659 Flushing Avenue
Brooklyn, NY 11206BBL 3-02272-0055Map
Owner of record: 659 Flushing Estate LLC
659 Flushing Avenue is a walk-up apartment building built in 2023 in Brooklyn, 11206. It has 3 residential units across 6 floors. The owner of record is 659 Flushing Estate LLC. HPD has recorded 8 housing violations here, most recently on December 23, 2011.
- HPD violations
- 8
- DOB violations
- 0
- ECB violations
- 12
- HPD complaints
- 24
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Dec 23, 2011 · Apt 2FL
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story
Dec 23, 2011 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color -- east and west wall in the kitchen located at apt 2fl, 2nd story
Dec 23, 2011 · Apt 2FL
Closed — Violation closed - BHazardous
Replace with new the broken or defective -- glass lower sash at east window in the 3rd room from north located at apt 3, 3rd story
Dec 23, 2011 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the missing -missing inner glass at lower sash window in the kitchen located at apt 3, 3rd story
Dec 23, 2011 · Apt 3
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in -- waste line at bathtub in the bathroom located at apt 3, 3rd story
Dec 23, 2011 · Apt 3
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 3, 3rd story
Dec 23, 2011 · Apt 3
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder lock key operated installed at entrance door to 2nd sty apt 2.
Nov 19, 2005
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 12
- Class - 2
On exposure #1 and #3 from 1st till 5th floor were installed metal stud exterior walls contrary to en drawing,com/check and architectural drawing which is concrete block 6"., conform work to approved constructi
Dec 11, 2023 · Penalty $625
Resolve - Class - 1
Inspection of an incident where a personnel was partial buried at exposure 3 while excavating for plumbing pipes. failure to notify the department immediately of the incident.the department shall be notified im
Jul 18, 2023
Resolve - Class - 1
Inspection of an incident where personnel was buried at exposure 3 doing plumbing operations, failure to safeguard while trenching, observed no sloping, no bracing and no tight sheeting to protect the personnel
Jul 18, 2023
Resolve - Class - 1
Inspection of an incident where personnel was buried while excavating for plumbing operations. upon review of departmental records to show for compliance of notification of earthwork commencing, no notificatio
Jul 18, 2023
Resolve - Class - 1
At time of inspection of an incident, observed an electrical panel in the work site, reviewing departmental records to check for compliance, revealed that there was no electrical permit to have the electric pan
Jul 18, 2023
Resolve - Class - 1
At the time of inspection of an incident observed unsafe supported scaffolding, failure to maintain scaffolding as per code. supported scaffolding missing toe boards, no guard rails, decks not fully planked, an
Jul 18, 2023
Resolve - Class - 1
Inspection of an incident were personnel was buried. failure to safeguard the excavation for the plumbing work at exposure 3. observed no sloping, no bracing and tight sheeting to protect the personnel while ex
Jul 18, 2023 · Penalty $12,500
Resolve - Class - 1
At the time of demo signoff inspection requested by contractor, noted on bis and complaint section that no notification was submitted to the department of buildings as per code requirement prior to start of de
Feb 14, 2023
Resolve - Class - 1
Failure to safeguard all person and property affected by construction operation. noted:at time of inspection i observed at the above premises the installation of a const fence across the entire front of premise
Jun 7, 2021 · Penalty $10,000
Resolve - Non-hazardous
Failure to maintain hazardous. noted: approx. 2'x 3' area at east elevation of 3 story wood framed bldg at first floor level plywood sheeting has a hole and is cracked causing stair case at interior of bldg
Mar 9, 2006 · Penalty $800
Resolve
Show 2 more ↓
- Non-hazardous
Failure to maintain hazardous defect is improper installtion of boilervent piper in cellar chimney wall left open around vent piper causing a fire hazard. remedey: replace missing fire bricks on chimney wall
Jul 10, 1992 · Penalty $800
Resolve - Non-hazardous
Failure to mainta<in exterior building wall. defect is first sty frontloose and missing shingles leaving wall sheeting and frame exposed to weather. remedy: make all necessary repairs to the satisfaction of
Jul 10, 1992
Resolve
Complaints
- Heating
Heat related
Dec 21, 2011 · Apt 3
Close - Plumbing
Shower-stall
Dec 21, 2011 · Apt 3
Close - Nonconst
Vermin
Dec 21, 2011 · Apt 3
Close - General
Windows
Dec 21, 2011 · Apt 3
Close - General
Windows
Dec 21, 2011 · Apt 3
Close - Heating
Heat related
Dec 21, 2011 · Apt 3
Close - Heating
Heat related
Dec 21, 2011 · Apt 3
Close - General
Windows
Dec 21, 2011 · Apt 2FL
Close - Nonconst
Vermin
Dec 21, 2011 · Apt 2FL
Close - Paint/plaster
Wall
Dec 21, 2011 · Apt 2FL
Close
Show 14 more ↓
- Heating
Heat related
Dec 21, 2011 · Apt 2FL
Close - Heating
Heat related
Dec 12, 2011 · Apt 3
Close - Heating
Heat related
Dec 12, 2011 · Apt 3
Close - Heating
Heat related
Dec 12, 2011 · Apt 3
Close - General
Mold
Feb 19, 2011 · Apt 3
Close - Appliance
Electric/gas range
Feb 19, 2011 · Apt 3
Close - Nonconst
Vermin
Feb 19, 2011 · Apt 3
Close - Nonconst
Vermin
Feb 19, 2011 · Apt 3
Close - Plumbing
Water-leaks
Jun 19, 2007 · Apt 2
Close - Plumbing
Water-leaks
Jun 19, 2007 · Apt 2
Close - Nonconst
Vermin
Jun 19, 2007 · Apt 2
Close - Nonconst
Vermin
Jun 19, 2007 · Apt 2
Close - Heating
Heat related
Jan 15, 2004 · Apt 3
Close - Heating
Heat related
Jan 13, 2004 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2023
- Floors
- 6
- Residential units
- 3
- Building area
- 8,851 ft²
- Lot area
- 2,308 ft²
- Zoning
- R7A
- Community board
- 301
- Council district
- 33
- Block / lot
- 2272 / 55
- Assessed value
- $188,580
- Landmark / historic district
- No
HPD registration #391701, last renewed Jul 24, 2026.
Questions about 659 Flushing Avenue
Who owns 659 Flushing Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 659 Flushing Estate LLC.
Does 659 Flushing Avenue have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 659 Flushing Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 659 Flushing Avenue built?
City records list 2023 as the year it was built.
How many apartments are in 659 Flushing Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.