89 Grand Street
Brooklyn, NY 11249BBL 3-02379-0040Map
Owner of record: Ptse Property Holdings LLC
89 Grand Street is a mixed residential and retail building built in 2013 in Brooklyn, 11249. It has 3 residential units across 4 floors. The owner of record is Ptse Property Holdings LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 8
- ECB violations
- 13
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 8
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 6, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Dec 6, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jul 6, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 22, 1993
Vh*-violation hazardous dismissed - Construction other optional
C-construction other optional
Aug 18, 1993
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jun 7, 1993
Dob violation - active
ECB violations · 13
- Class - 1
Bldg or open lot occupied w/o a valid cert of occupancy. at the time of my inspection of a 4 sty bldg top off. i observed that the site was active w/work being sone on the 1st fl level. from the 2nd fl to the
Feb 28, 2019 · Penalty $2,500
Resolve - Class - 1
Sec. 3307.4.3 flagperson note: at the time of my inspection of a 4 sty bldg at bulkhead level,construction work in progress. i observed a construction equipment(material lift)crossing temporary walkway performi
Dec 6, 2016 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit. note: at the time of my inspection of a 4 sty alteration,construction work in progress. i observed approx 66feet of supported pipe scaffold erected at exp#2. upon request for permit & design
Dec 6, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails. note: at the time of my inspection of a 4 sty bldg at bulkhead level,construction work in progress. i observed
Dec 6, 2016 · Penalty $1,200
Resolve - Class - 1
Sidewalk shed where required. note: at the time of my inspection of a 4 sty alteration at bulkhead level approx 70feet in height & 12feet setback from temporary walkway,construction work in progress. i observed
Dec 6, 2016
Resolve - Class - 2
Failure to institute & maintain temporary equipment measures. note: atthe time time of my inspection of a 4 sty alteration,construction workin progress. i observed that there were no overhead protection or safe
Dec 6, 2016 · Penalty $5,000
Resolve - Class - 1
Work contrary to approved construction documents.upon inspection noted,more than 50% of the bulding demolished under alteration permit, contrary to permit and application.rem:stop all work except obtaining demo
Jun 12, 2015
Resolve - Class - 1
Failure to maintain.@ time of insp.there was an approx.10'fence erected @ exp.#1 exceeding the 8'allowed by the code.trade of steel.work w/o a permit swo issued for fence.rem:comply with code erect proper fence
Jan 28, 2015
Resolve - Class - 1
Work w/o a permit.@ this demo monitoring insp.noted that the bldg was demolished & no permit was placed before demolition of bldg fswo issued for entire site.rem:obtain permit as per code/swo issued call best f
Jan 28, 2015
Resolve - Non-hazardous
Rough plumbing removed from basement through floor 1, 2, 3, and roof. plumbing work without a permit. remedy: obtain a permit if feasible or restore to prior legal condition.
Nov 25, 1994 · Penalty $1,000
Resolve
Show 3 more ↓
- Non-hazardous
Installing round plumbing leaders line and underground waste lines.forbathrooms and kitchen and leader line and gas lines. cast iron. gas lines not tested no plans. remedy: obtain a permit if feasible or --
Nov 25, 1994 · Penalty $350
Resolve - Non-hazardous
Work without a permit. interoir gut. new rafters and roof. two rooms approx. dimension
Jul 6, 1994 · Penalty $350
Resolve - Hazardous
Failure to maintain exterior building wall. (hazardous defect is). eroded mortar joints on entire rear masonry wall. loose missing and collapsed brick work at 3rd sty rear n/e section. remedy: file for plans &
Aug 2, 1993 · Penalty $1,000
Resolve
Complaints
- General
Cooking gas
Aug 14, 2025 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 2013
- Floors
- 4
- Residential units
- 3
- Building area
- 13,951 ft²
- Lot area
- 4,797 ft²
- Zoning
- R6A
- Community board
- 301
- Council district
- 34
- Block / lot
- 2379 / 40
- Assessed value
- $1,967,400
- Landmark / historic district
- No
Questions about 89 Grand Street
Who owns 89 Grand Street?
The owner of record in NYC Department of City Planning PLUTO data is Ptse Property Holdings LLC.
Does 89 Grand Street have violations?
NYC HPD has no housing violations on record for this property.
Is 89 Grand Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 89 Grand Street built?
City records list 2013 as the year it was built.
How many apartments are in 89 Grand Street?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.