roofy

41 Blue Slip

Brooklyn, NY 11222BBL 3-02472-0050Map

Owner of record: Bop Greenpoint F LLC

41 Blue Slip is an elevator apartment building built in 2018 in Brooklyn, 11222. It has 421 residential units across 39 floors. The owner of record is Bop Greenpoint F LLC. HPD has recorded 17 housing violations here, most recently on September 4, 2026. 3 of the 17 most recent violations are still open.

HPD violations
17
DOB violations
10
ECB violations
20
HPD complaints
107

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Sep 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 17

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 30j, 30th story, 1st apartment from west at north

    Sep 4, 2026 · Apt 30J

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox [ missing notice ] at public hall, 1st story

    Nov 2, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 2, 2025

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings [ missing notice ]

    Nov 2, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 2, 2025

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story

    Nov 2, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Nov 2, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the bathroom located at apt 14m, 14th story, 1st apartment from west at north

    Oct 18, 2025 · Apt 14M

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at stair b at public hall, 1st story

    Jun 3, 2025

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in wasteline at sink in the kitchen located at apt 5b, 5th story, 3rd apartment from north at east

    Jun 3, 2025 · Apt 5B

    Open — Nov sent out
Show 7 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroom located at apt 35l, 35th story, 2nd apartment from west at north

    Aug 9, 2023 · Apt 35L

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 31, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 10, 2022

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 36a, 36th story, 2nd apartment from north at east

    Aug 18, 2021 · Apt 36A

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 36a, 36th story, 2nd apartment from north at east

    Aug 18, 2021 · Apt 36A

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed

DOB building violations · 10

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2022

    Apr 22, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 26, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 26, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 26, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 26, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 26, 2021

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 21, 2020

    Vp*-violation unserved ecb- dismissed

ECB violations · 20

  • Class - 2

    Upon inspection i observed a sidewalk shed installed at exposure 1 with not sidewalk shed information panel installed contrary to code 3301.9.2 sidewalk shed parapet information panel. where a sidewalk shed is

    Feb 12, 2026 · Penalty $1,280

    Resolve
  • Class - 2

    I observed a sidewalk shed installed at expos 1 contrary to code. multiple vertical members placed within 18 inches from the face of the curb line and driveway not protected from displacement contrary to code 3

    Feb 12, 2026 · Penalty $2,430

    Resolve
  • Class - 1

    Failure to maintain safe operations.at the time of inspection of an active job site,responding to an incident "complaint#3745255" where it was reported that an "a" frame over loaded with loose and not bundled s

    Mar 4, 2020

    Resolve
  • Class - 1

    Ssm/lko site safety manager /coordinator failed to immediately notofy the department of conditions as required at time of inspection on an 39 stroies nb i observed actiev jobsite with a ssm onsite also observe

    Feb 21, 2020

    Resolve
  • Class - 1

    Work does not conform to approved documents (construction) and or approved amendments at time of inspection on an 39 stroies nb i observedt act (16) jobsite with a ssm onsite also observed suspended scaffold

    Feb 21, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    License riger designed an unqualified forman.at time of inspection on an 39 stories nb i observed active jobsite with a ssm on site also observed suspended scaffold an multiple exposures in actiev use upon requ

    Feb 21, 2020

    Resolve
  • Class - 1

    Failure to display/maintain documents required by chapter 33.at time of inspection on an 39 stroies nb i observed active jobsite witha ssm on site observed suspended scaffold in use of multiple epxsure with ti

    Feb 21, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to notify the dept of an accident or incident that resulted ina fatality or injury. a worker tripped over floor cover and twisted his ankle:worker was taken by ambulance to the hospital. as per a check

    Dec 16, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to institute safety measures and standards on a construction site. at the time of my inspection it was observed on active construc-tion site with window trim installation. at street level on exposure #

    Nov 6, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3303.3.4.7=storag near sidewalks,walkways and pathways at the time fo my inspection it was observed at epxosure #1 in front of constrcution site whcih was actiev tha tmateirals were stored piled up higher tha

    Nov 6, 2019 · Penalty $2,500

    Resolve
Show 10 more ↓
  • Class - 1

    3309.1:failure to provide protetcion at tiem of inspection of a 39 stroy nb i observed no overhead protetcion or safety measures in place at exp#3 work at 4th floor setback not completed and no safety measures

    Jul 24, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved const documents and/or appoved amendments. @time of inspection of a 39 sty nb i observed suspended scaffold @exp#1,2&3 not installed in aacordance with plans provided on site.

    Jul 24, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain/display on site doc @time of inspection of a 39 sty nb observed platform inside elevator shaft @39th & 3rd sty upon request for design drawing to verify installation, materials to be used,

    Jul 24, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain/display on site documents at time of inspection of a 39 stroy nb i observed no overhead protection in place of adjacent property courtyard at exp#2 construction fence and approx 20 feet of c

    Jul 24, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. noted: at time of inspection observed inadequate housekeeping throughoutfloors 21 up to 39 w/construction debris scattered throughout floors.

    Jul 23, 2019

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. noted: at time of inspection,observed open holes throughout the 21st to the 39th fl along w/tripping hazards. inadequate netting

    Jul 23, 2019

    Resolve
  • Class - 1

    Userfailed to provide documents as required at time of inspection,i asked kept in operators cab.they both replied they dont have the plans.ithen asked robert disanza,who said he was project manager for responde

    May 7, 2018 · Penalty $5,000

    Resolve
  • Class - 2

    Failur eto provide doc. observe active const site workers weree erecting form worl & decking for 1st fl concrete ops i reviewed const doc & noted that concrete contractor on the (w2) in the dob system for concr

    Apr 10, 2018 · Penalty $530

    Resolve
  • Class - 1

    Filed a application containing false statement(inadequate) note: ate the time of my inspection of a 39 story building at foundation phase,construction work in progress.review of work permit application

    Feb 5, 2018 · Penalty $2,400

    Resolve
  • Class - 1

    Additional site safety personnel.note: at the time of my inspection of a 39 story building at foundation phase,construction work in progressthat consists of concrete formwork,stripping rebar and minor excavatio

    Feb 5, 2018

    Resolve

Complaints

  • Door/window

    Door

    Oct 10, 2026 · Apt COMMON

    Open
  • Door/window

    Door

    Oct 10, 2026 · Apt COMMON

    Open
  • Unsanitary condition

    Mold

    Oct 10, 2026 · Apt COMMON

    Open
  • Safety

    Fire escape

    Oct 10, 2026 · Apt COMMON

    Open
  • General

    Ventilation system

    Oct 8, 2026 · Apt PH3C

    Open
  • Paint/plaster

    Window/frame

    Oct 8, 2026 · Apt PH3C

    Open
  • Paint/plaster

    Ceiling

    Oct 8, 2026 · Apt PH3C

    Open
  • Door/window

    Window frame

    Oct 8, 2026 · Apt PH3C

    Open
  • Water leak

    Slow leak

    Oct 8, 2026 · Apt PH3C

    Open
  • Paint/plaster

    Wall

    Oct 8, 2026 · Apt PH3C

    Open
Show 40 more ↓
  • Electric

    Lighting

    Oct 8, 2026 · Apt PH3C

    Open
  • Water leak

    Heavy flow

    Sep 28, 2026 · Apt 26B

    Open
  • Door/window

    Window frame

    Sep 28, 2026 · Apt 26B

    Open
  • Plumbing

    Water supply

    Sep 15, 2026 · Apt 28M

    Close
  • Heat/hot water

    Entire building

    Sep 15, 2026 · Apt 28M

    Close
  • Heat/hot water

    Apartment only

    Sep 10, 2026 · Apt 27C

    Close
  • Heat/hot water

    Entire building

    Sep 9, 2026 · Apt 29C

    Close
  • Heat/hot water

    Entire building

    Sep 4, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jul 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 28, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 28, 2026 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Jun 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 7, 2026 · Apt 6M

    Close
  • Heat/hot water

    Apartment only

    Jun 7, 2026 · Apt 22N

    Close
  • Heat/hot water

    Apartment only

    Jun 7, 2026 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Jun 7, 2026 · Apt 22H

    Close
  • Heat/hot water

    Entire building

    Jun 7, 2026 · Apt 14L

    Close
  • Heat/hot water

    Apartment only

    Mar 26, 2026 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Mar 11, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 11, 2026 · Apt 27A

    Close
  • General

    Ventilation system

    Feb 20, 2026 · Apt 14L

    Close
  • Heat/hot water

    Apartment only

    Feb 10, 2026 · Apt 34E

    Close
  • Flooring/stairs

    Floor

    Jan 6, 2026 · Apt PLAYRO

    Close
  • General

    Ventilation system

    Jan 6, 2026 · Apt PLAYRO

    Close
  • Door/window

    Window pane

    Dec 30, 2025 · Apt 21J

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt 6M

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt 23M

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 23, 2025 · Apt 11F

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2025 · Apt PH3A

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2025 · Apt 6M

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2025 · Apt 11J

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2025 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Dec 4, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2025 · Apt 17K

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2018
Floors
39
Residential units
421
Building area
448,412 ft²
Lot area
48,560 ft²
Zoning
R8
Community board
301
Council district
33
Block / lot
2472 / 50
Assessed value
$63,135,000
Landmark / historic district
No

HPD registration #389515, last renewed Aug 28, 2025.

Questions about 41 Blue Slip

Who owns 41 Blue Slip?

The owner of record in NYC Department of City Planning PLUTO data is Bop Greenpoint F LLC.

Does 41 Blue Slip have violations?

Yes. NYC HPD has recorded 17 housing violations at this property.

Is 41 Blue Slip rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 41 Blue Slip built?

City records list 2018 as the year it was built.

How many apartments are in 41 Blue Slip?

It has 421 residential units and 424 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.