roofy

163 South 1 Street

Brooklyn, NY 11211BBL 3-02393-0042Map

Owner of record: 163 South One, LLC

163 South 1 Street is a walk-up apartment building built in 1920 in Brooklyn, 11211. It has 8 residential units across 4 floors. The owner of record is 163 South One, LLC. HPD has recorded 38 housing violations here, most recently on May 5, 2026. 3 of the 38 most recent violations are still open.

HPD violations
38
DOB violations
6
ECB violations
15
HPD complaints
23

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 38

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less then 10 sq feet at west wall in the bathroom located at apt 4b, 4th story, 1st apartment from west at north original violation 18192160 issued 28-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 28, 2025 · Apt 4B

    Open — Violation will be reinspected
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sq feet at west wall in the bathroom located at apt 4b, 4th story, 1st apartment from west at north

    Aug 28, 2025 · Apt 4B

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 28, 2025

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    May 22, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    May 22, 2025

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at south. , 2nd story

    Aug 29, 2011

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in obstructed drainage at rear [north] yard near to entrance door to basement level of duplex apt #1r

    Oct 22, 2010

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in obstructed drainage at the bottom of stairs from front areaway to basement

    Oct 22, 2010

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 1r, 1st story, apartment at east

    Oct 22, 2010 · Apt 1R

    Closed — Violation dismissed
Show 28 more ↓
  • B

    M/d law abate the nuisance consisting of evidence of water leak at ceiling in the 1st room from north located at apt 1r, 1st story, apartment at east

    Oct 22, 2010 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective counter balance at lower window sash north wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective metal base cabinet in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective electric light switch on south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection waste line under bath tub in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from east located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of rodents rats in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    May 6, 2009 · Apt 1

    Open — First no access to re- inspect violation
  • B

    D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes all stys at rear.

    Aug 1, 1988

    Closed — Violation dismissed
  • A

    D26-10.01,20.07 adm code provide approved one-hour fire resistance rated self-closing door with key-operated dead bolt & latch set, peep hole & chain guard at main entrance to 4th sty east apt.

    Aug 1, 1988

    Closed — Violation dismissed
  • A

    D26-10.01,20.07 adm code provide approved one-hour fire resistance rated self-closing door with key-operated dead bolt & latch set, peep hole & chain guard at main entrance to 4th sty west apt.

    Aug 1, 1988

    Closed — Violation dismissed
  • A

    D26-20.07 adm code provide approved one-hour fire resistance rated self-closing door at all openings to public hall other than apt main entrance door from 4th sty east apt.

    Aug 1, 1988

    Closed — Violation dismissed
  • A

    D26-20.07 adm code provide approved one-hour fire resistance rated self-closing door at all openings to public hall other than apt main entrance door from 4th sty west apt.

    Aug 1, 1988

    Closed — Violation dismissed
  • A

    D26-20.07 adm code provide seal of one-hour fire retarding material for transoms over all door openings to public hall from 4th sty east apt.

    Aug 1, 1988

    Closed — Violation dismissed
  • C

    D26-17.10 adm code provide ready access to building's heating system cellar door locked.

    Aug 1, 1988

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing.

    Aug 1, 1988

    Closed — Violation dismissed
  • A

    D26-12.03 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear fire escapes all stys.

    Aug 1, 1988

    Closed — Violation dismissed
  • C

    D26-17.10 adm code post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to building's heating system 1 sty public hall & on boiler room door.

    Aug 1, 1988

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall & on boiler room door.

    Nov 10, 1987

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of double cylinder key operated lock entrance door 1 sty north apt 2. located at apt 2

    Nov 10, 1987 · Apt 2

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective 2 sty apt 2r cabell. , section '' ''

    Oct 19, 1987 · Apt 2R

    Closed — Violation dismissed
  • B

    D26-16.01 adm code provide suitable tight cover for the handhole opening of trap cellar front.

    May 2, 1984

    Closed — Violation dismissed
  • B

    D26-10.01 adm code properly repair with similar material the broken or defective plaster cellar clg rear.

    May 2, 1984

    Closed — Violation dismissed
  • A

    D26-16.01 adm code properly ream out, tap and plug, with screw plugs, the holes in 3 inche soil stack cellar rear.

    May 2, 1984

    Closed — Violation dismissed
  • B

    D26-11.01, 11.03, 11.05 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar center.

    May 2, 1984

    Closed — Violation dismissed

DOB building violations · 6

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 22, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 22, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 23, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 15

  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35062175n issued on 2/28/15. no permits pulled to correct violation conditions as mentioned on(provision)violation #35062175n.

    Apr 11, 2015

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35062250y issued on 2/23/15. no permits pulled to correct violation conditions. remedy: comply w/the comm's order.

    Apr 11, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/ the comm's order contained in notice of violation#35060846x issued on 01/15/15.no permits pulled tro connect(mention)ofviolation.rem:comply w/ the comm's order.

    Feb 28, 2015

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35103300l issued on 7/29/14. noted: no permits to legalize,norecord of compliance. remedy: comply w/the comm's order.

    Feb 23, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35103300l issued on 7/29/14. work w/o a permit @ roof level constructed deck that covers fresh air & mechanical vents. remedy: comp

    Jan 15, 2015 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/the comm'nrs order contained in nov#35103300l issued on 07/29/14.work w/o a permit at roof level:constructed wood deck which covers vents for fresh air and mechanical equipment.remedy:comply

    Nov 6, 2014 · Penalty $2,400

    Resolve
  • Class - 2

    Fail to comply w/the commissioner's order to file a cert of correction w/the d.o.b. for n.o.v. #35103219y issued on 07/29/14 pursuant to 28-204.4 & 1rcny 102-01.fail to maintain bldg.brick chimney leaning outwa

    Sep 18, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/ the comm's order contained in notice of violation#35103300l issued on 07/29/14.work w/o a permit.const wood deck @ rooflevel.rem:comply w/ the comm's order.

    Sep 18, 2014 · Penalty $2,400

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or bldg dept.records.noted @ roof top area,constructed wood deck approx.25'x 25' for accessory use to residential bldg.under application #32007

    Jul 29, 2014 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to maintain bldg walls or appurtenances. noted: at roof level at exposure 4 brick chimney has leaned outward causijg bricks to dislodge at bend of chimney & fall into courtyard below: vacate courtyard.

    Jul 29, 2014 · Penalty $1,000

    Resolve
Show 5 more ↓
  • Class - 1

    Work w/o a permit.noted @ roof level constructed wood deck approx.25'x25'.dob records indicate no permit was issued for work.work performed covers fresh air vends also cover mechanical vents.rem:obtain all requ

    Jul 29, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Supervision/use of rigging equipment w/o a rigger's license. noted: nolicense rigger on site for worker on suspended scaffold in use at exp #1 at time of inspection. remedy: discontinue use.

    Nov 24, 2010 · Penalty $4,800

    Resolve
  • Class - 2

    Sec. 1704.1.1;27-132. failure to file tech report of responsibility (tr-1) prior to permit issuance and prior to start of work under special/controlled inspection requirement. noted: renovation work ongoing

    Dec 16, 2009

    Resolve
  • Class - 2

    Work does not conform to approved construction documents. noted: work ongoing under alt 2 permit #320070766 interior renovations. 2x4 wood framed walls are constructed on flr 1 where wall schedule calls for

    Dec 16, 2009

    Resolve
  • Class - 1

    Sec. 3303.5.2;27-1019a. construction material and debris being thrown from the 3rd flr windows of exterior of bldg. observed lumber from interior demo being dropped to unguarded sidewalk by workers at 2 windows

    Dec 16, 2009 · Penalty $1,600

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Aug 27, 2025 · Apt 4B

    Close
  • Water leak

    Slow leak

    Aug 27, 2025 · Apt 4B

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2025 · Apt 4B

    Close
  • Water leak

    Slow leak

    Aug 26, 2025 · Apt 4B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Nov 16, 2024 · Apt BLDG

    Close
  • Plumbing

    Water-leaks

    Aug 25, 2011 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    Aug 25, 2011 · Apt 1L

    Close
  • Plumbing

    Water-leaks

    Oct 17, 2010 · Apt 1R

    Close
  • General

    Mold

    Oct 17, 2010 · Apt 1R

    Close
  • Plumbing

    Water-leaks

    Oct 17, 2010 · Apt 1R

    Close
Show 13 more ↓
  • Plumbing

    Water-leaks

    May 6, 2009 · Apt 1

    Close
  • Paint/plaster

    Wall

    May 6, 2009 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    May 6, 2009 · Apt 1

    Close
  • General

    Floor

    May 6, 2009 · Apt 1

    Close
  • Nonconst

    Vermin

    May 6, 2009 · Apt 1

    Close
  • Nonconst

    Rubbish

    May 6, 2009 · Apt 1

    Close
  • General

    Windows

    May 6, 2009 · Apt 1

    Close
  • General

    Windows

    May 6, 2009 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Apr 29, 2009 · Apt 1

    Close
  • General

    Floor

    Apr 29, 2009 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Apr 29, 2009 · Apt 1

    Close
  • Electric

    Lighting

    Apr 29, 2009 · Apt 1

    Close
  • Nonconst

    Rubbish

    Apr 29, 2009 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C4)
Year built
1920
Floors
4
Residential units
8
Building area
7,000 ft²
Lot area
2,375 ft²
Zoning
R6B
Community board
301
Council district
34
Block / lot
2393 / 42
Assessed value
$1,501,200
Landmark / historic district
No

HPD registration #314606, last renewed Oct 9, 2025.

Questions about 163 South 1 Street

Who owns 163 South 1 Street?

The owner of record in NYC Department of City Planning PLUTO data is 163 South One, LLC.

Does 163 South 1 Street have violations?

Yes. NYC HPD has recorded 38 housing violations at this property.

Is 163 South 1 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 163 South 1 Street built?

City records list 1920 as the year it was built.

How many apartments are in 163 South 1 Street?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.