399 Hooper Street
Brooklyn, NY 11211BBL 3-02399-0019Map
Owner of record: E & D Realty Management Group LLC
399 Hooper Street is an elevator apartment building built in 2017 in Brooklyn, 11211. It has 10 residential units across 6 floors. The owner of record is E & D Realty Management Group LLC. HPD has recorded 9 housing violations here, most recently on April 11, 2026. 6 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 48
- ECB violations
- 95
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Remove device preventing door from being self-closing kickstand door stop at building front entrance door , 1st story
Apr 11, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 4th story
Sep 8, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 8, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Sep 8, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Sep 8, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 8, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Sep 8, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 8, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 48
- Construction other optional
Borough commissioner has ordered all work stopped under application #321040565 on 06/29/2022 due to withdrawal of superintendent of construction.
Jul 1, 2022
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped under application #321040565 on 06/29/2022 due to withdrawal of superintendent of construction.
Jul 1, 2022
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 9, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 9, 2020
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant. damage sustained to have been cause by vehicle colliding into sidewalk shed damaging approx. 20' on borinquen place and approx. 20' onto hooper street. damage shed partially collapsed onto sidewalk and vehicles.
Feb 15, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Construction other optional
Stop all work except to make site safe, contact the borough comm. offi ce at 718 802-3677
Feb 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed
Show 38 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 5, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 27, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jan 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Immediate emergency anythingoptional
Also associated with violation #35086227m
Jan 10, 2014
Dob violation - dismissed - Construction other optional
Stop all work,make site safe only,contact the borough commissioner's o ffice immediately
Jul 10, 2010
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 2, 2008
Dob violation - dismissed - Construction other optional
Failure to protect the sides of an excavation carried to a depth great er than 5 feet above nb a sandy composition of fill is cut at sidewalk side of hooper st approx 12feet below curb approx 20' long noted: ina dequate shoring piles and non approved plywood approx 9' under height remedy: stop all work except to backfill to 3 story bldg and sidewalk
Apr 8, 2008
Dob violation - dismissed
ECB violations · 95
- Class - 2
At the time of inspection ,observed 6 story new building. superintendent was in the site. i walked inside the building, i noticed no handrails on stairwell. provide handrails on stairwell
Dec 1, 2022 · Penalty $1,250
Resolve - Class - 1
Observed 2 workers upon a pump jack scaffold participating in construction work. upon further review, partial stop work order exist on property. work at exposure 1 is completed, contrary to partial stop work or
Nov 22, 2022
Resolve - Class - 2
Observed 2 workers upon a pump jack scaffold participating in construction work. phone calls were made to g.c., owner and the attention of workers to provide access. owner stated no one will be available betwe
Nov 22, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to provide sidewalk shed where required at the time of inspection nb 6 sty. i observed facade work not completed at exp#1 as required sws but sws permit has been removed b0018229. remedy: stop all facad
Feb 3, 2022 · Penalty $2,400
Resolve - Class - 2
Work not conform to approved construction documents at the time of inspection i observed: tie back for lifeline & tieback to pump jack scaffold in metal rail on roof level which not as per approved dd.
Feb 3, 2022 · Penalty $625
Resolve - Class - 2
Failure to obtain temporary construction permit. at the time of inspection proposed 6 fl sty new bldg i observed: pump jack scaffold above sws at exp#3 over 40 feet. remedy: stop all facade work at exp#3 stop
Feb 3, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to maintain/display on site document required by bc 33(elevator platform dd 3301.6.1). at the time of inspection,i observed 6 sty new bldg. elevator shift has welding steel beams on roof level as the
Feb 3, 2022 · Penalty $625
Resolve - Class - 2
Pedestrian protection does not meet specification #3307.6.4.8(1) note at the time of my insepction i observed a sidewlak shed erected at xposure 1 ,2 and 4 i also observed that there no light functioning unders
Nov 16, 2020 · Penalty $2,400
Resolve - Class - 2
The exterior walls on exposure #1,#2,#3 & #4 from 1st. to 6th. floor were installed without r-11.4ci rigid insulation contrary to r-11.4ci rigid insulation indicated on energy analysis & exterior wall details i
Sep 29, 2020 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection does not meet code specification note at time of my inspection of a 6 story new building under construction inactive site i observed sidewlka shed installed at expo #1,3 and 4 of the buil
Sep 15, 2020 · Penalty $2,400
Resolve
Show 40 more ↓
- Class - 2
At time of energy code compliance inspection. i observed that there were no complete sets of dob approved plan at site( missing energy analysis & exterior wall details plans)., provide approved /accepted constr
Sep 1, 2020 · Penalty $1,563
Resolve - Class - 2
Failure to provide approved plans.nb#321040565 on an energy complianceinspection i observed construction work without having complete set ofplans.rem:please contact:energy code [email protected].
Mar 4, 2020 · Penalty $625
Resolve - Class - 2
Pedestrian protectoin does not meet code specification#3307.6.4.8.noteat the time of 6:15pm of my inspection,i observed a sidewalk shed erected/exposure one,two and three.i also observed that there were no prow
Feb 26, 2020 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specification#3307.6.4.8.noteat the time of my inspection,i observed sidewalk shed erected at exposure 1,2 and 4.i also observed that light bulbs in place underside the
Feb 4, 2020 · Penalty $2,400
Resolve - Class - 2
Fail to maintain adequate housekeeping per sections requirements. noted at time of inspection on a 6 story nb(proposed) masonry. observed noongoing construction work. also noted sidewalk around site,w/ debris,g
Oct 2, 2019
Resolve - Class - 2
Permit expired for temporary construction equipment site(heavy duty sidewalk shed). at time of inspection on a 6 story nb i observed,no construction activity,sws permit expired on 7/10/18 and vio#35432075l has
Oct 2, 2019
Resolve - Class - 2
Prohbited outdoor advertising company sign on fence.noted:@time of insp on a 6 story nb.i observed no ongoing const work,also noted:fence w/several advertising at corner exp 1&4 prohibited sign posted on fence
Oct 2, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to provide sidewalk shed where required. at the time of inspection of a new bldg under construction. 5 sty in height i observed no sidewalk shed for overhead protection installed as per code. the bldg
Jul 1, 2019 · Penalty $2,400
Resolve - Class - 2
Job site fence not constructed or not maintained pursuant to subsection. noted: at time of inspection at an active jobsite 6 sty i observed construction jobsite fence has a lot of graffiti all over the fence.
May 30, 2019 · Penalty $800
Resolve - Class - 2
Temporary construction equipment on site-exp permit. noted: at time ofinspection of 6 sty bldg,upon reviewing bis/dob now observed jobsite construction fence permit exp on 8-3-18. remedy: renew permit.
May 30, 2019 · Penalty $625
Resolve - Class - 1
28-207.2.2 work unlawful contrary to fswo at time of inspection of a new bldg under construction no work in progress due to a full stop work order at jobsite. i observed several workers dismanteling
Dec 19, 2018
Resolve - Class - 1
28207.2.2 work unlawful contrary to fswo at time of my inspection of a new buidling under construction no work on egress due to a full stop work order.at jobsite.i observed several workers dismantling and
Dec 19, 2018 · Penalty $2,500
Resolve - Class - 1
Bc 1704.20.6 the respondent,special inspector,failed to meet the reqs of bc 1704.20.6.bc 1704.20.6 mandated "prior to commencement of work,the special inspector shall review the contractor's proposed sequence o
May 31, 2018 · Penalty $2,530
Resolve - Class - 1
The respondent failed to provide the required number of borings as required in bc 1802.4l.1 bc 1802.4.1 mandates "two exploratory borings for built-over areas greater than 750 square feet but less than 5,000 sq
May 31, 2018 · Penalty $2,500
Resolve - Class - 1
The respondent permit holder failed to meet the requirements of bc 1704.20.6 bc 1704.20.6 mandates prior to commencement of work the specialinspector shall review the contractor's proposed sequence of operation
May 31, 2018 · Penalty $6,250
Resolve - Class - 1
Roor protection/overhead protection @time of insp on a active jobsite of a 6 story bldg observed fire escapr @exp#2 partial covered w/supported scaffold netting.also observed that no roof/overhead protection in
May 15, 2018 · Penalty $5,000
Resolve - Class - 2
Bc 3307.2.1 failure to comply w/dot regualtions @time of insp on a active jobsite of a 6 story bldg,observed material stored in the street stacked up in top of each other approx 6 ft in height container in the
May 15, 2018 · Penalty $250
Resolve - Class - 1
Work contrary to a stop work order @time of insp on a active jobsite of a (6) story bldg, observed work being done on scaffold in less that 10 ft of leading edge @exp#2 & exp#3 currently under a pswo issued by
May 15, 2018 · Penalty $5,000
Resolve - Class - 1
Superintendent logbook. at time of inspection on a active jobsite of 6story building, observed that new super was on site jospeh jackson reg #27142 and not on pw2, super on pwz vedat rexhepi not signing logboo
May 15, 2018 · Penalty $625
Resolve - Class - 1
Supportd scaffold installed w/out permit.@time of insp on a active jobsite,observed scaffold installed @exp#1,exp#2 & exp#4 upon asking permit permit for suspended scaffold & drawing none was provided scaffold
May 15, 2018
Resolve - Class - 1
Bc 3303.5.2 dropping or throwing prohibited @time of insp on a active jobsite of a 6 story bldg observed worker throwing material @exp#1.worker throwing buckets w/debris right above entrance @exp#1.this situati
May 15, 2018 · Penalty $625
Resolve - Class - 1
Bc 3307.5 flags/flagger (no cert) @time of insp on a active jobsite of6 story bldg,observed form lift ops on the street,moving palets,blocking vehicular traffic.observed worker w/flag on hand,upon request for f
May 15, 2018 · Penalty $625
Resolve - Class - 1
Standing water 3 inches or more.@time of insp on a active jobsite of a6 story bldg,observed standing water on elevator shaft/pit approx 6 inches in height.standing water creates a health & hazard condition as a
May 15, 2018 · Penalty $625
Resolve - Class - 1
Bc 3301.2 design drawings (supported scaffold) @time of insp on a active jobsite of a 6 story bldg, observed a supported scaffold installed @exp#1,exp#2 & exp#3, observed a large blue (tarp) wrapping scaffold
May 15, 2018 · Penalty $1,250
Resolve - Class - 1
Work contrary to approved plans. at time of inspection on a active jobsite of a 6story bldg, observed that c-joists were not connected properly by cross braces. connection between c-joists were missing, mix and
May 15, 2018 · Penalty $625
Resolve - Class - 1
Bc 3314.14.4.5 dislodgement (unattended material on support scaffold)at time of inspection on a active jobsite of a 6 story bldg, observed supported scaffold installed on exp1, exp2, exp4 on top of sidewalk
May 15, 2018
Resolve - Class - 1
Bc3305.2.2 field connections (structurel steel) at time of inspectionon an active jobsite of a 6 story bldg, obseved steel erections for structural purposes of bldg structures, upon inspecting connections thro
May 15, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to designate &/or have construction superintendent present at site when required. at time of inspection observed active job site. nosuperintendnet no component persons on site. some worker was working
Apr 3, 2018 · Penalty $2,500
Resolve - Class - 1
No fdny permit for gas heater @time of insp of a 6 story bldg for an incident.i observed a gas powered heater in the bldg.when i asked for a permit for the use of the heater one was not presented or available.r
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Failure to comply w/ manufacturers specifications. at time of inspection on a 6story bldg for an incident during my inspection observed a 6"grinder that had no protective guard, and a mechanical hoist with no s
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Bc 3303.4.5 improper material storage @const site @time of inso of a 6story bldg for an incident during my insp i observed material on street level @ 6 feet high w/no barricades or pedestrian protection around
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Failure to maintain adequate housekeeping (stair fillins)at time of inspection on a 6sty bldg for an incident upon inspection i observed multiple areas of the staircase w/no stair fillins,or inadequate fill
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Failure to safeguard public and property. at time of inspection of a 6story building for an incident i observed that the fire escape for adjacent building in the event of a fire, also netting was not installed
Mar 1, 2018 · Penalty $25,000
Resolve - Class - 1
Bc3301.7 design drawings. at time of inspection on a 6 story bldg foran incident during my inspection i observed platforms built in elevator shafts and in certain areas around building, i asked for design draw
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Bc 3307.3 no pedestrian protection around stored material on street @time of insp of a 6 story bldg for an incident during my inso i observed material stored on street next to sidewalk,w/no barricades built aro
Mar 1, 2018
Resolve - Class - 1
Housekeeping. at time of inspection for a 6 story building for an incident during my inspection i observed excessive debris and material scattered throughout working area, creating a hazard for a trip and fa
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Bc3314.2 supported scaffold not properly built (base plates) at time of inspection of a 6sty bldg for an incident during my inspection i observed scaffolds built around entire 6th floor for installation of cmu
Mar 1, 2018 · Penalty $1,250
Resolve - Class - 1
Bc3307.2.3 overhead protection for walkway within site at time of inspection for an incident i observed that overhead protection was missing from jobsite at exp2 leading from bldg to work site exterior also
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Bc 3303.4.7 no dob permit for material(storage)on street @time of inspof a 6 story bldg for an incident during my insp i observed that material stored on roadway was done so in an unsafe manner,material block w
Mar 1, 2018 · Penalty $400
Resolve - Class - 1
Bc 3309.1 inadequate roof protection for adjoining bldg @time of insp for a 6 story bldg for an incident during my insp bldg for an incidentwas inadequate.not covering 20ft span as required.roof protection only
Mar 1, 2018 · Penalty $400
Resolve
Complaints
- Paint/plaster
Wall
Mar 30, 2026 · Apt 42
Close - Flooring/stairs
Floor
Mar 30, 2026 · Apt 42
Close - Paint/plaster
Ceiling
Mar 30, 2026 · Apt 42
Close - Plumbing
Radiator
Mar 30, 2026 · Apt 42
Close - Unsanitary condition
Mold
Mar 30, 2026 · Apt 42
Close - Flooring/stairs
Floor
Mar 30, 2026 · Apt 42
Close - Door/window
Door
Oct 28, 2025 · Apt 4A
Close - Door/window
Door
Sep 3, 2025 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Aug 15, 2024 · Apt BLDG
Close - Electric
Power outage
Nov 5, 2017 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2017
- Floors
- 6
- Residential units
- 10
- Building area
- 13,693 ft²
- Lot area
- 2,853 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2399 / 19
- Assessed value
- $1,261,800
- Landmark / historic district
- No
HPD registration #391532, last renewed Oct 15, 2025.
Questions about 399 Hooper Street
Who owns 399 Hooper Street?
The owner of record in NYC Department of City Planning PLUTO data is E & D Realty Management Group LLC.
Does 399 Hooper Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 399 Hooper Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 399 Hooper Street built?
City records list 2017 as the year it was built.
How many apartments are in 399 Hooper Street?
It has 10 residential units and 13 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.