444 Graham Avenue

Brooklyn, NY 11211BBL 3-02735-0004Map

Owner of record: 444 Graham Ave., LLC

444 Graham Avenue is an elevator apartment building built in 2020 in Brooklyn, 11211. It has 57 residential units across 7 floors. The owner of record is 444 Graham Ave., LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
37
ECB violations
112
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 37

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 24, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 27, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 18, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - dismissed
Show 27 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 17, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 17, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 9, 2020

    Dob violation - dismissed
  • Construction other optional

    Borough comm. has stopped all work under permit#310081639/stop all wor k and make site safe contact office at 718 802-3685

    Jun 22, 2019

    Dob violation - dismissed
  • Construction other optional

    Stop all work except to make site safe contact office at 718 802-3685

    Jun 22, 2019

    Dob violation - dismissed
  • Construction other optional

    Stop all work at site/stop all work except to make site safe, contact the borough comm. forwith to resolve this matter

    Dec 27, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 25, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 2, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 21, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 13, 2016

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 14, 2013

    Dob violation - dismissed
  • Zoning none

    Z-zoning none

    Jul 30, 2009

    Dob violation - dismissed
  • Construction other optional

    Comply with the borough commissioner's order to stop work,contact the dob before resuming work

    Jul 29, 2009

    Dob violation - dismissed
  • Construction other optional

    Inadequate details approved plans for sequence of partial demolition o f interior masonry, structural steel, of location steel colums removed in new tower area, shoring required and sequence of column removal/ne w column installation, equipment use, included limitations and safegua remedy: stop all work. amend plans. include details of existing

    Jul 13, 2009

    Dob violation - active
  • Construction other optional

    Failure to maintain masonry wall at exposure 4 (right of graham ave. e ntrance) at interior approx. 70-80 ft. from storefront. approx. 1/2" vertical crack running floor to ceiling. noted demo work in progress under nb permit #310081639 remedy: maintain structure. provide pe report of structural integrit

    Jul 13, 2009

    Dob violation - active
  • Construction other optional

    Inadequate details on approved plans for foundation and structural ste el work. no demo/rebuild sequencing of existing structure, or support of existing structure design remedy: stop all work forthwith. all plans to sep ex for engineering review. sep ex 212-442-1698

    Jun 11, 2009

    Dob violation - active

ECB violations · 112

  • Class - 2

    Observed on floors from cellar to the seven floor installed a sprinkler system. ninety percent of the work completed no permits, obtain all permits

    Aug 16, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    New building; active site and permit cp present upon inspection noted work contrary to approved construction documents, noted sws erected missing cross brassing and extra bay . stop all work on sws / allowed t

    Aug 11, 2023 · Penalty $625

    Resolve
  • Class - 2

    New building, active site and permit , cp present upon request for sws periodic inspection letter none was provided / stop using sws / allowed only housekeeping on sws

    Aug 11, 2023

    Resolve
  • Class - 2

    Temporary construction equipment on site-expired permit.as noted:at time of inspection on active construction site observed at exp #1 #4 in place sidewalk shed & sws permit expired 1/5/23 permit b00501325-l1-sh

    Mar 29, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Weatherproof integrity of adjoining buildings: at time of responding complaint observed: gc failure to provide protection for adjoining occupied building observed expansion joint wide-open no weatherproof expo#

    Mar 17, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    A worker was in an area that had a caz sign high up, but was not barricaded off to prevent access. the worker was not instructed to remove material prior to working near the window, so he wouldn't have to lean

    Jan 31, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    An active jobsite with supported scaffold material stored in front of a window, were a worker placed a ladder to caulk the window. the area was not cleared or free from material to allow the work to work safely

    Jan 31, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    At the time of my inspection of a 7 story building i observed chimney on adjacent property roof at exp#2 on 6 story balcony level. failure to extend chimney to allow exhaust to flow create an unsafe condition.

    Oct 25, 2022

    Resolve
  • Class - 1

    At the time of my inspection responding to the incident were worker wilson sarmiento fell from the a ladder inspection reveal than ladder were installed not on the flat surface which contrary to specifications

    Oct 25, 2022

    Resolve
  • Class - 1

    At the time of my inspection responding to the incident where worker wilson sarmiento fell from the ladder i observed active construction site. upon request site safety training card for willson sarmiento none

    Oct 25, 2022 · Penalty $625

    Resolve
Show 40 more ↓
  • Class - 1

    At the time of my inspection responding to the incident where worker wilson sarmiento fell from the ladder i observed active construction site. upon request of site specific orientation record performed on work

    Oct 25, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Active construction site, approved plans do not show/ indicate a supported scaffold at exp#4 on the courtyard, approximately 42 feet of supported scaffold is erected to do the facade work moreover pins are miss

    Oct 24, 2022

    Resolve
  • Class - 2

    Active construction site, work on the facade, and cmu works in progress the contractor's sheds and offices not conforming to bc 3303.16, three connected sheds ( gc shed, electric contractor shed & plumbing cont

    Oct 24, 2022

    Resolve
  • Class - 2

    Active construction site, work on the facade, and cmu works in progress when asked for periodic inspection (3307.6.5.8) letter for sws and scaffold none was made available by competent person at the siteprovide

    Oct 24, 2022

    Resolve
  • Class - 2

    Active construction site, work on the facade, and cmu work in progress at exp#2 also observed supported scaffold on top of the sidewalk shed, when asked for load imposed letter (bc 3314.3.4), none was made avai

    Oct 24, 2022

    Resolve
  • Class - 1

    Aat the time of my inspection proposed 7story new building construction in progress observed supported scaffolds at all exposures with following violation conditions: 1. not fully plank platforms 2. missing toe

    Aug 2, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    I observed active construction site and at exp. #4 there were no overhead protection on top of roof. roof have chairs and table on top. failure to provide overhead protection creates a hazardous condition for p

    Jul 18, 2022 · Penalty $625

    Resolve
  • Class - 1

    Work without permit. at time of inspection supported scaffold installed at exposure #1 with no permits on file., obtain permit

    Jul 17, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Bc10905.6.3.2 failure to remove strength testing cylinder store for period up to 48hrs.as noted:atoi on active const site,7stynb up to fl6.strength test cylinder molded on11/11/21 by s&s concrete&soil testing l

    Jun 1, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain/display onsite docs required by bcch33.as noted:atoi on active const site i observed@exp1(graham ave),fl6,on deck concrete slab was placed&steel panel staircase in place to fl5.observed fros

    May 4, 2022

    Resolve
  • Class - 2

    Temp const equipment expired permit atoi in response to complaint observed sws installed@exp1-444graham exp2-172richardson&exp3-173frostst.rev of dept records indicated sws permit expired10/14/21&hasnt been ren

    Dec 18, 2021 · Penalty $625

    Resolve
  • Class - 1

    Work doesnt conform to approved const docs or approved amendments.atoiof 7styb observed@elevator shaft was platform upon request to rev design drawing for elevator shaft platform the platform doesnt conform to

    Sep 28, 2021 · Penalty $625

    Resolve
  • Class - 1

    Bc3301.6 failure to provide approved design drawing for temp equipment.atoi of 7stynb observed@staircase shaft there was makeshift platform@level4 upon request to rev approved design drawing to verify loads&saf

    Sep 28, 2021 · Penalty $625

    Resolve
  • Class - 1

    Bc3309.2 lic to enter adj property atoi of 7styb observed@roof level exp2 work being done on roof platform observed slab platform has cantilevel on afj property rou@50grahamave-bk&there was roof protection on a

    Sep 28, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Erected or installed supported scaffold 40' or higher w/o permit. note:at the time of my inspection at 7 story new building observed supported scaffold approx 52'high. upon request work permit for supported sca

    Sep 21, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3307.4.7 work or storage zone note:atoi of proposed 7stynb,active jobsite w/formwork of 5sty roof being prepared,i observed that delivery&storage area@exp1 adj to pedestrian sws isnt adequately provided by so

    Aug 25, 2021 · Penalty $250

    Resolve
  • Class - 1

    Bc3303.11 stairs during const or demo note:atoi of proposed 7stynb@formwork of 5sty roof level active jobsite,bldg above 50'ht from grnd level.i observed theres no permanent stairs provided for bldg for distanc

    Aug 25, 2021 · Penalty $625

    Resolve
  • Class - 1

    Bc3305151-all concrete washout water shall be contained in premanufactured watertight containers-stop all concrete operations provided watertight washout boxes.do not place washout boxes near damage basins.note

    Aug 4, 2021 · Penalty $625

    Resolve
  • Class - 1

    Work without permit/expired permit.stop all work on entire site provided valid permit.note:at the time of my inspectin of a proposed 7 storybuilding new under construction,active job site building framing the 5

    Aug 4, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to comply with manufactures specifications stop all all use ofstorage area,amend ssp reflect barricades under construction,an activejob site i observed at the building expo#1 plastic barricades no fille

    Aug 4, 2021 · Penalty $625

    Resolve
  • Class - 1

    Storage zone where storage related to the construction of a building is occuring adjacent to a sidewalk shed area must be closed in to protect pedestrians from construction activities and materials-stop all use

    Aug 4, 2021 · Penalty $625

    Resolve
  • Class - 1

    Work does not conform to approved construction documents amend sidewalk shed drawing to reflect whats on the site.note:at the time of my inspection of a proposed 7 story new building under construction,an activ

    Aug 4, 2021 · Penalty $625

    Resolve
  • Class - 1

    Unsafe storage of combustible material&equipment.atoi@7stynb under const i observed const activity in progress.@exp3 i observed 5'x8' storagerm where 4cylinders combustible flammable materials.const debris,bric

    May 28, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide approved/accepted const docs atoi noted:@time of myinsp of new7stybldg,const in progress@grndfl level,approx14workers onsite preparing 1fl pour decking,i asked to rev approved structural draw

    May 28, 2021 · Penalty $312

    Resolve
  • Class - 2

    Bc3309.14 protection of windows.noted:@time of my insp of new7stybldg,const in progress@grndfl level,i observed@rear of adjoining property@exp4 has rear window facing directly into site approx10' above grndfl,4

    May 28, 2021

    Resolve
  • Class - 2

    Bc3301.13.1 inadequate site safety plans.atoi@7stynb under const i observed const in progress 1fl structural work.upon rev site safety plans,i observed plans were inadequate.site safety plans have missing found

    May 28, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to institute safety measures atoi on nb active jobsite observed left&right side of adjacent property.jobsite of 173frostst no safetymeasures was in place to protect adjacent property on right side&left

    May 10, 2021 · Penalty $625

    Resolve
  • Class - 1

    Overhead protection @time of my insp nb active jobsite observed reba operation taking place observed no overhead protection was provided foradjacent property@expo2,3,4.creating unsafe condition.stop all work 10

    May 10, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Pedestrian protection doesn't meet code specs atoi on nb bldg active jobsite observed jobsite fence&sws erected@173 (illegible) st.safety netting from fence to sws creating unsafe condition for material&tools t

    May 10, 2021 · Penalty $2,400

    Resolve
  • Class - 1

    Permit holder failed to ensure workers rec site safety orientation atoi of nb active jobsite observed workers doing reba operation upon request for site safety orientation for workers 3workers didnt have orient

    May 10, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Manufactor specification. note: at the time of my inspection of a 7 sty new bldg,i observed yodock system was not filled or installed as permfg specification this creates a hazardous condition for vehicle traff

    Dec 22, 2020 · Penalty $625

    Resolve
  • Class - 1

    Sec. 3307.4 warning signs,personel & barriers. note: at the time of myinspection of a 7 sty new bldg foundation phase,i observed a cat excavator on street not fully container or enclosed,i also observed yodock

    Dec 22, 2020 · Penalty $625

    Resolve
  • Class - 1

    Sec. 3307.2.1 obstruction of sidewalk or street. at the time of inspection of an active jobsite observed concrete operation inprogress at exp#1 & when i asked for concrete washout operation permit(dot permit)th

    Oct 6, 2020 · Penalty $625

    Resolve
  • Class - 2

    Failure to perform proper concrete washout water procedures. at the time of inspection of an active jobsite observed,workers were performingconcrete work & at exp#1 of the street observed there was no concrete

    Oct 6, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Work contrary to construction documents note at the tiem of inspection observed an actiev jobsite at foundation/excavation level also observed as per soe plan area about 25x100 area at exposure 2 included at co

    Sep 4, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping. note: at time of inspectionof a 7 sty nb active jobsite i observed large amounts of combustible debris scattered throughout jobsite. large amounts of debris creates a

    Mar 27, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc 3301.2 failure to maintain(rebar cap)note:at time of my inspection of a proposed 7 story n.b. at excavation level where concrete operation is ongoing i observed at expo#4 by the foundation wall the rebar not

    Mar 9, 2020 · Penalty $2,530

    Resolve
  • Class - 2

    Failure to provide flag men.note:at time of my inspection of a proposed 7 story n.b at excavation level i observed at expo#4 by frost streeta concrete truck pouring concrete on the ground in preparation lift qu

    Mar 9, 2020 · Penalty $2,430

    Resolve
  • Class - 1

    Work does not conform to approved construction documents. at time of inspection of a 7 sty nb currently at excavation stage i observed work does not conform to approved plans provided on site: missing steel rak

    Oct 16, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Work w/o a permit. (construction plywood fence permit expired). as noted: at time of inspection construction site was closed. observed con struction plywood fence permit has expired on 05/11/18 permit #3100816

    May 17, 2018

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2020
Floors
7
Residential units
57
Building area
44,619 ft²
Lot area
19,752 ft²
Zoning
R6B
Community board
301
Council district
34
Block / lot
2735 / 4
Assessed value
$6,795,900
Landmark / historic district
No

Questions about 444 Graham Avenue

Who owns 444 Graham Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 444 Graham Ave., LLC.

Does 444 Graham Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 444 Graham Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 444 Graham Avenue built?

City records list 2020 as the year it was built.

How many apartments are in 444 Graham Avenue?

It has 57 residential units and 58 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.