78 South 4 Street
Brooklyn, NY 11249BBL 3-02442-0016Map
Owner of record: 78 South 4th LLC
78 South 4 Street is a walk-up apartment building built in 1910 in Brooklyn, 11249. It has 4 residential units across 3 floors. The owner of record is 78 South 4th LLC. HPD has recorded 161 housing violations here, most recently on May 5, 2026. 11 of the 50 most recent violations are still open.
- HPD violations
- 161
- DOB violations
- 0
- ECB violations
- 3
- HPD complaints
- 145
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 161
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the entire apartment located at apt 4, 3rd story, 1st apartment from east at south
Apr 17, 2024 · Apt 4
Open — Invalid certification - CImmediately hazardous
Properly repair or replace the broken or defective inoperable lower sash at fire escape window (2nd from east at south) in the kitchen located at apt 4, 3rd story, 1st apartment from east at south
Apr 17, 2024 · Apt 4
Open — Invalid certification - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 4, 3rd story, 1st apartment from east at south
Apr 17, 2024 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... (hinges) in the entrance located at apt 4, 3rd story, 1st apartment from east at south
Apr 17, 2024 · Apt 4
Open — Not complied with - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 4, 3rd story, 1st apartment from east at south
Apr 17, 2024 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor at public hall, 1st story
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 3rd story, 1st apartment from east at south
Apr 10, 2024 · Apt 4
Open — Not complied with
Show 40 more ↓
- CImmediately hazardous
Remove device preventing door from being self-closing consisting of stopper installed at door in the entrance located at apt 4, 3rd story, 1st apartment from east at south
Apr 10, 2024 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 3rd story, 1st apartment from east at south
Dec 9, 2023 · Apt 4
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kickstand doorstop installed at door in the entrance located at apt 4, 3rd story, 1st apartment from east at south
Dec 9, 2023 · Apt 4
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 4, 3rd story, 1st apartment from east at south
Dec 9, 2023 · Apt 4
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 4, 3rd story, 1st apartment from east at south
Dec 9, 2023 · Apt 4
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 24, 2023
Closed — Violation dismissed - BHazardous
Properly secure the loose 13th wooden tread up from bottom at intermediate landing at public hall stairs, 2nd story
Jan 26, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at intermediate landing at public hall stairs, 2nd story
Jan 26, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at intermediate landing at public hall stairs, 2nd story
Jan 26, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Replace with new the missing escutcheon plate at ceiling above steam riser at south wall in the kitchen located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked leading to area at boiler room
Jan 26, 2023
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser at south wall in the kitchen located at apt 3, 2nd story, 1st apartment from west at north
Jan 26, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household and and bicycles at public hall, 1st story
Jan 23, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door at public hall, 1st story
Jan 23, 2023
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles throughout in the 1st bathroom from north located at apt 4, 5th story, 1st apartment from south at west
Mar 30, 2022 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats in the entire apartment located at apt 4, 5th story, 1st apartment from south at west
Mar 30, 2022 · Apt 4
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the 1st bathroom from north located at apt 4, 5th story, 1st apartment from south at west
Mar 30, 2022 · Apt 4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 4, 5th story, 1st apartment from south at west
Mar 30, 2022 · Apt 4
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall at public hall, 2nd story
Nov 18, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at south wall at public hall, 2nd story
Nov 18, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall at public hall, 3rd story
Nov 18, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at south wall at public hall, 3rd story
Nov 18, 2021
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4, 3rd story, 1st apartment from east at south
Nov 18, 2021 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4, 3rd story, 1st apartment from east at south
Nov 18, 2021 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 4, 3rd story, 1st apartment from east at south
Nov 18, 2021 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4, 3rd story, 1st apartment from east at south
Nov 18, 2021 · Apt 4
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 4, 3rd story, 1st apartment from east at south
Nov 18, 2021 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degree (f) at all hot water fixtures in the entire apartment located at apt 4, 3rd story, 1st apartment from east at south
Nov 18, 2021 · Apt 4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 4, 3rd story, 1st apartment from east at south
Sep 3, 2021 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4, 3rd story, 1st apartment from east at south
Sep 3, 2021 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 4, 3rd story, 1st apartment from east at south
Sep 3, 2021 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 1st room from north located at apt 4, 3rd story, 1st apartment from east at south
Sep 3, 2021 · Apt 4
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 3
- Class - 2
Failure to maintain building in code-compliant manner. noted: interiorpartition walls are spalling,corroded and has hairline cracks in plaster at 3rd fl stair case. (public) below skylight. remedy: repair/repla
May 13, 2009 · Penalty $2,500
Active - Hazardous
Failure to maintain. defect is: decorative masonary over front enterance is missing and front masonary & brick stops-porch is defective. remedy: make all immediate repair to enteranceway & stoop in a safe &
May 19, 1998
Resolve - Hazardous
(hazardous) failure to maintain. defect is: decorative masonary over front entrance is loose and defective and has collapsed onto front stoop. remedy: make all repairs to entrance door and stoop in a safe and
May 10, 1998 · Penalty $800
Active
Complaints
- Heat/hot water
Entire building
Jan 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2023 · Apt 4
Close - Heat/hot water
Entire building
Jan 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2023 · Apt ENTIRE
Close - Heat/hot water
Entire building
Jan 22, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 1, 2023 · Apt APT2
Close - Heat/hot water
Entire building
Jan 1, 2023 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 31, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 20, 2022 · Apt TOPFLO
Close - Heat/hot water
Entire building
Dec 20, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 25, 2022 · Apt 4
Close - Unsanitary condition
Pests
Mar 12, 2022 · Apt 4
Close - Heat/hot water
Apartment only
Nov 19, 2021 · Apt APT4
Close - Heat/hot water
Apartment only
Nov 15, 2021 · Apt 4
Close - Paint/plaster
Ceiling
Sep 3, 2021 · Apt 4
Close - Electric
No lighting
Sep 3, 2021 · Apt 4
Close - Heat/hot water
Entire building
Mar 1, 2019 · Apt 4
Close - Heat/hot water
Entire building
Feb 11, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2019 · Apt 3
Close - Heat/hot water
Apartment only
Jan 31, 2019 · Apt 4
Close - Heat/hot water
Entire building
Jan 30, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2019 · Apt 4
Close - Heat/hot water
Entire building
Dec 26, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 12, 2018 · Apt 4
Close - Heat/hot water
Apartment only
Dec 6, 2018 · Apt 4THFL
Close - Heat/hot water
Entire building
Nov 24, 2018 · Apt 3
Close - Heat/hot water
Entire building
Nov 10, 2018 · Apt 2
Close - Heat/hot water
Entire building
Sep 7, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 24, 2018 · Apt 4
Close - Heat/hot water
Entire building
Jul 7, 2018 · Apt 4
Close - Heat/hot water
Entire building
May 24, 2018 · Apt 4
Close - Heat/hot water
Entire building
May 8, 2018 · Apt 4
Close - Heat/hot water
Entire building
Apr 25, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Apr 18, 2018 · Apt 2
Close - Heat/hot water
Entire building
Apr 15, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 13, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 13, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Apr 13, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Apr 10, 2018 · Apt 2
Close - General
Cooking gas
Apr 10, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Apr 10, 2018 · Apt 2
Close - Flooring/stairs
Floor
Mar 21, 2018 · Apt 4
Close - Flooring/stairs
Floor
Mar 21, 2018 · Apt 4
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1910
- Floors
- 3
- Residential units
- 4
- Building area
- 3,360 ft²
- Lot area
- 3,731 ft²
- Zoning
- M1-2/R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2442 / 16
- Assessed value
- $890,550
- Landmark / historic district
- No
HPD registration #356878, last renewed Jun 10, 2026.
Questions about 78 South 4 Street
Who owns 78 South 4 Street?
The owner of record in NYC Department of City Planning PLUTO data is 78 South 4th LLC.
Does 78 South 4 Street have violations?
Yes. NYC HPD has recorded 161 housing violations at this property.
Is 78 South 4 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 78 South 4 Street built?
City records list 1910 as the year it was built.
How many apartments are in 78 South 4 Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.