153 Berry Street
Brooklyn, NY 11249BBL 3-02335-0003Map
Owner of record: 153 Berry Premium LLC
153 Berry Street is a store building built in 2022 in Brooklyn, 11249. The owner of record is 153 Berry Premium LLC. HPD has recorded 9 housing violations here, most recently on September 2, 2004.
- HPD violations
- 9
- DOB violations
- 14
- ECB violations
- 16
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- CImmediately hazardous
Provide hot water at all hot water fixtures kitchen and bathroom, 1st story apartment #1.
Sep 2, 2004
Closed — Violation closed - BHazardous
Provide hot water at all hot water fixtures 2 sty. apt.
Sep 2, 2004
Closed — Violation closed - BHazardous
Provide gas to 2 sty. apt.
Sep 2, 2004
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at 2 sty. apt.
Sep 2, 2004
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at 2 sty. apt.
Sep 2, 2004
Closed — Violation closed - BHazardous
Provide gas to boiler at 2 sty. apt.
Sep 2, 2004
Closed — Violation closed - BHazardous
Provide hot water at all hot water fixtures 2nd story apartment.
Sep 2, 2004
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures kitchen & bathroom fixtures 2nd sty apt.
Sep 2, 2004
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures basement apt er1.
Sep 2, 2004
Closed — Violation closed
DOB building violations · 14
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Construction other optional
Borough comm. has order all work stpopped immediately under permit #321576969 due to contractor withdrawal/remedy:stop all work make site safe
Mar 12, 2020
Dob violation - dismissed - Construction other optional
Borough comm. has ordered all work stopped immediately under permit#32 1576969 due to contract withdrawal/remedy: stop all work make site saf e
Mar 12, 2020
Dob violation - dismissed - Construction other optional
Borough comm. has ordered vall work stopped under permit#320954865 due to contractor's withdrawal/stop all work make site safe
Mar 12, 2020
Dob violation - dismissed - Construction other optional
Borough comm. has ordered all work stopped under permit#320954865 due to contractor withdrawal
Mar 12, 2020
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 16
- Class - 2
Pedestrian protection doesnt meet code specs-sw.atoi of ongoing const on 2sty topped off commercial use bldg i observed@exp1 sw broken up w/uneven surface causing trip hazard to all who walk past jobsite.repair
Mar 16, 2022 · Penalty $625
Resolve - Class - 2
Failure to provide approved/accepted construction documents at job site at time of inspection. noted at time of inspection of a building under const,inspection team from dob requested d.o.b. const documents and
Mar 16, 2022 · Penalty $312
Resolve - Class - 2
Site conditions contrary to plan(ssp)at the time of inspection at a 2 story new building jobsite,i observed active jobsite with designated cp present at site.upon review of ssp for proposed jobsite,i noted exis
Jan 24, 2022 · Penalty $625
Resolve - Class - 1
337.2.1 dot permit.at the time of inspection at a 2 story new buildingjobsite,i observed active jobsite with designated competent person present at site.upon request for dot permit for existing installed fence
Jan 24, 2022 · Penalty $625
Resolve - Class - 1
3307.6.4.9 sws blocking street signage.at time of inspection of a 2 story new building jobsite,i observed sws installed in place on sidewalkexp1.i noted sws blocking street signage.code stipulates sws shall not
Jan 24, 2022 · Penalty $625
Resolve - Class - 1
3314.8 guardrails(scaffold)at the time of inspection of a 2 story new building jobsite with designated cp present at site,i observed existing installed pipe scaffold in place at exp2 and 4 close to the rear wit
Jan 24, 2022 · Penalty $2,500
Resolve - Class - 1
3314.5 scaffold(platform construction)at the time of inspection of a 2story new building jobsite with designated cp present at site,i observed existing installed pipe scaffold in places of exp2 and 4 close to r
Jan 24, 2022 · Penalty $2,500
Resolve - Class - 1
Bc330914-failure to protect windows(per code)for adjacent property.note:at the time of my inspection of a 2 story building at 2nd floor level under construction.i observed 2nd floor level exposure 2 adjacent pr
Nov 8, 2021 · Penalty $625
Resolve - Class - 1
Failure to institute safety equipment measures-no guardrails.note:at the time of inspection of a 2 story building and 2nd floor level,under construction-i observed 2nd floor level perimeter edge side not provid
Nov 8, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3307.4.3 failure to maintain barriers as per code atoi on inactive 2stynb const site,notice@exp1 storage/material zone that contractor failed to maintain as per code,barriers werent enclosed fully to ensure p
Nov 6, 2021 · Penalty $2,500
Resolve
Show 6 more ↓
- Class - 2
Work does not conform to approved construction documents and/or approval amendment.as noted:at time of inspection at an active jobsite observed at exposure#1 foundation wall f1 show rebars to 4 and 80 hour and
Sep 29, 2021
Resolve - Class - 2
Bc 3301.2 failure to provide safety measures and standards. at time ofinspection of active construction on a proposed 2 story new building at excavation/foundation phase i observed multiple workers at exposure
Jul 26, 2021
Resolve - Class - 2
Jobsite fence not const or maintained as pursuant to subsec noted:@time of my insp of new 2stybldg job not started site backfilled to grade,site closed@time of insp,i observed jobsite fence wasnt maintained&had
Apr 28, 2021
Resolve - Class - 2
Temporary construction equipment onsite-expired permit. temporary construction fence expired 4/12/19. at the time of my inspection,i observed temporary construction fence permit#320954865 expired. remedy:renew
Jul 29, 2019
Resolve - Class - 2
Work w/o a permit(construction plywood fence permit expired)as noteed:at time of inspection construction site was closed.observed const.plywood fence permit has expired on 04/12/19 permit#320954865-01-eq-fn.rem
Jun 4, 2019
Resolve - Class - 2
Failure to maintain bldg in code compliant manner noted at exp 1 the railings of the bldg are broke and had been removed creating hazardous conditions for pedestrians to fall into a open gap approx 4ft deep
Jun 29, 2009 · Penalty $500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K2)
- Year built
- 2022
- Floors
- 2
- Residential units
- —
- Building area
- 5,960 ft²
- Lot area
- 2,500 ft²
- Zoning
- M1-2/R6A
- Community board
- 301
- Council district
- 34
- Block / lot
- 2335 / 3
- Assessed value
- $870,300
- Landmark / historic district
- No
Questions about 153 Berry Street
Who owns 153 Berry Street?
The owner of record in NYC Department of City Planning PLUTO data is 153 Berry Premium LLC.
Does 153 Berry Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 153 Berry Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 153 Berry Street built?
City records list 2022 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.