2fl to roofthru out.(2)north facade 2fl to roof thru out.remedy:repair defect for
May 9, 2005 · Penalty $2,500
Resolve - Hazardous
Plumbing work w/o a permit. in the cellar found a full bathroom consisting of a toilet, wash basin, and shower stall. remedy: obtain a permit if feasible or restore to prior legal condition
May 5, 2005 · Penalty $1,000
Resolve - Hazardous
Failure to maintain bldg. hazardous-defect noted:screw jack on 2nd floor holding up 3rd wooden floor joist. hallway walls & ceilings are caving into stairway.horozontal and vertical separations thru-out interio
Apr 11, 2005 · Penalty $2,500
Resolve - Non-hazardous
Work w/o permit. work noted:erected structural iron/stell beam from cellar thru ground to ceiling/underside of second floor. enclosed steel beam with sheetrock enclosure at ground floor. remedy:obtain permit or
Apr 11, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior building wall.note:at east side of building are vertical and horizontal cracks at various locations approx 1/2" wide from grade to third story.remedy:maintain exterior building wall
Mar 1, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior building wall note vertical and horizontal cracks approx 1/2'wide at various locations from grade to third story at east side of bldg remedy:maintain exterior bldg walls forthwith
Jan 28, 2005 · Penalty $2,500
Resolve - Non-hazardous
24a,24b,31a,18b,422 install stach cleanout door at base of chimney.
Aug 8, 1990 · Penalty $375
Active
Complaints
- Plumbing
Steam pipe/riser
Jun 26, 2020 · Apt 121203
Close - Plumbing
Water supply
Apr 6, 2015 · Apt 2
Close - Heat/hot water
Entire building
Dec 2, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2014 · Apt BLDG
Close - General
Doors
Mar 31, 2005 · Apt NA
Close - Construction
Collapsing building
Mar 31, 2005 · Apt NA
Close - Paint/plaster
Wall
Mar 31, 2005 · Apt NA
Close - General
Floor
Mar 31, 2005 · Apt NA
Close - Plumbing
Water-leaks
Mar 14, 2005 · Apt GROUN
Close
Show 4 more ↓
- Plumbing
Water-leaks
Mar 3, 2005 · Apt GROUN
Close - Electric
Electric-supply
Mar 3, 2005 · Apt GROUN
Close - Construction
Roof
Mar 1, 2005 · Apt BLDG
Close - Plumbing
Water-leaks
Mar 1, 2005 · Apt GROUN
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 2,961 ft²
- Lot area
- 1,850 ft²
- Zoning
- R7A
- Community board
- 301
- Council district
- 34
- Block / lot
- 2785 / 29
- Assessed value
- $731,250
- Landmark / historic district
- No
Questions about 570 Grand Street
Who owns 570 Grand Street?
The owner of record in NYC Department of City Planning PLUTO data is Oswald Torres.
Does 570 Grand Street have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 570 Grand Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 570 Grand Street built?
City records list 1920 as the year it was built.
How many apartments are in 570 Grand Street?
It has 2 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.