239 Banker Street
Brooklyn, NY 11222BBL 3-02593-0001Map
Owner of record: Workable 239 LLC
239 Banker Street is an elevator apartment building built in 1915 in Brooklyn, 11222. It has 69 residential units across 4 floors. The owner of record is Workable 239 LLC. HPD has recorded 7 housing violations here, most recently on September 8, 2016.
- HPD violations
- 7
- DOB violations
- 113
- ECB violations
- 82
- HPD complaints
- 34
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the debri at public hall stairs, 1st story, section ''east''
Sep 8, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk. at public hall, 1st story
Sep 8, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 8, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 8, 2016
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailboxes at public hall, 1st story
Sep 8, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 8, 2016
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Sep 8, 2016
Closed — Violation closed
DOB building violations · 113
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 3, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2018 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2018 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 external hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2019 internal hgh pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 12, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 2020
Dob violation - resolved - High pressure boiler boiler required
Violation issued - failure to file 2017 external high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
Cease use
Mar 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - resolved - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2016
Dob violation - resolved - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2015
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 17, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed
ECB violations · 82
- Class - 2
Ecb nov issued for failure to maintain. atoi observed inconsistant stair risers at stair a levels 1-5. bottom riser 5.5" top risers 10". handrail also not code compliant with inconsistant heights. 24" to 28" th
Feb 27, 2025 · Penalty $1,280
Resolve - Class - 2
At time of inspection observed at 1st floor dust on the floor and walls due to construction., maintain adequate construction housekeeping
Aug 24, 2023
Resolve - Class - 1
Construction document shall be complete and of sufficient clarity to indicate requirements for such application. at time of inspection observed ssp does not clearly indicated exits, and plan indicate constructi
Aug 24, 2023 · Penalty $625
Resolve - Class - 1
Failure to maintain building wall(s) and appurtenances. at tine of inspection observed concrete stucco at underside of masonry brick work has detached and fallen over main entry to building. also at 2nd level u
Mar 27, 2020 · Penalty $6,250
Resolve - Class - 1
At 4th floor,in hallway, leading to door for stairwell "a", furniture which includes, mattresses, cabinets, couch partially obstructs passageway to exit., remove obstruction
Feb 6, 2020 · Penalty $312
Resolve - Class - 1
Work without a permit.noted:in apt #4k full height partitions erected to create 2 bedrooms.rem:obtain permits.
Aug 29, 2019
Resolve - Class - 1
Bc1009.11/failure to provide handrail required as per bc1009.11;noted:at staircase from 2nd floor to 2nd floor.handrail loose to the wall.rem:provide handrail
Aug 29, 2019
Resolve - Class - 1
Bc907.2.8/failure to provide fire alarm system for transient use at apt - 4k.rem:discontinue ilelgal use.
Aug 29, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of number of means of egress for every places per bc1021.1 and 27-366 for transient use at apt-4k.rem:discontinue illegal use.
Aug 29, 2019 · Penalty $2,500
Resolve - Class - 1
Occupancy contrary that allowed by c of o #60564;illeged occupancy noted:at apt#4k at 4th flr has been using at transient use having 4 guestfor short term stay less 30 days w/o host permanent tenant/owner.rem:d
Aug 29, 2019 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 3
Failure to maintain building in a code compliant manner. noted; apt. 1g rear right bedroom, having defective water leak through to rail/header of window, dripping to sill below. remedy: repair and/or replace
Dec 21, 2018
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: on 4th fl at4 sty bldg in apt 4m observed on ceiling in kitchen/dining & corridor water damage & mold spot. remedy: repair roof &/or replace. remove mol
Mar 5, 2018
Resolve - Class - 2
Altered/changed building occupied without a valid certificate of occupancy. note: permit #302260871 obtain on 01/25/2011 to convert from mfg. ug 16-17 into transient hotel. ug5 plumbing and partitions work on f
Feb 28, 2018 · Penalty $500
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid c of o. altered/changed bldgunder alt 1 #302260871 floors used as dwelling of class'a' apts. alt 1application never signed off. remedy: obtain valid c of o.
Mar 3, 2015 · Penalty $1,250
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid cert of occupancy per 28-118.3.1&28-118.3.2.altered/changed bldg under alt.1 #302260871 on all 4 fls.used as dwelling of class"a"apts.rem:obtain valid c of o.
Oct 16, 2014 · Penalty $500
Resolve - Class - 1
97x10 only elevator in the bldg is out of service thereby creating conditions dangerous to human life as per ircny 11-2 restore to service.
Sep 19, 2014 · Penalty $500
Resolve - Class - 2
Failure to comply w/ comm's order to file a cert of correction w/ the dept of bldgs.dob records indicate that ecb #35034145y has no cert of correction submitted.rem:submit cert of correction.
May 29, 2014 · Penalty $800
Resolve - Class - 2
Public nuisance/failure to maintain steel structure on roof top n/w corner remains w/ tank removed,no longer being used for intended use.steel ladder from roof to top of structure.exsists w/ no safe area to go
May 29, 2014 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner.noted-parapet wall@ exposure 3 height from roof level is only @ 38".min height for parameter protection is 42".(bc 1509.8)bldg occupied now as a multi dwellin
May 29, 2014 · Penalty $500
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid c/o per 28-118.3.1-28-118.3.2. noted: altered/changed bldg under alt 1 #302260871 occupied on all 4 flrs as dwelling in class 'a' apts. remedy: obtain valid c/o and/or
Feb 1, 2014 · Penalty $500
Resolve - Class - 2
Occupancy contrary to that allowed by bldg dept records. noted: job #302260871 to convert from manufacturing to j2 use & amended to convert to imo units was put on hold&then disapproved.premises is now occupied
Aug 12, 2013 · Penalty $5,000
Resolve - Class - 2
Occupancy contrary to that allowed by bldg dept records.noted:job#302260871 is to convert from jfg use to transient hotel.schedule'a'shows proposed use as j2 on flrs 1 thru 4.observed cl'a'occupancy on all flrs
Jan 3, 2013 · Penalty $3,000
Resolve - Class - 1
Plumbing work w/out permit in manufacturing district for resdiential use. noted: installation of water, waste, gas lines to create kitchens & 3-pc bathrooms for cl 'a' apts inspected units,1d,1a,2n,2p,3k,3j,4f.
Jan 3, 2013
Resolve - Class - 2
Construction or alteration work w/o permit in manufacturing district for residential use.noted: installation of partition walls to create class'a'apts on all floors.inspected units - 1d,1a,2n,2p,3k,3j,4f.rmdy
Jan 3, 2013 · Penalty $3,750
Resolve - Class - 2
Illegal use in a manufacturing district. noted:observed residential occupancy on all floors - units 1d,1a,2n,2p,3k,3j,4f.premises situated in m1-1 district.rmdy: conform to zoning resolution.
Jan 3, 2013 · Penalty $2,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. note:at time of inspection at first flr level 4 workers on site installing sheetrock partition walls (taping)working on window opening. in apt 1l
Sep 7, 2012 · Penalty $4,800
Resolve - Class - 3
Failure to maintain building in code compliant manner at south exterior 2nd flr air conditioner in window on danger of falling. also sidewalk protection for hole. not properly (fasted)( ) trip harzard.
Sep 2, 2012 · Penalty $250
Resolve - Class - 2
28-118.3:altered building occupied w/o a valid cert of occupancy. noted:observed conversion & occupancy to residential use in class "a" aptson all flrs alt 1 #302260871 to convert from mfg use to transient hote
Jul 24, 2012 · Penalty $2,500
Resolve - Class - 3
97x17;file for removal or restore to service.
Jun 12, 2012 · Penalty $200
Resolve - Class - 2
02x10,98m07,59h11,05i10,42n09,08v01: 02x;alarm bell inoperative. 98m;no 5yr tag. 5911;worn brake pads. 42h;fuses on controller by passed.
Jun 12, 2012 · Penalty $500
Resolve - Class - 1
Altered building occupied w/o a valid c of o. job #302260871 not signed off & no new c of o issued to converting from mfg use (group) 16-17 into a transient hotel use (group) 5. at time of inspection apt #2a,20
May 25, 2012 · Penalty $1,000
Resolve - Class - 2
Failure to comply w/ the comms order to file a cert of correction w/ the dob.noted:no cert of correction has been filed for nov#34796890z issued 9/24/09.rem:file a cert of correction.
Apr 6, 2012 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by c/o noted: c/o #60564 indicated legal use of building is that of factory flrs 1-4,illegally occupied (partially) as class'a' apts 2,3,4th flrs as on going construction
Sep 24, 2009 · Penalty $12,500
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: on going & unsafe construction operations w/i building under appl #302260871 against swo's exposing illegal tenants to haz
Sep 24, 2009 · Penalty $12,500
Resolve - Class - 1
Failure to have new or altered plumbing system tested observe on 1-4 flrs altered sprinklers system. no sp permit issued on d.o.b. file no test,inspections performed. sprinkler system not active (under construc
Sep 24, 2009 · Penalty $2,500
Resolve - Class - 1
Work w/o permit. observed on 1-4 flrs altered sprinkler system. no sp permit issued on d.o.b. file,no test,inspections performed. sprinkler system der construction) riser valves closed. not installed sprinkler
Sep 24, 2009 · Penalty $8,000
Resolve - Class - 1
Failure to have new or altered plumbing system,tested. observe on 1st flr installed 71 meter bars & gas risers(1-4 lfrs) more than 20 meters already installed. as per d.o.b. file plumbing inspections,tests done
Sep 24, 2009 · Penalty $2,500
Resolve - Class - 1
Work w/o permit observe on 1st flr installed 71 meter bars & gas riser(1-4 flrs) more than 20 meters already installed. as per d.o.b. file plumbing inspections tests done by plumber self sept incorrectly alread
Sep 24, 2009 · Penalty $4,000
Resolve - Class - 2
Altered/changed building occupied without a valid certificate of occupancy. note: percentage of work done with appl.#302260871 to convert b uilding into transient hotel with building occupied throughout prior
Aug 10, 2009 · Penalty $1,250
Resolve - Class - 2
Work without a permit; expired permit stop work order #051509c0101aa still in effect with worker observed installing sheetrock partition wa lls at 2nd floor: apt2f and 3rd floor apt 3f at 12:00pm while work per
Aug 10, 2009 · Penalty $4,000
Resolve - Class - 2
Sidewalk shed does not meet bldgs code specification! defects noted: sidewalk shed erected under application #310113828-01-eq-sh exp 2.13.09found w/default wires and yellow extensions cable attached to electric
May 15, 2009 · Penalty $5,000
Resolve - Class - 2
Work w/expired permit! illegal work noted: bldg found w/sidewalk shed erected under application #310113828-01-eq-sh exp 02-13-09 at approx 115 & l.f. as temporary heavy duty sidewalk shed for remedial purpose
May 15, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to provide approved/accepted plans at job site. at time of inspection! construction site found w/construction work under application#302260871-01-al exp 10.20.08. where male worker, w/work in progress
May 15, 2009 · Penalty $2,500
Resolve - Class - 2
Failure to provide/post sign on shed pursuant to subsection. no contractor's sign was observed on the sidewalk shed at this location. remedyprovide contractor's sign.
Jul 12, 2008 · Penalty $4,000
Resolve - Class - 2
Sidewalk shed does not meet code specifications. the lights provided under the shed at this location are not connected to any power source. remedy: conform shed to code specifications.
Jul 12, 2008 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior bldg wall. note: @ the front facade a verticle opening of apprx 1 1/2" was observed extending from the cellar level to the cornice. other cracks & missing mortar were also observed
Feb 9, 2008 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior hazardous vertical and horizontal cracks thru out brick work 1-4th flrs on banker st facade remedy: repair brick work maintain bldg
Dec 18, 2007 · Penalty $10,000
Resolve - Hazardous
Failure to maintain exterior facade along banker st(west elevation)approx 1"(1 inch)wide open vertical step cracks from base to cornice at mid bldg also at southwest corner.remedy:provide immediate protection
Sep 18, 2007 · Penalty $10,000
Resolve - Hazardous
Failure to maintain.vertical & horizontal cracks.throughout brick work 1-4fl nabker st facade unchanged from last vio issued.remedy:maintainbldg wall
Aug 14, 2007 · Penalty $10,000
Resolve - Hazardous
Failure to maintain ext bldg wall.note:large vertical & horizontal cracks in brick work on banker st facade:fls 1-4.remedy:install sidewalk shed & make repairs asap
Apr 20, 2007 · Penalty $10,000
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 3, 2016 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 3, 2016 · Apt BLDG
Close - Electric
No lighting
Jul 17, 2015 · Apt 4A
Close - Electric
Power outage
Jul 15, 2015 · Apt 4A
Close - Plumbing
Water supply
Jun 29, 2015 · Apt 1H
Close - Plumbing
Water supply
Jun 27, 2015 · Apt 1H
Close - Heating
Heat related
Feb 5, 2014 · Apt 1A
Close - Heating
Heat related
Oct 18, 2012 · Apt 4B
Close - Appliance
Electric/gas range
Sep 4, 2012 · Apt 2H
Close - General
Mold
Sep 14, 2009 · Apt 2K
Close
Show 24 more ↓
- Nonconst
Vermin
Sep 14, 2009 · Apt 2K
Close - General
Stairs
Sep 14, 2009 · Apt 2K
Close - General
Floor
Sep 14, 2009 · Apt 2K
Close - General
Doors
Aug 25, 2009 · Apt BLDG
Close - General
Fire-escape
Aug 25, 2009 · Apt BLDG
Close - Electric
Electric-supply
Aug 21, 2009 · Apt 4J
Close - Plumbing
Basin/sink
Aug 21, 2009 · Apt 4J
Close - Plumbing
Basin/sink
Aug 21, 2009 · Apt 4J
Close - Appliance
Electric/gas range
Aug 21, 2009 · Apt 4J
Close - Appliance
Refrigerator
Aug 21, 2009 · Apt 4J
Close - Plumbing
Shower-stall
Aug 21, 2009 · Apt 4J
Close - Plumbing
Water supply
Mar 8, 2004 · Apt 4FL
Close - Heating
Heat related
Jan 18, 2004 · Apt 4D
Close - Heating
Heat related
Jan 11, 2004 · Apt 4D
Close - Heating
Heat related
Dec 8, 2003 · Apt 4D
Close - Heating
Heat related
Dec 7, 2003 · Apt 4C
Close - Heating
Heat related
Dec 7, 2003 · Apt 4D
Close - Heating
Heat related
Dec 6, 2003 · Apt 4D
Close - Plumbing
Water supply
Jun 13, 2003 · Apt 4A
Close - Plumbing
Water supply
Jun 11, 2003 · Apt 4
Close - Plumbing
Water supply
Jun 11, 2003 · Apt 4
Close - Plumbing
Water supply
May 26, 2003 · Apt 4LOFT
Close - Plumbing
Water supply
May 26, 2003 · Apt 4LOFT
Close - Plumbing
Water supply
May 26, 2003 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D5)
- Year built
- 1915
- Floors
- 4
- Residential units
- 69
- Building area
- 63,100 ft²
- Lot area
- 17,500 ft²
- Zoning
- M1-1
- Community board
- 301
- Council district
- 33
- Block / lot
- 2593 / 1
- Assessed value
- $4,904,100
- Landmark / historic district
- No
HPD registration #391850, last renewed Jan 26, 2026.
Questions about 239 Banker Street
Who owns 239 Banker Street?
The owner of record in NYC Department of City Planning PLUTO data is Workable 239 LLC.
Does 239 Banker Street have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 239 Banker Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 239 Banker Street built?
City records list 1915 as the year it was built.
How many apartments are in 239 Banker Street?
It has 69 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.