roofy

153 Berry Street

Brooklyn, NY 11249BBL 3-02335-0003Map

Owner of record: 153 Berry Premium LLC

153 Berry Street is a store building built in 2022 in Brooklyn, 11249. The owner of record is 153 Berry Premium LLC. HPD has recorded 9 housing violations here, most recently on September 2, 2004.

HPD violations
9
DOB violations
14
ECB violations
16
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Sep 2, 2004

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 9

  • C

    Provide hot water at all hot water fixtures kitchen and bathroom, 1st story apartment #1.

    Sep 2, 2004

    Closed — Violation closed
  • B

    Provide hot water at all hot water fixtures 2 sty. apt.

    Sep 2, 2004

    Closed — Violation closed
  • B

    Provide gas to 2 sty. apt.

    Sep 2, 2004

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures at 2 sty. apt.

    Sep 2, 2004

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures at 2 sty. apt.

    Sep 2, 2004

    Closed — Violation closed
  • B

    Provide gas to boiler at 2 sty. apt.

    Sep 2, 2004

    Closed — Violation closed
  • B

    Provide hot water at all hot water fixtures 2nd story apartment.

    Sep 2, 2004

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures kitchen & bathroom fixtures 2nd sty apt.

    Sep 2, 2004

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures basement apt er1.

    Sep 2, 2004

    Closed — Violation closed

DOB building violations · 14

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed
  • Construction other optional

    Borough comm. has order all work stpopped immediately under permit #321576969 due to contractor withdrawal/remedy:stop all work make site safe

    Mar 12, 2020

    Dob violation - dismissed
  • Construction other optional

    Borough comm. has ordered all work stopped immediately under permit#32 1576969 due to contract withdrawal/remedy: stop all work make site saf e

    Mar 12, 2020

    Dob violation - dismissed
  • Construction other optional

    Borough comm. has ordered vall work stopped under permit#320954865 due to contractor's withdrawal/stop all work make site safe

    Mar 12, 2020

    Dob violation - dismissed
  • Construction other optional

    Borough comm. has ordered all work stopped under permit#320954865 due to contractor withdrawal

    Mar 12, 2020

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 4 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 16

  • Class - 2

    Pedestrian protection doesnt meet code specs-sw.atoi of ongoing const on 2sty topped off commercial use bldg i observed@exp1 sw broken up w/uneven surface causing trip hazard to all who walk past jobsite.repair

    Mar 16, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at job site at time of inspection. noted at time of inspection of a building under const,inspection team from dob requested d.o.b. const documents and

    Mar 16, 2022 · Penalty $312

    Resolve
  • Class - 2

    Site conditions contrary to plan(ssp)at the time of inspection at a 2 story new building jobsite,i observed active jobsite with designated cp present at site.upon review of ssp for proposed jobsite,i noted exis

    Jan 24, 2022 · Penalty $625

    Resolve
  • Class - 1

    337.2.1 dot permit.at the time of inspection at a 2 story new buildingjobsite,i observed active jobsite with designated competent person present at site.upon request for dot permit for existing installed fence

    Jan 24, 2022 · Penalty $625

    Resolve
  • Class - 1

    3307.6.4.9 sws blocking street signage.at time of inspection of a 2 story new building jobsite,i observed sws installed in place on sidewalkexp1.i noted sws blocking street signage.code stipulates sws shall not

    Jan 24, 2022 · Penalty $625

    Resolve
  • Class - 1

    3314.8 guardrails(scaffold)at the time of inspection of a 2 story new building jobsite with designated cp present at site,i observed existing installed pipe scaffold in place at exp2 and 4 close to the rear wit

    Jan 24, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    3314.5 scaffold(platform construction)at the time of inspection of a 2story new building jobsite with designated cp present at site,i observed existing installed pipe scaffold in places of exp2 and 4 close to r

    Jan 24, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Bc330914-failure to protect windows(per code)for adjacent property.note:at the time of my inspection of a 2 story building at 2nd floor level under construction.i observed 2nd floor level exposure 2 adjacent pr

    Nov 8, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to institute safety equipment measures-no guardrails.note:at the time of inspection of a 2 story building and 2nd floor level,under construction-i observed 2nd floor level perimeter edge side not provid

    Nov 8, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3307.4.3 failure to maintain barriers as per code atoi on inactive 2stynb const site,notice@exp1 storage/material zone that contractor failed to maintain as per code,barriers werent enclosed fully to ensure p

    Nov 6, 2021 · Penalty $2,500

    Resolve
Show 6 more ↓
  • Class - 2

    Work does not conform to approved construction documents and/or approval amendment.as noted:at time of inspection at an active jobsite observed at exposure#1 foundation wall f1 show rebars to 4 and 80 hour and

    Sep 29, 2021

    Resolve
  • Class - 2

    Bc 3301.2 failure to provide safety measures and standards. at time ofinspection of active construction on a proposed 2 story new building at excavation/foundation phase i observed multiple workers at exposure

    Jul 26, 2021

    Resolve
  • Class - 2

    Jobsite fence not const or maintained as pursuant to subsec noted:@time of my insp of new 2stybldg job not started site backfilled to grade,site closed@time of insp,i observed jobsite fence wasnt maintained&had

    Apr 28, 2021

    Resolve
  • Class - 2

    Temporary construction equipment onsite-expired permit. temporary construction fence expired 4/12/19. at the time of my inspection,i observed temporary construction fence permit#320954865 expired. remedy:renew

    Jul 29, 2019

    Resolve
  • Class - 2

    Work w/o a permit(construction plywood fence permit expired)as noteed:at time of inspection construction site was closed.observed const.plywood fence permit has expired on 04/12/19 permit#320954865-01-eq-fn.rem

    Jun 4, 2019

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner noted at exp 1 the railings of the bldg are broke and had been removed creating hazardous conditions for pedestrians to fall into a open gap approx 4ft deep

    Jun 29, 2009 · Penalty $500

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Store building (K2)
Year built
2022
Floors
2
Residential units
—
Building area
5,960 ft²
Lot area
2,500 ft²
Zoning
M1-2/R6A
Community board
301
Council district
34
Block / lot
2335 / 3
Assessed value
$870,300
Landmark / historic district
No

Questions about 153 Berry Street

Who owns 153 Berry Street?

The owner of record in NYC Department of City Planning PLUTO data is 153 Berry Premium LLC.

Does 153 Berry Street have violations?

Yes. NYC HPD has recorded 9 housing violations at this property.

Is 153 Berry Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 153 Berry Street built?

City records list 2022 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.