72 North Henry Street
Brooklyn, NY 11222BBL 3-02729-0020Map
Owner of record: 72 N Henry LLC
72 North Henry Street is an elevator apartment building built in 1920 in Brooklyn, 11222. It has 10 residential units across 5 floors. The owner of record is 72 N Henry LLC. HPD has recorded 19 housing violations here, most recently on June 13, 2025. 2 of the 19 most recent violations are still open.
- HPD violations
- 19
- DOB violations
- 14
- ECB violations
- 11
- HPD complaints
- 8
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east
Jun 28, 2024 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north located at apt 2b, 2nd story, 1st apartment from north at east
Jun 28, 2024 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Jun 28, 2024 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Jun 28, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 12, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective rubber gasket for refrigerator doors in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Apr 27, 2022 · Apt 2B
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 2b, 2nd story, 1st apartment from north at east
Apr 27, 2022 · Apt 2B
Closed — Violation closed
Show 9 more ↓
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 27, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing at public hall, 1st story
Apr 27, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 27, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 27, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Apr 27, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 27, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system that is missing at public hall, 1st story
Apr 27, 2022
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2020
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 11
- Class - 1
Cu7z17,99bb5,98m7,32e2,68b7. 7a17-zone lock altered so car door can be opened at all times, repair and contact dob elevator for reinspection; 99bb5-expired cat 1 test. perform and file test with dob; 98m7-rope
Mar 6, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to provide 3ft 6in guardrail or solid enclosure around open & accessible sides of excavation observed 8ft deep excavation w/ no guardrail on any other form of protection.rem:provide protection
May 20, 2015 · Penalty $1,600
Resolve - Class - 2
Bc3303.2.4 failure to provide the required temporary or permanent sanitary facility during construction operation.@ the time of inspection construction was in progress & there were no sanitary facility @ the jo
May 20, 2015
Resolve - Class - 2
Failure to provide approved/accepted plans @ the time of inspection.support of excavation (soe) plans are inadequate & do not show details of the existing site conditions @ all exposures.stop work order issued
May 20, 2015 · Penalty $250
Resolve - Class - 1
Failure to provide protection @ the sides of excavation.observe site being excavated @ a depth of approx 8ft w/ vertical shear (alt) & therewas no support of excavation.rem:backhill excavation to make site safe
May 20, 2015 · Penalty $2,400
Resolve - Class - 2
Failure to provide an adequate construction fence.jobsite fence does not have the required view panels.rem:provide view panels
May 20, 2015
Resolve - Class - 2
Bc3309.6 failure to monitor adjoining structures for movement in all direction during excavated related activity that may adversely affect adjoining structures.excavation was in progress & there was no monitori
May 20, 2015
Resolve - Class - 2
Failure to safeguard public and property noted: demolition work in progress under application no. 320919556-alt-1 and bricks along left exposure are falling into adj. rear yard w/o roof protection 18'high pipe
Feb 12, 2015 · Penalty $1,200
Resolve - Class - 2
Failure to provide aproved plans at site noted: demolition work in progress under application no.320919556-alt1 and approved plans were not available for inspection.approved plans were brought to site apprx 30-
Feb 12, 2015 · Penalty $250
Resolve - Class - 2
Work contrary to approved plans noted: demoliton work in progress under application no. 320919556-alt1 and observed demolition of brick wallapprx 4'x35' along right exp (ex4) contrary to approved plans which in
Feb 12, 2015 · Penalty $500
Resolve
Show 1 more ↓
- Class - 2
27-misc;28-misc. misc violation-no fd permit noted: demolition work inprogress under application no 320919556-alt1 and observed use of acetylene oxygen torch w/o a permit issued by ny fire department.rmdy:stop
Feb 12, 2015 · Penalty $800
Resolve
Complaints
- General
Bell/buzzer/intercom
Jun 10, 2024 · Apt 2B
Close - Paint/plaster
Ceiling
Jun 10, 2024 · Apt 2B
Close - Unsanitary condition
Mold
Jun 10, 2024 · Apt 2B
Close - Flooring/stairs
Floor
Jun 10, 2024 · Apt 2B
Close - General
Ventilation system
Jun 10, 2024 · Apt 2B
Close - Unsanitary condition
Mold
Jun 3, 2024 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Sep 22, 2022 · Apt BLDG
Close - Appliance
Refrigerator
Apr 20, 2022 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D5)
- Year built
- 1920
- Floors
- 5
- Residential units
- 10
- Building area
- 7,499 ft²
- Lot area
- 2,600 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 33
- Block / lot
- 2729 / 20
- Assessed value
- $1,070,100
- Landmark / historic district
- No
HPD registration #387164, last renewed Aug 8, 2025.
Questions about 72 North Henry Street
Who owns 72 North Henry Street?
The owner of record in NYC Department of City Planning PLUTO data is 72 N Henry LLC.
Does 72 North Henry Street have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 72 North Henry Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 72 North Henry Street built?
City records list 1920 as the year it was built.
How many apartments are in 72 North Henry Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.