510 Driggs Avenue
Brooklyn, NY 11211BBL 3-02312-7501Map
Owner of record: Driggs Partners LLC
510 Driggs Avenue is a condominium built in 2020 in Brooklyn, 11211. It has 44 residential units across 6 floors. The owner of record is Driggs Partners LLC. HPD has recorded 12 housing violations here, most recently on August 24, 2026. 10 of the 12 most recent violations are still open.
- HPD violations
- 12
- DOB violations
- 1
- ECB violations
- 8
- HPD complaints
- 16
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 6th story
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 3rd apartment from north at east
Jul 5, 2026 · Apt 3D
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Open — Info nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of a unacceptable electromagnetic locking device installed at building vestibule door , 1st story
May 24, 2025
Closed — Violation closed - BHazardous
Provide security in the event of a power outage by means of an approved heavy duty lock and latch-set at building vestibule door , 1st story
May 24, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 24, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
May 24, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box
May 24, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
May 24, 2025
Open — Nov sent out
Show 2 more ↓
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
May 24, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor
May 24, 2025
Open — Nov sent out
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed
ECB violations · 8
- Class - 2
Work without permit. noted: electrical work was done on illuminated sign that reads:"the learning experience" without a valid permit., obtain all permits
Nov 12, 2025
Resolve - Class - 2
Work without permit. noted: illuminated sign approx: 6'x 3' reads:"the learning experience", has yellow & pink lettering and is mounted to the facade was installed without a valid permit., obtain all permits
Nov 12, 2025
Resolve - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.note:at time of inspection at above premise observed construction debris,dust and materials throughout commercial space.several extension cords
Apr 26, 2023 · Penalty $2,500
Resolve - Class - 1
28-201.1 tenant protection plan inadequate for scope of work.note at time of inspection observed work performed under the aforementioned jobnumber.the submitted tpp lacks specific means and methods and it not j
Apr 4, 2023 · Penalty $625
Resolve - Class - 1
Observed inadequate work or storage zone next to sidewalk shed at exp 1 with approx. 10ft section along sidewalk missing 4ft solid barrier and wire mesh enclosed to the top of sidewalk shed to protect pedestria
Jul 16, 2022 · Penalty $2,500
Resolve - Class - 1
Inadequate/missing guardrails. observed missing guardrails at 5th fl setback,exp#2 parapet,creating an unsafe fall hazard. remedy: maintain installa guardrails as per code.
Mar 6, 2022 · Penalty $2,500
Resolve - Class - 1
Bc 3303.2.3 failure to maintain equipment observed uncovered/open electrical panel box,taled cords for temporary lighting and this use of heathers not connected to gfi outlets on 5th floor throughout.rem:mainta
Mar 6, 2022 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Aug 22, 2026 · Apt BLDG
Close - Unsanitary condition
Sewage
Jul 5, 2026 · Apt 2H
Close - Heat/hot water
Entire building
Jul 4, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 19, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt 3E
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2026 · Apt BLDG
Close
Show 6 more ↓
- General
Cooking gas
Jan 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2026 · Apt 2E
Close - Heat/hot water
Entire building
May 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 18, 2025 · Apt 5B
Close - Heat/hot water
Entire building
May 18, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 20, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2020
- Floors
- 6
- Residential units
- 44
- Building area
- 98,078 ft²
- Lot area
- 20,000 ft²
- Zoning
- M1-2/R6A
- Community board
- 301
- Council district
- 33
- Block / lot
- 2312 / 7501
- Assessed value
- $13,380,565
- Landmark / historic district
- No
HPD registration #391234, last renewed Sep 6, 2024.
Questions about 510 Driggs Avenue
Who owns 510 Driggs Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Driggs Partners LLC.
Does 510 Driggs Avenue have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 510 Driggs Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 510 Driggs Avenue built?
City records list 2020 as the year it was built.
How many apartments are in 510 Driggs Avenue?
It has 44 residential units and 73 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.