79 Greenpoint Avenue
Brooklyn, NY 11222BBL 3-02558-0080Map
Owner of record: 79 Greenpoint Avenue LLC
79 Greenpoint Avenue is a mixed residential and retail building built in 1884 in Brooklyn, 11222. It has 6 residential units across 4 floors. The owner of record is 79 Greenpoint Avenue LLC. HPD has recorded 45 housing violations here, most recently on May 4, 2026. 37 of the 45 most recent violations are still open.
- HPD violations
- 45
- DOB violations
- 26
- ECB violations
- 0
- HPD complaints
- 0
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 45
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 23, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Apr 27, 2019
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required, light fixture present
Feb 11, 2016
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Apr 29, 2014
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Apr 28, 2014
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective plaster ceiling at public hall, 4th story
Jan 7, 2003
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak .. at public hall, 4th story
Jan 7, 2003
Open — Nov sent out
Show 35 more ↓
- CImmediately hazardous
Replace with new the missing glass bottom sash window in the 5th room from north located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - CImmediately hazardous
Replace with new the missing glass bottom sash window in the 2nd room from north located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - BHazardous
Properly repair the broken or defective spring balance bottom sash window in the 2nd room from north located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective battom rail at bottom sash window in the bathroom located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - BHazardous
Properly repair the broken or defective door bells located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the 2nd room from north located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak 2nd room north and in the 5th room from north located at apt 4-r, 4th story, apartment at east
Jan 7, 2003 · Apt 4-R
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the landings and stairs all stys. public hall
Jan 7, 2003
Open — Nov sent out - BHazardous
Replace with new the missing sash chains of the windows in the kitchen located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - ANon-hazardous
M/d law abate the nuisance consisting of evidence of a concealed water leak from the ceiling in the north room located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wasteline of the wash basin in the bathroom located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls in the bathroom located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the walls and ceiling in the bathroom located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Properly repair the broken or defective window sashes throughout in the entire apartment located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Replace with new the missing glass pane of the window in the bathroom located at apt 4-r, 4th story
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing mr. smith in the private hallway located at apt 4-r, 4th story, apartment at south
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Properly repair the broken or defective mortise lock on the north door in the entrance located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over in the entire apartment located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the south room located at apt 4-r, 4th story, apartment at north
Sep 28, 2001 · Apt 4-R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceilings at the 3rd and at public hall, 4th story
Sep 28, 2001
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of discarded dresser, etc. at public hall, 2nd story
Sep 28, 2001
Open — Nov sent out - BHazardous
Properly repair the broken or defective bell / buzzer system. in the entire apartment located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls. in the entire apartment located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
Replace with new the missing light switch, north wall in the living room located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of exposed electric wires, ceiling. in the living room located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
Replace with new the missing ceiling light fixture. in the living room located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass, upper sash, west window. in the 1st bedroom from north located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout, ceramic tiles. walls. in the bathroom located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets shower-body, bathtub. in the bathroom located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of concealed water leak, ceiling, kitchen and in the bathroom located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing tenants, name ms. j. costello in the entire apartment located at apt 3-r, 3rd story
Jul 26, 2001 · Apt 3-R
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock entrance door 3 sty west apt 3r. , section '' ''
Dec 12, 1990 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed entrance door 3 sty east apt 3l. , section '' ''
Feb 28, 1990 · Apt 3L
Open — Nov sent out
DOB building violations · 26
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active
Show 16 more ↓
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Construction other optional
Borough commissioner has issued a 15-day letter of intent to revoke ap pl#301551960 on 06/24/09 unable to determine amount of work completed remedy; stop all work immediately, make site safe
Jul 7, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1884
- Floors
- 4
- Residential units
- 6
- Building area
- 7,000 ft²
- Lot area
- 2,375 ft²
- Zoning
- R6A
- Community board
- 301
- Council district
- 33
- Block / lot
- 2558 / 80
- Assessed value
- $1,756,800
- Landmark / historic district
- Greenpoint Historic District
HPD registration #311140, last renewed Aug 7, 2025.
Questions about 79 Greenpoint Avenue
Who owns 79 Greenpoint Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 79 Greenpoint Avenue LLC.
Does 79 Greenpoint Avenue have violations?
Yes. NYC HPD has recorded 45 housing violations at this property.
Is 79 Greenpoint Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 79 Greenpoint Avenue built?
City records list 1884 as the year it was built.
How many apartments are in 79 Greenpoint Avenue?
It has 6 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.