322 Graham Avenue
Brooklyn, NY 11211BBL 3-02771-0007Map
Owner of record: Graham Assets LLC
322 Graham Avenue is an elevator apartment building built in 2020 in Brooklyn, 11211. It has 10 residential units across 6 floors. The owner of record is Graham Assets LLC. HPD has recorded 12 housing violations here, most recently on August 29, 2024.
- HPD violations
- 12
- DOB violations
- 6
- ECB violations
- 42
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from east located at apt 1a, 1st story, 1st apartment from west at north
Aug 29, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from west at north
Aug 29, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Aug 29, 2024 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Aug 29, 2024
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 29, 2024
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Aug 29, 2024 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 29, 2024
Closed — Violation dismissed
Show 2 more ↓
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 29, 2024
Closed — Violation dismissed
DOB building violations · 6
- Construction other optional
Brough commissioner has ordered all work stopped under application #321908539 on 10/15/2021 due to construction superintendent withdrawal.
Oct 15, 2021
Dob violation - dismissed - Construction other optional
Brough commissioner has ordered all work stopped under application #321908539 on 10/15/2021 due to construction superintendent withdrawal.
Oct 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 14, 2021
Dob violation - dismissed - Construction other optional
Emergency work. oberved free standing cmu masonry walls at exposures #1,2,3 and 4. approx 20.0'tall. remedy: nys professional engineer to oversee all immed temporary bracing of masonry walls. complete bracing of exp 2 free standing wall by 2/11/2021. and all r/w by 2/12/2021. eng'r to submit daily s/s progress reports to ceu
Feb 11, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 23, 2020
Dob violation - dismissed
ECB violations · 42
- Class - 2
Failure to maintain adequate housekeeping per section requirements; noted: observed construction debris scattered/stored on the interior floor area/exterior at various location throughout the site., maintain ad
Sep 19, 2022
Resolve - Class - 2
At the time of inspection 6 stories nb i observed top of parapet wall not installed yet. architect drawing mentioned to use coping alum or stone that may cause damage for roof neighbors. stop all work on roof l
Aug 22, 2022
Resolve - Class - 1
At the time of inspection i observed, there was no guardrails at 6th floor double heighted space, at exp#1, which was a immediate hazards at ongoing construction site, additionally there was no fall protection
Jun 17, 2022
Resolve - Class - 2
Bc3314.1 unsafe supported scaffold.note:at the time of inspection of apurposed 6 story new bldg construction.i observed supported pipe scaffold in place at exp.#1.i also observed the netting was not secured to
Feb 1, 2022
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39049804x issued 10/21 21 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.remedy:comply with commissioner's o
Dec 6, 2021
Resolve - Class - 1
Bc3307.2.3 temporary public walkway w/the site.at time of inspection of 6 story nb,observed sidewalk shed & construction fence installed atexp.#1 on the public sidewalk where observed that the sidewalk shed wa
Nov 22, 2021
Resolve - Class - 2
Job site fence not constructed,or maintained pursuant to subsection.attime of inspection of 6 story nb,observed construction fence installedat exp.#1 & not maintained as per code.construction fence is covered w
Nov 22, 2021
Resolve - Class - 2
Bc3314.4 supported pipe scaffold not installed maintained as per code.at time of inspection of 6 story nb observed supported pipe scaffold installed at exp.#1 not as per code supported pipe scaffold has a loos
Nov 22, 2021
Resolve - Class - 1
Observed one male worker on scaffold at exposure 1, 5th floor, doing scaffolding work contrary to full stop work order #3817329, comply with stop work order; comply with stop work order
Oct 21, 2021
Resolve - Class - 1
Bc3309.2 lic to enter adj property note:atoi of proposed 6stynb@roof level,i observed worker doing same work on rooftop of adj property@exp2,upon request for lic to enter&do such work&materials storage on such
Oct 12, 2021
Resolve
Show 32 more ↓
- Class - 1
Bc3308.5 vert safety netting systems note:atoi of proposed 6stynb@rooflevel,active jobsite,i observed vert netting system provided along bldg proximeter on bldg leading edges.i observed also that netting isnt p
Oct 12, 2021
Resolve - Class - 1
Bc3307.4.7 work or storage zone note:atoi of proposed 6stynb@roof level,active jobsite.i observed debris dumpster on st@exp1 adj to pedestrian sws.i observed also that work&storage zone not adequately provided
Oct 12, 2021
Resolve - Class - 1
3307.4.7 work or storage zones.note:atoi of 6stynb currently@roof level no work in progress.i observed mechanical equipment on st@exp1 storage zones.respondent failed to provide solid barrier on ground to enclo
Jun 21, 2021 · Penalty $625
Resolve - Class - 2
Failure to post permit for work@premises (dot) note:atoi of 6stynb currently@roof level no active work.i observed respondent occupied st@exp1&store mechanical equipment w/o post permit from dot to occupied shee
Jun 21, 2021
Resolve - Class - 2
Failure of permit holder to provide inspection access to and/ or expose ongoing construction or work on an active and permitted worksite. observed one male worker on site at front entry door. upon arrival male
Jun 3, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp const.noted:atoi@active jobsite,observed(a)no guardrails on 2of3 accessible steel stairs from cellar to 1stlevel(b)missing/inadequate guardrails/n
May 12, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons&property noted:atoi on active const site,@roof level observed material being unloaded from truck to add to already overloaded roof.observed 3pallets of masonry cement(each bag a
May 12, 2021 · Penalty $10,000
Resolve - Class - 1
Work doesnt conform to approved const docs.noted:atoi@active jobsite,observed(a)box header beams cjoists to cmu connections missing screws for every gauge plate(b)tabs for light gauge fl joists to light gauge s
May 12, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3301.7 failure to provide approved pe const docs noted:atoi@6stybldgactive jobsite,observed steel staircase erected from cellar level to 5fl level.upon request of steel staircase details from competent person
May 12, 2021
Resolve - Class - 2
Failure to safeguard all persons&property affected by const operationsno overhead protection.stop all work on exp4 provide overhead protection for adjacent bldg@exp4-note:@time of my insp of proposed 6stynb und
Apr 27, 2021
Resolve - Class - 1
Unqualified workers performing work on scf stop all work on supported scf all exps note:@time of my insp of 6stynb under const,active jobsite.i observed personnel using supported scf on 5fl upon request to view
Apr 27, 2021
Resolve - Class - 1
Bc2113.6.1 chimney protection responsibility of owner of taller bldg.note:@time of my insp of proposed 6stynb under const,active jobsite i observed on exp4 chimney isnt past ht of nb.offset of such chimney is t
Apr 27, 2021
Resolve - Class - 1
Bc3307.6.5.8 periodic insps:6mths following initial installation insp&every 6mths thereafter,sws shall be inspected by qualified person designated by designer stop all use of supported scf@exp1-note:@time of my
Apr 27, 2021
Resolve - Class - 1
Bc3314.1 scfs used in conjunction w/const of bldg shall be erected&maintained so safety of public&personnel wont be endangered by falling material tool or debris.stop all use of supported scf w/i perimeter of b
Apr 27, 2021
Resolve - Class - 1
Bc3309.10 protection whenever any bldg being const roof of adjoining bldg.it shall be duty of person causing const work to protect equipmentfrom damage.stop all work on exp2 provide protection for all equipment
Apr 27, 2021
Resolve - Class - 1
Preshift safety meeting log (content) note:@time of my insp@6sty nb active jobsite currently@5sty upon request to see preshift safety meeting log the one provided was inadequate didnt mention task specific&prec
Apr 7, 2021 · Penalty $5,000
Resolve - Class - 1
2113.1.6.1 responsibility of owner of taller building. note:at time ofmy inspection at new 6 story bldg active jobsite currently at 5 story i observed that chimney of adjacent property at expo#4 was not extende
Apr 7, 2021 · Penalty $2,530
Resolve - Class - 1
Const super failed to perform duties as per code.following conditions observed&swo issued on this date@this jobsite.(1)no design drawing fortemp working platform.(2)chimney of adjacent property not extended or
Apr 7, 2021
Resolve - Class - 1
Bc3301.6 failure to provide design drawing note:atoi@6stynb active jobsite i observed working platform covering stairs@5sty upon request to see design drawing for temp working platform none was provided.design
Apr 7, 2021 · Penalty $2,500
Resolve - Class - 1
Housekeeping note:@time of insp@6stynb active jobsite currently@5sty iobserved inadequate housekeeping consisting of const debris&materials scattered thruout jobsite&rearyd causing potential trip&fall hazard re
Apr 7, 2021 · Penalty $625
Resolve - Class - 1
Bc3303.9 elements to be maintained in existing bldgs (egress) note@time of my insp@6stynb active jobsite currently@5sty i observed permanentstair opening@5sty covered w/plywood&scf on top obstructing egress.onl
Apr 7, 2021
Resolve - Class - 2
Contrary to plan.at the time of inspection i observed 6 story bldg active construction site.upon review building height above 6 story iline of horizontal netting building.building should be enclosed 10th suppor
Mar 16, 2021
Resolve - Class - 2
3301.6 design drawing for temporary bracing.at the time of inspection i observed missing dimensions and spacing of rakers also no details for connection from support to wall or connection to floor temporary bra
Mar 16, 2021
Resolve - Class - 1
Sec. 2104.6 failure to provide masonry cmu block wall construction bracing,accordance w/tms 602/ac 1530.1/asce 6 sec. 3-3e. as noted: at time of inspection on an active contruction site,6 sty new bldg. i observ
Feb 9, 2021
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order as noted at the time of reinspection for violation #35538587k for falure to implement cold weather provision for masonry owner mortar and
Jan 14, 2021 · Penalty $5,000
Resolve - Class - 1
Bc 2104.3 failure to implement cold weather provision for masonry and mortar. as noted:at time of inspection on an active job site cmu blockplacement of load bearing walls on the perimeter at exposure 2 and 4 o
Dec 30, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. attime of inspection at a 6 sty nb,i observed on the working/active site1st thu 4th fl material & debris all over the floors,blocking egress &
Sep 24, 2020 · Penalty $625
Resolve - Class - 1
Sec. 28-104.2.2 failure to provide approved plans/documents at the time of inspection. at the time of inspection at a 6 sty nb,i observed workers working on the 1st thu 4th fl delivery,cmu block,framing & movin
Sep 24, 2020
Resolve - Class - 1
Work does not conform to approved construction documents &/or amendments-street operations exp#1(site safety plan). at the time oof inspection at a 6 sty nb,i observed on the street level a delivery in progress
Sep 24, 2020 · Penalty $2,500
Resolve - Class - 1
Sec. 3309.1 protection required(adjoining property/neighboring bldg)exp#2. at the time of inspection at a 6 sty nb,i observed at the ground level & 4th fl no overhead protection on neighboring property exp#2
Sep 24, 2020
Resolve - Class - 2
Work w/o permits-expired permit construction fence erected w/permit #b00090971 expired on 11/12/19 w/o renewing on file.rem: obtain all required permits.
Nov 16, 2019
Resolve - Class - 1
Failure to provide required notification prior to the commencement of demolition. at time of inspection of the demolition sign off. locationi observed the 2 sty bldg demolition already completed backfilled and
Apr 16, 2019 · Penalty $2,500
Resolve
Complaints
- Water leak
Heavy flow
Aug 19, 2024 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Aug 31, 2023 · Apt B
Close - Unsanitary condition
Garbage/recycling storage
Aug 29, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2020
- Floors
- 6
- Residential units
- 10
- Building area
- 14,260 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6A
- Community board
- 301
- Council district
- 34
- Block / lot
- 2771 / 7
- Assessed value
- $1,605,600
- Landmark / historic district
- No
HPD registration #391251, last renewed Jul 23, 2025.
Questions about 322 Graham Avenue
Who owns 322 Graham Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Graham Assets LLC.
Does 322 Graham Avenue have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 322 Graham Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 322 Graham Avenue built?
City records list 2020 as the year it was built.
How many apartments are in 322 Graham Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.