roofy

157 Calyer Street

Brooklyn, NY 11222BBL 3-02569-0052Map

Owner of record: Cel-Con Realty, LLC

157 Calyer Street is a walk-up apartment building built in 1868 in Brooklyn, 11222. It has 9 residential units across 3 floors. The owner of record is Cel-Con Realty, LLC. HPD has recorded 61 housing violations here, most recently on May 24, 2002. 49 of the 50 most recent violations are still open.

HPD violations
61
DOB violations
13
ECB violations
0
HPD complaints
2

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 24, 2002

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 61

  • B

    Provide 3 extra sprinkler heads and suitable wrench for emergency purposes at o.s.y. valve of sprinkler in accordance with the rules and regulations of this department .. at cellar

    May 24, 2002

    Open — Nov sent out
  • B

    Seal in open position the o.s.y. valve of the sprinkler system in accordance with the rules and regulations of this department in meter room at cellar

    May 24, 2002

    Open — Nov sent out
  • A

    D26-10.01 adm code properly repair with similar material the broken or defective tile wall bathroom 2 sty pub hall.

    May 5, 1999

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department west wall 1 sty public hall

    May 5, 1999

    Open — Nov sent out
  • B

    D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard.

    May 5, 1999

    Open — Nov sent out
  • A

    D26-31.09 adm code provide under completed permit, water closet, washbasin, bathtub or shower for each 6 persons or remainder thereof for single room occupancy apts. at 3 sty public hall.

    May 5, 1999

    Open — Nov sent out
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration door & partition 1 sty public hall.

    May 5, 1999

    Open — Nov sent out
  • A

    D26-41.15 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    May 5, 1999

    Open — Nov sent out
  • A

    D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.

    May 5, 1999

    Closed — Violation closed
  • B

    D26-10.01 adm code properly repair with similar material the broken or defective eroded mortar joint all treads fron stoop.

    May 5, 1999

    Open — Nov sent out
Show 40 more ↓
  • C

    Provide hot water at all hot water fixtures kitchen and bathroom 1 sty apt 1 , section '' ''

    Aug 27, 1998 · Apt 1

    Open — Violation will be reinspected
  • C

    Remove or cover in a manner approved by the department the peeling lead paint ceiling southeastroom 3 sty apt 3fl hamad 349 1971 er1 97038370 located at apt 3fl

    Aug 27, 1998 · Apt 3FL

    Open — Violation will be reinspected
  • B

    Repair the leaky and/or defective faucets washbasin bathroom 3 sty apt 3fl located at apt 3fl

    Aug 27, 1998 · Apt 3FL

    Open — Violation will be reinspected
  • B

    M/d law abate the nuisance consisting of exposed electric wiring at ceiling bathroom 3 sty apt 3fl located at apt 3fl

    Aug 27, 1998 · Apt 3FL

    Open — Violation will be reinspected
  • B

    M/d law abate the nuisance consisting of exposed electrical wiring at southeast room ceiling 3 sty apt 3fl located at apt 3fl

    Aug 27, 1998 · Apt 3FL

    Open — Violation will be reinspected
  • B

    Replace with new the broken or defective and or painted sprinkler heads 3 sty rooming unit at front

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Abate the nuisance consisting of vermin roaches at basement sty public hall

    Aug 27, 1998

    Open — Violation will be reinspected
  • A

    Properly repair with similar material the broken or defective cement plastered ceiling around scuttle at roof

    Aug 27, 1998

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the stair landings and floors all sty public hall

    Aug 27, 1998

    Open — Nov sent out
  • C

    Remove the illegal fastening double cylinder key operated lock at entrance door to basement sty

    Aug 27, 1998

    Open — Violation will be reinspected
  • A

    Replace with new the missing balusters at 2 sty stairway and public hall

    Aug 27, 1998

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of electric extension wire from public hall light fixture to 2 sty rear room

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Properly repair the broken or defective light fixture 2 sty community bathroom

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Properly repair with similar material the broken or defective plaster walls and ceilings at all stys public halls

    Aug 27, 1998

    Open — Violation will be reinspected
  • A

    Paint with light colored paint to the satisfaction of this department ceilings and walls all stys public hall

    Aug 27, 1998

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets shower stall 2 sty community bathroom

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the 2 sty community bathroom

    Aug 27, 1998

    Open — Violation will be reinspected
  • C

    Properly repair with similar material the broken or defective cement plastered west wall 2 sty public hall er1

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Replace with new the broken or defective lower sash window and glass 2 sty public hall

    Aug 27, 1998

    Open — Violation will be reinspected
  • A

    Remove the torn and/or loose floor covering 3 sty public hall

    Aug 27, 1998

    Open — Nov sent out
  • B

    Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition b room eliminated doors removed at public hall now converted to class a apt

    Aug 27, 1998

    Open — Violation will be reinspected
  • C

    Properly repair with similar material the broken or defective metal tile ceiling south room 3 sty rooming unit front

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Repair the roof so that it will not leak over 3 sty rooming unit at front

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    M/d law abate the nuisance consisting of exposed electric wires ceiling 3 sty north room at 3 sty rooming unit front

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Replace with new the missing light fixture ceiling at north room 3 sty rooming unit front

    Aug 27, 1998

    Open — Violation will be reinspected
  • B

    Properly repair the broken or defective wood floor kitchen at 3 sty rooming unit front

    Aug 27, 1998

    Open — Violation will be reinspected
  • A

    Provide ventilation for water closet compartment and/or bathroom and file application for approval before doing work 3 sty rooming unit at front

    Aug 27, 1998

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all stories through out walls and ceiling public hall

    Aug 4, 1998

    Open — Nov sent out
  • B

    Properly repair the broken or defective fence gate door front yard

    Aug 4, 1998

    Open — Violation will be reinspected
  • B

    M/d law abate the nuisance consisting of open cock loft 4 sty public hall to roof

    Aug 4, 1998

    Open — Violation will be reinspected
  • B

    Replace with new the broken or defective lower window sash 3 sty public hall

    Aug 4, 1998

    Open — Violation will be reinspected
  • B

    Remove all encumbrances consisting of all stories public hall house items and building material

    Aug 4, 1998

    Open — Violation will be reinspected
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar through out

    Aug 4, 1998

    Open — Violation will be reinspected
  • C

    M/d law abate the nuisance consisting of no electricity thru out 1 sty b room 1.

    Nov 25, 1997

    Open — Violation will be reinspected
  • C

    Provide hot water at all hot water fixtures kitchen and bathroom 1 sty apt 1 er1. located at apt 1

    Nov 25, 1997 · Apt 1

    Open — Violation will be reinspected
  • B

    Section '' ''

    Nov 1, 1997 · Apt 1

    Open — Violation will be reinspected
  • C

    Provide hot water at all hot water fixtures 1 sty apt 1 kitchen and bathroom. located at apt 1

    Oct 30, 1997 · Apt 1

    Open — Violation will be reinspected
  • C

    Replace with new the missing 3 window glass lite missing 2 sty front apt 2. , section '' ''

    Oct 30, 1997 · Apt 2

    Open — Violation will be reinspected
  • C

    M/d law abate the nuisance consisting of concealed water leak at ceiling kitchen 1 sty apt 1 er1. located at apt 1

    Sep 8, 1997 · Apt 1

    Open — Violation will be reinspected
  • B

    Properly repair with similar material the broken or defective metal ceiling at kitchen 1 sty apt 1. located at apt 1

    Sep 8, 1997 · Apt 1

    Open — Violation will be reinspected

DOB building violations · 13

  • Landmark none

    Landmk-landmark none

    Aug 15, 2006

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Aug 15, 2006

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Aug 15, 2006

    Dob violation - active
  • Landmark none

    Landmk-landmark none

    Aug 15, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
Show 3 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Appliance

    Sprinker cert

    Jul 26, 2004

    Close
  • Plumbing

    Water supply

    Jun 30, 2003 · Apt .

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1868
Floors
3
Residential units
9
Building area
5,079 ft²
Lot area
2,500 ft²
Zoning
R6B
Community board
301
Council district
33
Block / lot
2569 / 52
Assessed value
$1,314,900
Landmark / historic district
Greenpoint Historic District

HPD registration #342799, last renewed Oct 7, 2025.

Questions about 157 Calyer Street

Who owns 157 Calyer Street?

The owner of record in NYC Department of City Planning PLUTO data is Cel-Con Realty, LLC.

Does 157 Calyer Street have violations?

Yes. NYC HPD has recorded 61 housing violations at this property.

Is 157 Calyer Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 157 Calyer Street built?

City records list 1868 as the year it was built.

How many apartments are in 157 Calyer Street?

It has 9 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.