188 Green Street
Brooklyn, NY 11222BBL 3-02523-0016Map
Owner of record: Or 188 Green LLC
188 Green Street is a walk-up apartment building built in 1931 in Brooklyn, 11222. It has 6 residential units across 3 floors. The owner of record is Or 188 Green LLC. HPD has recorded 116 housing violations here, most recently on September 24, 2023. 1 of the 50 most recent violations are still open.
- HPD violations
- 116
- DOB violations
- 13
- ECB violations
- 11
- HPD complaints
- 56
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 116
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
Apr 16, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .... at public hall, 1st story
Aug 29, 2019
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .... at public hall, 1st story
Aug 29, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 29, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 29, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 29, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 29, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 29, 2019
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration , the suspended ceiling acoustic tiles in the 2nd room from north located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Open — Defect letter issued - BHazardous
Properly secure the loose strike plate at door jamb at vestibule door at public hall, 1st story
May 20, 2019
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration , the suspended ceiling acoustic tiles in the 3rd room from north located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at ceiling riser pipe in the kitchen located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed - ANon-hazardous
Replace with new the missing escutcheon plate at ceiling riser pipe in the 1st room from north located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in shower stall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed - ANon-hazardous
Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also a heavy duty dead bolt at door in the entrance located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1r, 1st story, 1st apartment from south at west
May 20, 2019 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor at public hall, 1st story
Apr 10, 2019
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wiring at ceiling at cellar
Apr 10, 2019
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold items at cellar
Apr 10, 2019
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint fire escape at all stories at rear of the building at fire escape
Apr 10, 2019
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of metal lally column supporting fire escape balcony at rear of the building at fire escape
Apr 10, 2019
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing top rail at 2nd story balcony at rear of the building at fire escape
Apr 10, 2019
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing stringer at rear of the building at fire escape 1 story at fire escape
Apr 10, 2019
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance spring mechanism lower sash window in the kitchen located at apt 3l, 3rd story, 1st apartment from south at west
Mar 12, 2019 · Apt 3L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Mar 9, 2019
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyls tiles at floor at public hall, 1st story
Mar 9, 2019
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardand materials at ceiling at public hall, 3rd story
Mar 9, 2019
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at upper sash window in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 9, 2019
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entrance located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from east at south
Mar 9, 2019 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction materials yard
Mar 9, 2019
Closed — Violation closed
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active
Show 3 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active
ECB violations · 11
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 30000032621y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Dec 16, 2024 · Penalty $625
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35359333k issued on 04/10/19 & to file a cert of correction pursuant to 28-2011 & 1rcny 102-01(d)(2). an acceptiple certificate has not yet been fil
Apr 2, 2020 · Penalty $1,250
Resolve - Class - 2
Failure of permit holder to provide inspection access to and/or exposeoutgoing construction on work on an active and permitted work site. attime of inspection job#321990011 construction worker which doing facad
Oct 29, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to provide sidewalk shed information panel.3 story residentialalt at time of my inspection i observed no sidewalk shed information panel and jobsite signs.rem:comply with code
May 21, 2019 · Penalty $625
Resolve - Class - 1
Bc590.8.sidewalk shed electrical not to code speicification.at time ofinspection of a 3 story residential building i observed a sws on exposure 1 of building i also observed the electrical box open with exposed
May 21, 2019
Resolve - Class - 2
Fail to provide effective electrical continuity for metal raeways enclosures cable armor.lighting raceway not continuous throughout hallway.rem:provide effective electrical continuity.
Apr 10, 2019 · Penalty $1,200
Resolve - Class - 2
Failure to provide covers face plate lampholders luminaire canopy for electrical outlet.open splic boxes throughout basement.rem:comply withec code with ec code.
Apr 10, 2019 · Penalty $500
Resolve - Class - 1
Ec110-2-a/unsafe unsuitable unapproved electrical equipment devices apparatus appliances materials or wiring in use.defective electrical ground service clamp also defective and exposed wiring throughout basemen
Apr 10, 2019 · Penalty $1,600
Resolve - Class - 1
Electrical work without a permit.observed at 230pm(4)feeders from basement going to various apartments.no application on file for electricalwork.rem:obtain permit.
Apr 10, 2019 · Penalty $1,600
Resolve - Class - 1
Performing unlicensed plumbing work w/o a master plumber license.noted:mr. joe gina admitted to performing plumbing work to repair undergound wast whichsprung leak causing flooding in cellar.mr.gina is not a ma
Oct 24, 2011
Resolve
Show 1 more ↓
- Class - 2
Work w/o a permit.noted:repaired underground waste pipe due to leak that was flooding cellar. no permit obtained to perform work.work 100% complete.remedy:obtain permit.
Oct 24, 2011 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 11, 2024 · Apt BLDG
Close - General
Janitor/super
Dec 16, 2022 · Apt ENTIRE
Close - Unsanitary condition
Garbage/recycling storage
Dec 16, 2022 · Apt ENTIRE
Close - Unsanitary condition
Garbage/recycling storage
Apr 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2019 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Sep 3, 2019 · Apt 1R
Close - Heat/hot water
Entire building
Aug 30, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 29, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 28, 2019 · Apt 2R
Close - Heat/hot water
Entire building
Jul 31, 2019 · Apt BLDG
Close - Water leak
Slow leak
Apr 3, 2019 · Apt 3L
Close - Water leak
Slow leak
Apr 3, 2019 · Apt 3L
Close - Door/window
Window frame
Apr 3, 2019 · Apt 3L
Close - Paint/plaster
Wall
Apr 3, 2019 · Apt 3L
Close - Heat/hot water
Entire building
Mar 12, 2019 · Apt BLDG
Close - Paint/plaster
Wall
Mar 7, 2019 · Apt 3L
Close - Door/window
Window frame
Mar 7, 2019 · Apt 3L
Close - Heat/hot water
Apartment only
Mar 7, 2019 · Apt 3L
Close - Heat/hot water
Entire building
Mar 5, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2019 · Apt BLDG
Close - Paint/plaster
Wall
Mar 4, 2019 · Apt 3L
Close - Electric
Outlet/switch
Mar 4, 2019 · Apt 3L
Close - Water leak
Slow leak
Mar 4, 2019 · Apt 3L
Close - Water leak
Slow leak
Mar 4, 2019 · Apt 3L
Close - Flooring/stairs
Stairs
Mar 2, 2019 · Apt 3L
Close - Flooring/stairs
Stairs
Mar 2, 2019 · Apt 3L
Close - Water leak
Slow leak
Mar 2, 2019 · Apt 3L
Close - Water leak
Slow leak
Mar 2, 2019 · Apt 3L
Close - Unsanitary condition
Mold
Mar 2, 2019 · Apt 3L
Close - Unsanitary condition
Mold
Mar 2, 2019 · Apt 3L
Close - Flooring/stairs
Floor
Feb 22, 2019 · Apt 1R
Close - Appliance
Electric/gas range
Feb 22, 2019 · Apt 1R
Close - Water leak
Slow leak
Feb 13, 2019 · Apt 3L
Close - Water leak
Slow leak
Feb 13, 2019 · Apt 3L
Close - Heat/hot water
Entire building
Feb 13, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2019 · Apt 1R
Close - Heat/hot water
Entire building
Feb 2, 2019 · Apt 1R
Close - Heat/hot water
Apartment only
Feb 1, 2019 · Apt 3L
Close - Heat/hot water
Entire building
Feb 1, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Jan 21, 2019 · Apt 3L
Close - Appliance
Electric/gas range
Dec 27, 2018 · Apt 1R
Close - Heat/hot water
Apartment only
Dec 27, 2018 · Apt 3L
Close - Safety
Fire escape
Dec 27, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,125 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 33
- Block / lot
- 2523 / 16
- Assessed value
- $884,700
- Landmark / historic district
- No
HPD registration #310840, last renewed Sep 18, 2025.
Questions about 188 Green Street
Who owns 188 Green Street?
The owner of record in NYC Department of City Planning PLUTO data is Or 188 Green LLC.
Does 188 Green Street have violations?
Yes. NYC HPD has recorded 116 housing violations at this property.
Is 188 Green Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 188 Green Street built?
City records list 1931 as the year it was built.
How many apartments are in 188 Green Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.