807 Manhattan Avenue
Brooklyn, NY 11222BBL 3-02596-7501Map
Owner of record: Unavailable Owner
807 Manhattan Avenue is a condominium built in 1908 in Brooklyn, 11222. It has 27 residential units across 3 floors. The owner of record is Unavailable Owner. HPD has recorded 4 housing violations here, most recently on May 5, 2026.
- HPD violations
- 4
- DOB violations
- 26
- ECB violations
- 28
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing
Dec 24, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed
DOB building violations · 26
- Landmark none
Landmk-landmark none
Aug 27, 2026
Dob violation - active - Landmark none
Landmk-landmark none
Aug 27, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Landmark none
Landmk-landmark none
Nov 3, 2025
Dob violation - active - Landmark none
Landmk-landmark none
Jun 30, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 16 more ↓
- Landmark none
Landmk-landmark none
Feb 14, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 15, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 14, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Construction other optional
Boroughcommissioner's stop work order/stop all work except to make site safe
Jan 17, 2020
Dob violation - dismissed - Construction other optional
Borough commissioner's s.w.o./stop all work. except to make safe
Jan 17, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 12, 2018
Dob violation - resolved
ECB violations · 28
- Class - 2
Failure to comply w/approved doc atoi proposed 4fl lvl altb i observedsuspended scf erected outrigger over roof lvl existing setup on failednot comply w/approved cd5 scf frame setup not as per dd stop all use o
Feb 14, 2022 · Penalty $1,250
Resolve - Class - 2
3314.7.4 supported scaffold at the edge more than 1.5 times of the highest on roof lvl. at the time of inspection i observed supported scaffold on roof lvl highest was more than from the edge. so frame of suppo
Feb 14, 2022
Resolve - Class - 1
Bc3303.12.4. converting elevators:where existing elevator is converted from passinger or freight use the dept shall be notified certificate has expired.stop all use of elevator provide certificate.call cse for
Dec 1, 2021 · Penalty $625
Resolve - Class - 1
Failure to comply with manufacturers specifications-stop all use of storage areas on exp #1 #2 follow manufacturers specifications for plastic barricades.note:at time of inspection of 4 story building under alt
Dec 1, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain documents on site as required by chapter 33.stop all use of storage /zones at exp #1 #2.no design drawings on site for yodocks with chain link fence mounted on top of plastic barricades"yodo
Dec 1, 2021 · Penalty $625
Resolve - Class - 2
Sec. bc3314.10.11 securing suspended scaffold. noted: at time of my inspection of an alteration type 1,4 sty bldg,construction in progress bldg topped off,i observed a suspended scaffold on site at exp#2 which
Oct 8, 2021
Resolve - Class - 2
Failure to maintain/display on site documents required by chapter 33 -material hoist manu. specs. noted: at time of my inspection of an alteration type-1,4 sty bldg,construction in progress,bldg topped off,i ob
Oct 8, 2021
Resolve - Class - 2
Representation,business or advertising messages on protective structures. noted: at time of my inspection of an alteration type-1,4 sty bldgconstruction in progress,bldg topped off,i observed advertising signs
Oct 8, 2021
Resolve - Class - 1
Work does not conform to approved construction document and/or approved amendments-suspended scaffold does not conform to approved cds.at the time of inspection i observed a suspended scaffold at exp2 workers w
Jun 23, 2021 · Penalty $625
Resolve - Class - 1
Failure to maintain/display onsite documents required by chapter 33-noload imposed letter sealed and signed by registered professional for supported scaffold on sidewalk shed.at the time of inspection i observe
Jun 23, 2021 · Penalty $1,250
Resolve
Show 18 more ↓
- Class - 2
Work does not conform to approved construction document and or approved amendments noted at the time of my inspection of active 4 story alterationc construction jobsite i observed supported scaffold at exposure
Dec 7, 2020
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no toe boards/guardrail noted:at time of inspection,observation was made at exposure(1) inside construction site right behind co
Aug 26, 2020 · Penalty $2,500
Resolve - Class - 1
Sec. 3309.1 failure to protect chimney at adjacent(prop). note: at time of my inspection of a 4 sty bldg at 4 sty stage construction work inprogress. i observed construction work being done 3 sty above adjacent
Jul 23, 2020
Resolve - Class - 1
Sec. 2113.1.6.1 responsibility of owner of taller bldg. note: at time of my inspection of a 4 sty bldg at 4 sty stage construction work in progress i observed a bldg under construction being vertically enlarged
Jul 23, 2020
Resolve - Class - 2
Overhead protection at the time of inspection of an active jobsite,observed work in progress at exp#4.i also observed that there were no safety measure in place(overhead protection)at exp#4 ground level.for per
Jun 25, 2020
Resolve - Class - 2
Sec. 3314.1 failure to maintain pipe scaffold. note: at time of my inspection of a 4 sty bldg. at roof level under construction-i observed the pipe scaffold installed at exp#2 inside the job site was not mainta
Mar 21, 2020
Resolve - Class - 1
Noted at time of inspection that yadok barrier and material storage on street at exp 1 and 2 was not per ssp plan with barriers not fully enclosing material at exp 1 & 2 and fence missing at exposure 2., confor
Nov 15, 2019 · Penalty $2,500
Resolve - Class - 1
Noted a section of construction fence at exp 2 removed w/ cmu block work occurring on an active sidewalk. also dumpster exp 2 was 3 ft above barrier w/o cover or fence, open concrete bags on sidewalk, sharp de
Nov 15, 2019 · Penalty $2,400
Resolve - Class - 1
Permit holder failed to produce for inspection daily log that is required by bc 3321.2 item3, produce the daily log for inspection
Sep 3, 2019 · Penalty $2,500
Resolve - Class - 2
Sec. 3303.14 water accumalation/standing water. at time of inspection i observed proposed 4 sty vertical & horizontal enlaegement of existing bldg w/on going work activity present. i also observed the accumalat
May 7, 2019
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. attime of inspection i observed proposed 4 sty vertical & horizontal enlargement of existing bldg w/on going work activity present. i also obs
May 7, 2019
Resolve - Class - 1
Manufacturer specs/equipment use contrary to specs/misuse of equipment. at the time of my inspection,jobsite was active w/demolition work inprogress. i oberved 1 worker(contractor)at exp#3 standing on an"a"fram
Mar 5, 2019 · Penalty $6,250
Resolve - Class - 2
Superintendent-log book. at the time of my inspection of an active jobsite. competent person was present i requested to see his log book. which was presented to me in digital format bearing inadequate informati
Mar 5, 2019
Resolve - Class - 2
View panels dence(failure to provide). at the time of my inspection ofan active jobdsite. i observed construction fence at exp#3&4 was erected 8'high & over 25'in length at both exposures. contractor failed to
Mar 5, 2019
Resolve - Class - 2
Sec. 3301.9.1 failed to provide project information panel. at the timeof my inspection on an active jobsite. i observed contractor failed toprovide the project information panel on the construction fence at exp
Mar 5, 2019
Resolve - Class - 1
Sec. 3309.11 protection of trees(failre to provide). at the time of myinspection on an active jobsite. i observed at exp#3 the sws was installed. the trees at the same location were not protected as per code.
Mar 5, 2019 · Penalty $625
Resolve - Class - 2
B201,50. welmclain cast iron, low pressure steam heating boiler,modellgb9 input 1,040,000 btu/hz,gas fired,2016 e; 50-referenced commercialboiler was installed at the palce of occurrence ad put in operation
May 8, 2017 · Penalty $800
Resolve - Class - 2
28-317.3 failure to register cooling tower. rmdy: comply w/code.
Sep 21, 2015 · Penalty $4,000
Active
Complaints
- Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1908
- Floors
- 3
- Residential units
- 27
- Building area
- 57,406 ft²
- Lot area
- 18,125 ft²
- Zoning
- C4-3A
- Community board
- 301
- Council district
- 33
- Block / lot
- 2596 / 7501
- Assessed value
- $5,750,275
- Landmark / historic district
- No
HPD registration #390388, last renewed Sep 13, 2025.
Questions about 807 Manhattan Avenue
Who owns 807 Manhattan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 807 Manhattan Avenue have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 807 Manhattan Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 807 Manhattan Avenue built?
City records list 1908 as the year it was built.
How many apartments are in 807 Manhattan Avenue?
It has 27 residential units and 29 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.