roofy

121 North 1 Street

Brooklyn, NY 11249BBL 3-02365-0036Map

Owner of record: Mardi Land Corp.

121 North 1 Street is a two-family home built in 2017 in Brooklyn, 11249. It has 2 residential units across 4 floors. The owner of record is Mardi Land Corp.. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
0
ECB violations
16
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 0

No DOB violations on record

ECB violations · 16

  • Class - 2

    3303.4.1.1 sidewalk not maintained. at time of inspection of a 4 storynew building i observed that in the front of the sidewalk was badly cracked creating a hazard and tripping condition or fall incident for pe

    Apr 18, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard adjacent property affected by construction operation. at time of inspection observed active 4 sty new bldg w/no protection of adjacent property roof.(123 n 1st)at exp#4. exp#4 is not sealed

    Apr 25, 2016 · Penalty $10,000

    Resolve
  • Class - 2

    Sec. 3307.6;27-1021 sidewalk shed does not meet code specifications. at time of inspection observed no overhead lighting at sidewalk shed. remedy: comply w/code specification.

    Apr 25, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3307.6.5 sidewalk shed-materials/debris storage on the shed. at time of inspection observed 2 pallets of stone veneer & debris on top of sidewalk shed w/no drawings permitting storage on shed. remedy: comp

    Apr 25, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3303.2.3.1 utilities. at time of inspection of active 4 sty new bldg observed no lighting at stairwells or throughout bldg. remedy: comply w/code.

    Apr 25, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3304.7 access. note: at the time of my inspection of a 4 sty new bldg at foundation & partial excavation(sqe)phase. i observed approx 5workers working approx 13feet below grade level in a partially excavat

    Sep 15, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3304.4.4 guardrail system. note: at the time of my inspection of a 4 sty bldg at foundation & partial excavation phase(soe). i observed that there were inadequate guardrails & in some location not at all.

    Sep 15, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3307.2.6.1 requirements for sidewalk,temporary walkways. note: atthe time of my inspection of a 4 sty bldg at foundation & partial excavated phase(s.q.e.)i observed sidewalk at exp#1 was block partially

    Sep 15, 2015

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. at time of inspection it was observed that the work pipe ofthe adjoining property was damage while the pile driving operation was

    Aug 6, 2015 · Penalty $2,400

    Resolve
  • Hazardous

    Sec 27-1026 failure to maintain weatherproof integrity of adjacent property at time of inspection as noted 1 story bldg down no one on site. adjacent property west or job site has not been weatherproof. lots of

    Jun 19, 2008 · Penalty $2,000

    Resolve
Show 6 more ↓
  • Hazardous

    27-194 permit not posted @ the time of inspection no demolition & fence permit posted rem: post all permit as per dob code

    Jun 19, 2008 · Penalty $250

    Resolve
  • Hazardous

    Job site fence defective. defect noted: 8ft high plywood construction fence erected at 3 sides of demo. job #302391258, an approx. 20"long section of the fence at rear side collapsed to the ground leaving the s

    Mar 27, 2008 · Penalty $500

    Resolve
  • Hazardous

    Sec. 27-1026(d). failure to maintain weatherproof integrity of adjoining property - upon inspection as noted the adjoining property on the west of job site has been exposed. the wall needs parging to maintain

    Feb 25, 2008 · Penalty $500

    Resolve
  • Hazardous

    Fail to safeguard public & property.upon inps.demo of 2stry bldg in progress.at time of insp. no overhead protec.has been provided on the back yrd of the property.at rear pieces of brcks, blocks & concrete fall

    Jan 9, 2008 · Penalty $1,500

    Resolve
  • Non-hazardous

    Sc27-194 no posted permit upon insp.2 stry bldg has been demolshd, debris at site .no demo permit for the house has been posted. rmd:post all permits inplan view at all times for public view and inspection.

    Jan 9, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    No contractors sign posted upon insp, demo work of 2stry bldg in progress debris at site.no contrctor's sign has been posted w contractor's name,full add,and zip code.rmd:provide contractor's sign w name add&zi

    Jan 9, 2008 · Penalty $800

    Resolve

Complaints

  • Heating

    Heat related

    Dec 14, 2005 · Apt 1

    Close
  • General

    Windows

    Dec 14, 2005 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
2017
Floors
4
Residential units
2
Building area
3,920 ft²
Lot area
1,525 ft²
Zoning
R6A
Community board
301
Council district
34
Block / lot
2365 / 36
Assessed value
$247,320
Landmark / historic district
No

Questions about 121 North 1 Street

Who owns 121 North 1 Street?

The owner of record in NYC Department of City Planning PLUTO data is Mardi Land Corp..

Does 121 North 1 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 121 North 1 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 121 North 1 Street built?

City records list 2017 as the year it was built.

How many apartments are in 121 North 1 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.