149 Broadway
Brooklyn, NY 11211BBL 3-02457-0039Map
Owner of record: Vernon Kim LLC
149 Broadway is a mixed residential and retail building built in 1890 in Brooklyn, 11211. It has 3 residential units across 4 floors. The owner of record is Vernon Kim LLC. HPD has recorded 22 housing violations here, most recently on September 25, 2025. 22 of the 22 most recent violations are still open.
- HPD violations
- 22
- DOB violations
- 5
- ECB violations
- 7
- HPD complaints
- 16
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall stairs, 1st story
Sep 25, 2025
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at public hall, 1st story
Sep 20, 2025
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of wooden crate at 1st fire escape from north at west exterior wall at fire escape, 3rd story
Sep 19, 2025
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at vestibule ceiling , 1st story
Sep 11, 2025
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling at lobby, 1st story
Jul 21, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 21, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Jul 21, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 21, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Jul 21, 2025
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at light switch at west at public hall, 1st story
Jul 21, 2025
Open — Nov sent out
Show 12 more ↓
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Jul 21, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 21, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Jul 21, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Jul 21, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at scuttle ladder at public hall, 4th story
Jul 21, 2025
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening slide lock and bolt capable of lock at roof hatch at public hall, 4th story
Jul 21, 2025
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at front at fire escape, 3rd story
Jul 21, 2025
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all stories at building front at fire escape
Jul 21, 2025
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of drop ladder obstructing by store awning down to street at fire escape at south
Jun 5, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 4th story
Oct 16, 2023
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 1st story
Oct 16, 2023
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at front at fire escape, 3rd story
Nov 30, 2016
Open — Nov sent out
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to maintain building in code-compliant manner. at the time of inspection and observed at exp #1 front entrance to stair is leaning inward and outside of building show leaning outward at exp #4 corner. e
Jan 4, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35333322x issued on 07/30/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for sidewall seperatio
Oct 20, 2018 · Penalty $1,280
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35333322x issued on 07-30-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Sep 7, 2018 · Penalty $625
Resolve - Class - 1
Failure to maintain. noted: at interior stair, separation evident at side wall leading to the upper levels. also, front entry door and exp #4 wall is leaning inward, from 2nd fl to cellar. have licensed pe eval
Jul 30, 2018 · Penalty $1,250
Active - Non-hazardous
Failure to post central contracotrs sign no genoral contractors sign posted @ job site (alt 1# 301884003) remedy:provide a general contractors sign as per code
May 26, 2005
Resolve - Non-hazardous
Failure to post permits job site no 301884003 has no permits posted for shed alt-job types (alt 1 # 301884003)remedy:post all permits.
May 26, 2005
Resolve - Non-hazardous
No guard rails noted: at roof scuttle hatch approx 6' from edge of roof without required protective guard rail if hatch is opened improperly possibility of it falling off roof.
Jul 9, 2002 · Penalty $1,000
Resolve
Complaints
- Electric
No lighting
Sep 23, 2025 · Apt BLDG
Close - Electric
Power outage
Sep 16, 2025 · Apt BLDG
Close - Electric
No lighting
Sep 15, 2025 · Apt BLDG
Close - Electric
No lighting
Sep 7, 2025 · Apt BLDG
Close - Electric
No lighting
Jul 19, 2025 · Apt BLDG
Close - Electric
No lighting
Dec 4, 2023 · Apt BLDG
Close - Electric
No lighting
Nov 29, 2023 · Apt BLDG
Close - Electric
No lighting
Nov 6, 2023 · Apt BLDG
Close - Electric
Power outage
Oct 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 23, 2017 · Apt BLDG
Close
Show 6 more ↓
- Heat/hot water
Entire building
Aug 23, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
May 27, 2016 · Apt 2
Close - Heat/hot water
Entire building
May 27, 2016 · Apt 2
Close - Heat/hot water
Entire building
May 23, 2016 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 1890
- Floors
- 4
- Residential units
- 3
- Building area
- 5,742 ft²
- Lot area
- 1,806 ft²
- Zoning
- C4-3
- Community board
- 301
- Council district
- 34
- Block / lot
- 2457 / 39
- Assessed value
- $774,450
- Landmark / historic district
- No
Questions about 149 Broadway
Who owns 149 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Vernon Kim LLC.
Does 149 Broadway have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 149 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 149 Broadway built?
City records list 1890 as the year it was built.
How many apartments are in 149 Broadway?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.