327 Grand Street
Brooklyn, NY 11211BBL 3-02384-0034Map
Owner of record: 327 Grand Realty LLC
327 Grand Street is a mixed residential and retail building built in 1899 in Brooklyn, 11211. It has 2 residential units across 3 floors. The owner of record is 327 Grand Realty LLC. HPD has recorded 14 housing violations here, most recently on February 17, 2011. 14 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 25
- ECB violations
- 2
- HPD complaints
- 31
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Feb 17, 2011
Open — Nov sent out - BHazardous
Properly repair the broken or defective building entrance door lock , 1st story
Apr 8, 2010
Open — Nov sent out - BHazardous
Replace the broken or defective sink in the kitchen located at apt 2fl, 2nd story, 1st apartment from west at north
Sep 15, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Sep 15, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative bell and return buzzer syst. from 1st. story public hall vestibule in the entrance located at apt 2fl, 2nd story, 1st apartment from west at north
Sep 15, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Replace the broken or defective bathtub in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north
Sep 15, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 2fl, 2nd story, 1st apartment from west at north
Sep 15, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring in the entire apartment located at apt 2fl, 2nd story, apartment at north
Sep 15, 2005 · Apt 2FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north
Sep 15, 2005 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective the lock at vestibule door , 1st story
Sep 15, 2005
Open — Nov sent out
Show 4 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor at public hall , 1st story
Sep 15, 2005
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures range in the kitchen located at apt 2, 2nd story
Oct 31, 2002 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2, 2nd story
Oct 24, 2002 · Apt 2
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective fire retarded plaster ceiling and walls at public hall, 3rd story
Mar 18, 2000
Open — Nov sent out
DOB building violations · 25
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active
Show 15 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active
ECB violations · 2
- Class - 2
Gas meter room is unventilated and there is storage and debris in the gas meter room; correct violating conditions and submit the certificate of correction
Mar 26, 2019 · Penalty $3,125
Active - Class - 2
As per class 2 (b265) 28-303.7, failure to file a complete boiler inspreport as per dob records.
Dec 9, 2016 · Penalty $500
Active
Complaints
- Heating
Heat related
Dec 24, 2013 · Apt 2
Close - Heating
Heat-plant
Sep 14, 2013 · Apt 2
Close - General
Doors
Dec 30, 2011 · Apt 1
Close - Nonconst
Rubbish
Dec 30, 2011 · Apt 1
Close - Construction
Roof
Dec 30, 2011 · Apt 1
Close - General
Doors
Apr 1, 2010 · Apt BLDG
Close - Plumbing
Bathtub/shower
Aug 6, 2008 · Apt 2
Close - Paint/plaster
Ceiling
Aug 6, 2008 · Apt 2
Close - Plumbing
Water-leaks
Aug 6, 2008 · Apt 2
Close - Heating
Heat related
Aug 6, 2008 · Apt 2
Close
Show 21 more ↓
- Heating
Heat related
Mar 25, 2008 · Apt GROUN
Close - Paint/plaster
Wall
Oct 6, 2005 · Apt 1
Close - Electric
Lighting
Oct 6, 2005 · Apt 1
Close - Electric
Lighting
Oct 6, 2005 · Apt 1
Close - Paint/plaster
Ceiling
Oct 6, 2005 · Apt 1
Close - Electric
Bell-buzzer/intercom
Oct 6, 2005 · Apt 1
Close - Plumbing
Toilet
Oct 6, 2005 · Apt 1
Close - Plumbing
Bathtub/shower
Oct 6, 2005 · Apt 1
Close - Plumbing
Basin/sink
Oct 6, 2005 · Apt 1
Close - Paint/plaster
Wall
Oct 6, 2005 · Apt 1
Close - Electric
Lighting
Aug 18, 2005 · Apt 2FL
Close - Paint/plaster
Ceiling
Aug 18, 2005 · Apt 2FL
Close - Electric
Lighting
Aug 18, 2005 · Apt 2FL
Close - Plumbing
Toilet
Aug 18, 2005 · Apt 2FL
Close - Paint/plaster
Ceiling
Aug 18, 2005 · Apt 2FL
Close - Plumbing
Bathtub/shower
Aug 18, 2005 · Apt 2FL
Close - Paint/plaster
Wall
Aug 18, 2005 · Apt 2FL
Close - Electric
Lighting
Aug 18, 2005 · Apt 2FL
Close - Electric
Bell-buzzer/intercom
Aug 18, 2005 · Apt 2FL
Close - Paint/plaster
Wall
Aug 18, 2005 · Apt 2FL
Close - Plumbing
Basin/sink
Aug 18, 2005 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1899
- Floors
- 3
- Residential units
- 2
- Building area
- 3,218 ft²
- Lot area
- 1,950 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 34
- Block / lot
- 2384 / 34
- Assessed value
- $192,780
- Landmark / historic district
- No
Questions about 327 Grand Street
Who owns 327 Grand Street?
The owner of record in NYC Department of City Planning PLUTO data is 327 Grand Realty LLC.
Does 327 Grand Street have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 327 Grand Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 327 Grand Street built?
City records list 1899 as the year it was built.
How many apartments are in 327 Grand Street?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.