669 Kent Avenue
Brooklyn, NY 11249BBL 3-02197-0001Map
Owner of record: Central Congregations Of Yetev Lev D'sat Mar
669 Kent Avenue is a religious facility built in 1946 in Brooklyn, 11249. The owner of record is Central Congregations Of Yetev Lev D'sat Mar. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 15
- ECB violations
- 36
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 15
- Construction other optional
Applicant on record, alberto roman, pe#95364 surrendered all .filing privileges, therefore pursuant to ac 28-105.10.2 borough .commissioner has ordered all work stopped under job #b00630230-l1
Aug 20, 2022
Dob violation - active - Construction other optional
Applicant on record, alberto roman, pe#95364 surrendered all .filing privileges, therefore pursuant to ac 28-105.10.2 borough .commissioner has ordered all work stopped under job #b00630230-l1
Aug 20, 2022
Dob violation - active - Construction other optional
Failure to comply with commissioner's order #357105(081021feu30102pn) dated 8/10/2021 requesting owner to start permanent repairs of the bldg due to unpermitted partial demolition and excavation alont the front porttion of the bldg at exp1 along kent ave. remedy: immed comply with commissioner's order #357105(081021feu30102pn)
Jun 8, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Construction other optional
Structure rendered non compliant. at time of inspection at exposure 1, at cellar level, area approximately 60' x 30' has been excavated and concrete rubble piled, joists not stable and sections of drop ceiling hangs loose and is in danger of falling. vacate cellar area forthwith.
Aug 10, 2021
Dob violation - active
Show 5 more ↓
- Construction other optional
Ewo:exp1 1flr concr slab demo,w/out prmt.exp 1&2 found exp'd.exp 1,2,3 walls @front 30'-bldg partly remvd masn w/crk'd/unsuprtd sectns.sectns 1flr wd frmg inadq suprtd.ceil abve front sectn partly remvd and inadq suprtd.ownr retn nyspe&contr-immd shor inadq suprtd 1fl frmg.plac soil berm @exp'd fdn.brce+remv loose masn walls&ceil.pe superv.file 2 days
Aug 10, 2021
Dob violation - active - Construction other optional
Ftm bldg safe condn:exp1,1st fl slab area approx 56'wx30'd excav w/out prmt&proper suprt of excav.fdn's imprp exp'd.1fl wd frmg aprx 20'wx8'd inadq suprt'd.exp 1,2,3 inter sides-walls prtly rmvd,crckd,+loose.ceil prtly rmvd+loose.ownr to retn nyspe to prep+file repr drwgs.bldg to be permntly reprd under permt strt by 9/14/21+cmpltd/signoff by 10/29/21
Aug 10, 2021
Dob violation - active - Construction other optional
Due to unsafe electrical and unsafe gas lines. also observed unpermite d excasvation
Aug 9, 2021
Dob violation - active - Construction other optional
C-construction other optional
Sep 23, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 29, 2005
Vpw*-violation unserved ecb-work without permit-dismissed
ECB violations · 36
- Class - 2
At time of inspection on a 2 story building i observed no compliance from respondent for previously issued violation 039508625k issued on 11/2/22 for inadequate housekeeping. respondent failed to submit to the
Jan 13, 2023 · Penalty $6,250
Active - Class - 1
I observed closed site of a synagogue center. at exp2, fence, inside the building there is an extreme accumulation of combustible materials, consisting of wooden chairs, cardboard and plywood. hazard of fire ex
Nov 2, 2022
Resolve - Class - 1
Failure to comply w/commissioner's order contained in summons/v39045314p issued7/30/21 &to file c/c pursuant to28-201.1&1rcny102-01.no permit or app file to correct violating condition for work w/o permit compl
Jan 31, 2022 · Penalty $12,500
Resolve - Class - 2
Work doesn't conform to approved documents.at time of inspection of proposed 1 story building observed excavation area in back of building 10 feet from top of concrete slab plan under order #b00630230 for renov
Jan 20, 2022 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39045435l issued on 8/02/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for unlawfully continued
Sep 27, 2021
Resolve - Class - 1
I observed in gas meter area for synagogue removal of gas piping, and fittings due to an incident of excavation being performed without any authorization and no permits on file any work performed, obtain permit
Aug 10, 2021 · Penalty $2,500
Resolve - Class - 1
Prohibited material; i observed on top floor of synagogue gas piping hung several times with electric wire which is not the proper hangers and is prohibited and not code-complaint, repair and/replace
Aug 10, 2021 · Penalty $1,250
Active - Class - 2
Failure to properly connect conductors to terminals armored cables in basement not terminated. remedy: provide proper connections.
Aug 10, 2021 · Penalty $600
Resolve - Class - 2
Failure to secure support raceways cable assemblies boxes cabinets fitting. armored cables throughout not properly secured. remedy: secure support per ec.
Aug 10, 2021 · Penalty $400
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use. defective electrical outlets fixtures switches throughout bldg no power in bldg. remedy: comply w/ec co
Aug 10, 2021 · Penalty $400
Resolve
Show 26 more ↓
- Class - 1
I observed on top floor of synagogue several painted sprinkler heads throughout building which is prohibited and not code complaint since it will prevent proper fire protection of that area of building in case
Aug 10, 2021 · Penalty $1,250
Active - Class - 2
Electrical work w/o permit. observed at 10.30 feeders & panels installed from basement to various locations throughout bldg. no application on file for electrical work. remedy: obtain permit.
Aug 10, 2021 · Penalty $400
Resolve - Class - 2
Failure to provide cover face plate lamp holder luminaire canopy for electrical outlet. panel covers missing throughout. remedy: comply w/eccode.
Aug 10, 2021 · Penalty $250
Resolve - Class - 1
I observed in gas meter area for synagogue gas piping removed and open ended at time of inspection not capped and or plugged for safety which is prohibited and not code complaint as per fgc 404.13, i also obser
Aug 10, 2021 · Penalty $1,250
Active - Class - 1
Unlawfully continued work while on notice of a stop work order. observed premises open and one male working on site, slab removed by entrance on which wall at exp #1 is penetrated with new entrance. full swo #
Aug 2, 2021
Resolve - Class - 1
At 1st floor kent avenue side created wall penetration approx. 12'x10'. also observed floor slab removal and wall has been removed. inside the building where construction site observed two bobcat excavators. no
Jul 30, 2021 · Penalty $2,500
Resolve - Class - 2
Altered changed building occupied without a valid certificate of occupancy as per 28-118.3.1 -28-118.3.2 noted at 1st floor building is fully occupied as a study hall and synogogue. current dept of building rec
Feb 18, 2011 · Penalty $2,500
Resolve - Class - 1
Failure to comply with an order of the commissioner to obtain a permitper violations 334757160p building illegally converted to a community facility/synagogue under disapproved application #301896768. no has be
Jul 11, 2009 · Penalty $8,000
Active - Class - 1
Occupancy contrary to that allowed by building department records noted: legal occupancy is that of factory use,now illegally occupied as(gynagogue) throughout building no sign offs for illegal conversion note
Feb 12, 2009 · Penalty $12,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. defects noted: parapet wall improperly completed w/opening & exposed structural wood and metal frame unprotected from the elements, roof level. 2nd fl found
Jan 14, 2009
Resolve - Class - 1
Work w/o permit! illegal work noted: bldg found to be illegally converted to community facility synagogue under disapproved application #301896768 alt-1 w/o prior obtaining the required permits & approval from
Jan 14, 2009
Resolve - Hazardous
Occupancy contrary to that allowed by the bldg dob records which indicate that the bldg use is for industrial/manufacturer purpose bldg nowillegally converted for use as a community facility & synagogue.illega
Mar 27, 2008 · Penalty $2,000
Resolve - Hazardous
Occupancy contrarty to that allowed by the bldg dept records - hazardous. noted: from: factory (industrial) legal occupancy to: community facility synogogue illegal occupancy. also noted: job #301896768-01 alt
Oct 18, 2007 · Penalty $2,000
Resolve - Non-hazardous
Operation of place of assembly w/o a current permit. noted: job #301896768-01 alt 1on file for: proposed conversion of existing factory to community facility synagogue (job disapproved:3/11/05) & premises
Oct 18, 2007 · Penalty $1,250
Resolve - Non-hazardous
Altered bldg occupied w/o a valid c of o.noted:premises is occupied asa synagogue & religious academy.several adult males observed present.remedy:obtain a valid c of o(or amend existing co)or discontinue illega
Feb 15, 2007 · Penalty $880
Resolve - Non-hazardous
Occupancy contrary to bldg dept records. records indicate bldg to be legally approved for manufacturing. illegal occupancy noted:bldg converted at & occupied as synagogue. also noted alt type 1 301896768
Apr 29, 2006 · Penalty $400
Resolve - Non-hazardous
Operation of a place of assembly w/o a current permit. noted:synogoguewith occupancy of approx. 350 persons no current pa permit noted. noted:obtain a pa permit.
Apr 29, 2006 · Penalty $2,500
Resolve - Hazardous
Work w/o permit. upon inspection at the above property approx. 30' x 15' x 8' structure constructed at sidewalk and on to street. dept. record shows no permit issued. stop all work or use. remedy: obtain permit
Oct 29, 2005 · Penalty $2,500
Resolve - Non-hazardous
Altered bldg is being occupied w/o valid certificate of occupancy. bldg was altered from it's regular use of a factory, now being used for religious purposes. remedy: amend c of o or discontinue illegal use.
Sep 26, 2005 · Penalty $350
Resolve - Non-hazardous
Noted : (1) west elevation - loose & leaning outward upper section (approx 2' wide x 3' high ) middle brick pier ( north end) in danger of falling onto sidewalk; (2) south elevation - loose brick at upper south
Jun 16, 2005 · Penalty $2,000
Resolve - Hazardous
Failure to maintain: defect noted- severe vertical and horizontal stress cracks at west and south elevations (approx. 2 inch) various locations; also bulging bricks at parapet level. remedy: make all repairs.
Feb 28, 2005 · Penalty $2,000
Resolve - Non-hazardous
Failure to provide approved plan at premises at time of inspection. note construction in progress at site, with approx. 8 workers doing various task and no approved plans at site. stop all work. remedy: provide
Nov 15, 2004 · Penalty $130
Resolve - Non-hazardous
Occupancy contrary to that allowed by building department records. application alt 1 #301634435. disapproved on 9/19/03. from: legal factoryto: illegal school. noted location: 1st floor thru out noted:
Oct 19, 2004
Resolve - Non-hazardous
Failure to provide approved plans at premises at time of inspection. application: alt 2 #301650684 removal and installation of new partiitons noted location: 1st floor thru out, approx 90% complete. remedy:
Oct 19, 2004
Resolve - Hazardous
Failure to maintain exterior building walls. note. at south and west sides of building are vertical and horizontal cracks approx. 2" wide atvarious locations, with bulging bricks at parapet level at west side.
Oct 15, 2004 · Penalty $800
Resolve - Non-hazardous
Work wihout a permit.note:an illegal wood structure approx.65' longx20'widex10'high illegally erected at front of building.remedy:obtain a permit
Oct 7, 2004
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Religious facility (M1)
- Year built
- 1946
- Floors
- 1
- Residential units
- —
- Building area
- 23,428 ft²
- Lot area
- 13,705 ft²
- Zoning
- M1-2
- Community board
- 301
- Council district
- 33
- Block / lot
- 2197 / 1
- Assessed value
- $2,003,400
- Landmark / historic district
- No
Questions about 669 Kent Avenue
Who owns 669 Kent Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Central Congregations Of Yetev Lev D'sat Mar.
Does 669 Kent Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 669 Kent Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 669 Kent Avenue built?
City records list 1946 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.