121 Meserole Avenue
Brooklyn, NY 11222BBL 3-02597-0034Map
Owner of record: T-Seventeen, LLC
121 Meserole Avenue is a mixed residential and retail building built in 2022 in Brooklyn, 11222. It has 2 residential units across 4 floors. The owner of record is T-Seventeen, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 5
- ECB violations
- 34
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed
ECB violations · 34
- Class - 2
At time of inspection of a 4 str nb- permit not yet signed, cs still on permit- observed active construction operations, with at least 1 worker on site. upon knocking numerous times no access was granted, and u
Jun 20, 2024 · Penalty $1,250
Resolve - Class - 2
Active jobsite-4 story nb, observed inadequate roof/skylights protection at exp #2,4.skylights protection not build as per plan,missing debris nettings in full height around entire perimeter and planks.roof pro
Feb 14, 2023
Resolve - Class - 1
At time of my inspection on a active 4 story nb jobsite,i ask cs to provide sws plans,records of pre shift meatings and drawings for elevator shaft platform,none was provided / availablecomply with code
Feb 14, 2023
Resolve - Class - 2
At time of inspection on an active 4 story nb jobsite i observed fire extinguishers on site not maintained to code. inspection tags blank or missing monthly inspection on numerous fire extinguishers. maintain/i
Feb 14, 2023
Resolve - Class - 2
At time of inspection on an active 4 story nb jobsite when asking the c.s. to provide the following required on site documents none could be provided - supported scaffold and sws design drawings, letter of impo
Nov 22, 2022
Resolve - Class - 2
At time of inspection on an active 4 story nb jobsite when asking the c.s. to provide the structural steel design drawings - none could be provided. stop all structural work.provide all structural drawings.
Nov 22, 2022
Resolve - Class - 1
Bc2104.6 failure to provide masonry cmu block wall construction bracing accordance with tms 602/aci 530.1)asce 6 section 3.3e.as noted:at time of inspection at active construction site observed cmu block masonr
Mar 1, 2022 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction documents.as noted:at time of inspection of active construction site observed steel beams supporting first floor slab on metal deck.request for most up-to-date app
Mar 1, 2022
Resolve - Class - 1
Bc3314.1 unsafe supported scf atoi of 4styb observed workers performing masonry work on supported scf.supported scf was missing guardrail system netting,fully decked,failure to maintain supported scf creates un
Feb 28, 2022 · Penalty $2,500
Resolve - Class - 2
Sec. bc 3301.6 no design drawing for temporary platform. at the time of inspection,construction site was active. i observed,performing work on temporary platform & construction material was stored on temporary
Feb 9, 2022
Resolve
Show 24 more ↓
- Class - 1
Sec. bc 3301.2 failure to maintain adequate means of egress at the time of inspection,this was active construction site performing cmu work onsite. i observed,there was no means of egress from cellar to 1st fl.
Feb 9, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. atthe time of inspection,this was active construction site-performing cmu work onsite. i observed,slipping & tripping hazards all over the job
Feb 9, 2022
Resolve - Class - 2
Sec. bc 3301.2 failure to institute/maintain safety equipment measures/uncapped rebar. at the time of inspection,this was active construction site. i observed,uncapped rebar was all around construction site and
Feb 9, 2022
Resolve - Class - 2
Sec. bc 3307.2 failure to comply w/dot regulations/stipulations. at the time of inspection,construction site active & performing cmu work onsite. i observed unsafe storage on roadway,material storage was top of
Feb 9, 2022
Resolve - Class - 1
Sec. bc 3301.5 unsafe conditions & equipment. at the time of inspections,this was active construction site. i observed,worker performing work on unsafe temporary platform w/o taking safety meaures around the
Feb 9, 2022 · Penalty $625
Resolve - Class - 2
Construction superintendent failed to perform duties per code. at the time of inspection this was active construction site. i observed,multiple violating condition on site including no egress,unsafe condiitions
Feb 9, 2022 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to ensure workers received site safety orientation. at the time of inspection,this was active jobsite,performing cmu work. there was more than 7 workers was on site. upon request the compet
Feb 9, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard all persons&property affected by const ops note:atoi against complaint to nb jobsite.noted crack&soil of adjoining property failure due to const&excavation of 121meseroleave could create un
Sep 22, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3303.4.7 failure to maintain storage near sidewalk,walkways,&pathways as per code bc3303.4.7.note:atoi against complaint to nb jobsite w/work in progress.noted they stored materials adj to sidewalk pulled hig
Sep 22, 2021 · Penalty $625
Resolve - Class - 1
Bc3305.3.1.2.1 use of existing structures to support vert or lateral load@exp4 note:atoi against complaint to nb jobsite w/work in progress.noted rebar placed for true foundation work@exp4 not placed any type o
Sep 22, 2021 · Penalty $625
Resolve - Class - 2
Failure to provide approved/ accepted construction documents at jobsite a time of inspection. observed 6 male worker on site prepping and installing rebar for foundation slab. however inadequate fo plans on sit
Jul 7, 2021
Resolve - Class - 2
Bc3307.4 warning sign,personnel & barriers.at time of inspection of a 4 story new bldg observed exposed steel rebars covered by tarp y another steel rebars on top of the tarp also observed some materials on str
Jun 26, 2021
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments.at time of inspection for emergency bracing at corner ofexposure 1 and 2,i observed the current bracing in place not conformin
Dec 23, 2020 · Penalty $625
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientationor refresher.at the time of inspection of an active new jobsite,observed workers were performing works without receiving site safety orienta
Dec 3, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to file evidence of compliance w/workers disability benefits at the time of inspection of an active jobsite observed.after doing further research on bis,determined that,the workmen's disability insuranc
Dec 3, 2020
Resolve - Class - 1
Bc330112-failure to comply with nyc fire code(general)no permit.at thetime of my inspectionon a permitted site.i observed on site at expo#4 site condition excavation phase a diesel operating welding generator a
Sep 24, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to notify dept prior to earthwork. at the time of inspection,iobserved proposed new 4 sty mixed use bldg w/work activity present. itwas also observed contractor failed to notify dept prior to the commen
Sep 18, 2020
Resolve - Class - 1
Sec. 3301.13.4 change of designation of construction superintendent. noted: at time of inspection of an active jobsite. upon request to see the construction superintendent logs observed the permit holder did
Aug 3, 2020 · Penalty $625
Resolve - Class - 2
At time of inspection,observed ongoing construction activities contrary to mayors emergency executive order 120 & subsequent order incorporating requirement at governors executive order 202.34 & subsequent orde
Aug 3, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to notify dept-prior to commencement of earthwork. note: @timeof my inspection of a 4 sty bldg @excavation stage no work in progressupon research of dob records i, discoverd that no notification was mad
Feb 29, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons & property affected by const operations. note: @time of my inspection of a 4 sty @excavation & pile drivingstage no work in progress. i, observed an entrance door @expo#2 of
Feb 29, 2020
Resolve - Class - 1
3309.14 window protection note: @time of my inspection of a 4 sty building of excavtion stage. no work in progress. i observed pile driving machines @jobsite there are windows from adjacent building @expo#2
Feb 29, 2020 · Penalty $2,500
Resolve - Class - 1
3309.1:failure to protect or adequately protect adjoining properties at the time of inspection it was observed that the repondent started to perform drilling operations without protection for adjoining properti
Oct 16, 2018 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection does not meet code specification. note at time of inspection i observed sidewalk shed at exp#1 w/o information panel on parapet. rmdy:comply with code.
Oct 13, 2016
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 2022
- Floors
- 4
- Residential units
- 2
- Building area
- 5,943 ft²
- Lot area
- 1,905 ft²
- Zoning
- C4-3A
- Community board
- 301
- Council district
- 33
- Block / lot
- 2597 / 34
- Assessed value
- $235,380
- Landmark / historic district
- No
Questions about 121 Meserole Avenue
Who owns 121 Meserole Avenue?
The owner of record in NYC Department of City Planning PLUTO data is T-Seventeen, LLC.
Does 121 Meserole Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 121 Meserole Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 121 Meserole Avenue built?
City records list 2022 as the year it was built.
How many apartments are in 121 Meserole Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.