186 North 6 Street
Brooklyn, NY 11211BBL 3-02336-0018Map
Owner of record: 186n6 Owner LLC
186 North 6 Street is an elevator apartment building built in 1920 in Brooklyn, 11211. It has 40 residential units across 5 floors. The owner of record is 186n6 Owner LLC. HPD has recorded 24 housing violations here, most recently on July 22, 2026. 7 of the 24 most recent violations are still open.
- HPD violations
- 24
- DOB violations
- 18
- ECB violations
- 27
- HPD complaints
- 53
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 301, 2nd story, 1st apartment from north at east
Jul 22, 2026 · Apt 301
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchen located at apt 301, 2nd story, 1st apartment from north at east
Jul 22, 2026 · Apt 301
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 301, 2nd story, 1st apartment from north at east
Jul 22, 2026 · Apt 301
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 301, 2nd story, 1st apartment from north at east
Jul 22, 2026 · Apt 301
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at east wall in the kitchen located at apt 301, 2nd story, 1st apartment from north at east
Jul 22, 2026 · Apt 301
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 301, 2nd story, 1st apartment from west at north
Jan 6, 2026 · Apt 301
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east at north located at apt 301, 2nd story, 1st apartment from west at north
Jan 6, 2026 · Apt 301
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 301, 2nd story, 1st apartment from west at north
Jan 6, 2026 · Apt 301
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east at north located at apt 301, 2nd story, 1st apartment from west at north
Jan 6, 2026 · Apt 301
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cement intermediate landing at building front at stoop
Jan 5, 2026
Closed — Violation dismissed
Show 14 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 20, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 3, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 3, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 13, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 13, 2023
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 13, 2023
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jan 13, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Jan 13, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall
Jan 13, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 13, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 1, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2018
Closed — Violation dismissed
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2021
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 21, 2020
Vp*-violation unserved ecb- dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 8 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed
ECB violations · 27
- Class - 2
Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 35676765j., file a certificate of correction
Nov 3, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction with department of building for summons 35676858z., file a certificate of correction
Nov 3, 2025
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records for summons 35676857r. apartment 503 still have four (4) single room occupancy without an updated/valid certifi
Nov 3, 2025
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024
Resolve - Class - 1
Failure to provide access to commissioner representative to perform their duties for complaint 3954037 noted management alex and sergei from"outpost" management denied access to building to the inspector to per
Apr 24, 2024 · Penalty $2,500
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy no#320910911 which indicates class a apartments units in each apartment.illegal occupancy noted:apartment 503(5th floor)has been converted into
Apr 16, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to provide a fire alarm system for single room occupancy in apartment 503(5th floor).rem:discontinue illegal use.
Apr 16, 2024
Resolve - Class - 1
No construction super. at the time of my inspection at a 4 story building under const i observed no superintendent/competent person on site.i waited for 30 min but super or comp person did not show up. remedy:p
Sep 21, 2020 · Penalty $10,000
Resolve - Class - 1
Contructor's license expired. at the time of my inspection at a 4 sty bldg under construction,i observed construction activities on 1st,2nd & 4th fl. upon research on bis i saw that the general contractors lice
Sep 21, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to notify the department of an accident or incident that resulted in fatality or injury.a worker suffered knee injuries when he fallfrom a ladder amulance was call and taken to hospital.as per check of
May 12, 2020 · Penalty $5,000
Resolve
Show 17 more ↓
- Class - 2
Bc 3314.1 failure to maintain supported scaffold as per code.note:at time of my inspection of an active jobsite under alteration construction of 6 story building.i observed a supported scaffold at exposure#2.i
Mar 16, 2020 · Penalty $620
Resolve - Class - 2
Failure to notify the department of a fire incident note:at time of myinvestigation and response to complaint#3746949 and upon my inspectioni observed that there was no notification given to the department abou
Mar 16, 2020
Resolve - Class - 2
Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section note:at time of inspection i observed sws in place missing information panel.rem:comply wit
Mar 16, 2020
Resolve - Class - 1
Construction superintendent failed to immediately notify the dept of conditions as required. note: at time of inspection i discovered that the superintendent of jobsite 1876 n 6th st. failed to notify the dept
Mar 16, 2020
Resolve - Class - 1
Failure to maintain/display required on site documents.at time of inspection of a 6 story alt1 i observed temporary platforms a 1st story homemade/fabricated from plywood and lumber upon request for design draw
Mar 9, 2020 · Penalty $1,250
Resolve - Class - 1
Bc330910-failure to provide roof protection for adjacent property.at time of inspection of a 6 story alt1 i observed exterior work and supported scaffold at exp#2&4 above adjacent property and no roof protectio
Mar 9, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard public and property-no overhead protection.at time of inspection of a 6 story alt1 currently at roof level i observed supported pipe scaffold erected at exp#2&4 above adjacent property back
Mar 9, 2020 · Penalty $5,000
Resolve - Class - 2
Sidewalk shed/pedestrian protection does not meet code specifications.at time of inspection of a 6 story alt1 i observed sidewalk shed at exp#1 does not extend additional 5 feet at exp#2&4 as required by bc3307
Mar 9, 2020 · Penalty $2,400
Resolve - Class - 1
Work does not conform to approved construciton docs and/or approved amendments-pe drawing.at the time of my inspection i observed a platforminstalled above @ the entrance exp3 upon mu review of the p drawing it
Jan 4, 2020 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction documents-site safety plan. at time of inspection on a 6 sty alteration site observed at exp#2 adjacent property-182 north 6 street-roof covered by scaffold planks
Dec 4, 2019
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. at time of inspection on a 6 sty alteration site observed at exp#2(2 means of egress for adjacent property-584 driggs ave unity
Dec 4, 2019 · Penalty $5,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. while passing 186 north 6 street exp#3 observed construction operations in progress & a full crew of workers on site working against a full stop
Dec 4, 2019
Resolve - Class - 2
Construction superintendnet failed to perform duties. as per code. at time of inspection i observed proposed alteration of 5 story building with work activity present. i also observed superitendent failed to
Jun 11, 2019 · Penalty $2,500
Resolve - Non-hazardous
Operation of place of assembly without current permit. basement cafe- teria. remedy: obtain permit for p.a.
Feb 17, 1999 · Penalty $500
Resolve - Non-hazardous
Operation of a place of assembly without a current permit. basement arranged to be occupied by more than 75 persons. remedy;obtain a pa. permit.
Aug 3, 1993 · Penalty $500
Resolve - Non-hazardous
Operation of a place of assembly without a current permit. remedy: obtain a p.a. permit. emergency lights inadequate. no emergency lights installed on entire p.a. space. remedy: file for p.a. plan
Jan 27, 1992 · Penalty $285
Resolve - Non-hazardous
Failure to maintian exterior building wall. cement trim fell from above 3rd floor window at street front
Mar 30, 1989
Resolve
Complaints
- Water leak
Slow leak
Sep 8, 2026 · Apt TH101
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt TH101
Close - Water leak
Slow leak
Sep 8, 2026 · Apt TH101
Close - Safety
Smoke detector
Sep 8, 2026 · Apt TH101
Close - Unsanitary condition
Sewage
Sep 8, 2026 · Apt TH101
Close - Unsanitary condition
Pests
Sep 8, 2026 · Apt TH101
Close - Unsanitary condition
Pests
Sep 8, 2026 · Apt TH101
Close - Safety
Carbon monoxide detector
Sep 8, 2026 · Apt TH101
Close - Flooring/stairs
Floor
Sep 8, 2026 · Apt TH101
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt TH101
Close
Show 40 more ↓
- Flooring/stairs
Floor
Sep 8, 2026 · Apt TH101
Close - Water leak
Damp spot
Jul 29, 2026 · Apt 301
Close - Water leak
Slow leak
Jul 29, 2026 · Apt 301
Close - Unsanitary condition
Mold
Jul 20, 2026 · Apt 301
Close - Paint/plaster
Wall
Jul 20, 2026 · Apt 301
Close - Heat/hot water
Apartment only
Jul 20, 2026 · Apt 301
Close - Water leak
Slow leak
Jul 13, 2026 · Apt 301
Close - Water leak
Damp spot
Jul 13, 2026 · Apt 301
Close - Paint/plaster
Ceiling
Jul 13, 2026 · Apt 301
Close - Door/window
Window frame
May 16, 2026 · Apt 207
Close - Door/window
Door
Mar 24, 2026 · Apt 301
Close - Door/window
Door
Mar 20, 2026 · Apt 301
Close - Door/window
Door
Jan 5, 2026 · Apt 301
Close - Paint/plaster
Ceiling
Jan 5, 2026 · Apt 301
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt 301
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt 301
Close - Heat/hot water
Apartment only
Mar 8, 2025 · Apt 504
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 204
Close - Door/window
Door frame
Dec 6, 2024 · Apt 204
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt BLDG
Close - Door/window
Door
May 15, 2024 · Apt 102
Close - Water leak
Heavy flow
Feb 26, 2024 · Apt 502
Close - Heat/hot water
Entire building
Oct 1, 2023 · Apt TH101
Close - Heat/hot water
Entire building
Apr 23, 2023 · Apt 106
Close - Heat/hot water
Apartment only
Jan 16, 2023 · Apt 106
Close - Heat/hot water
Apartment only
Jan 12, 2023 · Apt 106
Close - Heat/hot water
Entire building
Dec 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 30, 2022 · Apt 106
Close - Safety
Smoke detector
Nov 30, 2022 · Apt 106
Close - Heat/hot water
Entire building
Nov 30, 2022 · Apt 106
Close - Plumbing
Water supply
Nov 30, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2022 · Apt UNIT30
Close - Heat/hot water
Entire building
Nov 29, 2022 · Apt ALLUNI
Close - Heat/hot water
Entire building
Nov 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2022 · Apt 106
Close - Plumbing
Water supply
Nov 29, 2022 · Apt 106
Close - Plumbing
Water supply
Nov 29, 2022 · Apt 106
Close - Heat/hot water
Apartment only
Nov 29, 2022 · Apt 106
Close - Heat/hot water
Entire building
Nov 25, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D5)
- Year built
- 1920
- Floors
- 5
- Residential units
- 40
- Building area
- 47,660 ft²
- Lot area
- 21,675 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 34
- Block / lot
- 2336 / 18
- Assessed value
- $9,386,100
- Landmark / historic district
- No
HPD registration #389663, last renewed Jun 23, 2026.
Questions about 186 North 6 Street
Who owns 186 North 6 Street?
The owner of record in NYC Department of City Planning PLUTO data is 186n6 Owner LLC.
Does 186 North 6 Street have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 186 North 6 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 186 North 6 Street built?
City records list 1920 as the year it was built.
How many apartments are in 186 North 6 Street?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.