192 Division Avenue is a mixed residential and retail building built in 1920 in Brooklyn, 11211. It has 2 residential units across 3 floors. The owner of record is Bais Yakov Yitzchok Trust. HPD has recorded 1 housing violation here, most recently on May 8, 2019. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 12
- ECB violations
- 11
- HPD complaints
- 4
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- CImmediately hazardous
Properly repair with similar material the broken or defective sloped wood floor at public hall, 2nd story
May 8, 2019
Open — Second no access to re-inspect violation
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Work without a permit; remedy; stop all work if feasible obtain all applicable permits before contact dob for reinspection
Sep 22, 2011
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active - Boiler boiler optional
4a/18b/36...back flow prevention valve missing
Dec 18, 1990
Dob violation - active
ECB violations · 11
- Class - 2
Work w/o a permit. noted: obseved new curb cut constructed to create vehicular access into vacant lot. the curb cut length is aprpx 8'l. (100% of work done). rmdy: obtain all permits.
Dec 29, 2018
Resolve - Class - 2
Occupancy contrary to that allowed by the cofo or building dept records. noted: entire building was demolished as per dob record #667-207080282 1982 and converted into vacant lot. however, observed 2 vehicles
Dec 29, 2018
Resolve - Class - 3
Fence exceeds permitted height. noted: at exp1 observed metal fence installed. however, the fences height is appr x11'h contrary to buildingcodes. "vacant lot" rmdy: conform fence to height requirement.
Dec 29, 2018
Resolve - Hazardous
4a, 19b, 49, 36. install back flow preventor.
Jan 30, 2001
Resolve - Non-hazardous
New building occupied at 1st floor fishstone without first obtaining a valid certificate of occupancy. remedy:discontuine illegal use or obtain a vlaid certificate.
Nov 20, 2000 · Penalty $2,500
Active - Hazardous
Plumbing work without a permit.at time of inspection observed new sprinkler piping fl 1-6 piping covered.rem:obtain a permit if feasible or restore to prior legal condition.
Sep 18, 2000 · Penalty $1,000
Active - Non-hazardous
New building occupied without a valid c/o upon inspection of above address building was occupied as a fish store on 1st floor. d.o.b record shows that no certificate of c of o was issued remedy:obtain valad c o
Aug 30, 2000 · Penalty $2,500
Active - Hazardous
No hand rails. from basement to 6th floor upon inspection i fund no hand rails at any of the stairways. also no guardrail at roof perimeter in front of building. remedy:provide hand rails as per code. provide g
Aug 30, 2000 · Penalty $5,000
Active - Hazardous
Failure to maintain adequate house keeping upon inspection of above address, 5th floor stair way was blocked with debris obstructing passage to additional floors. remedy:maintain adequate house keeping
Aug 30, 2000 · Penalty $1,000
Active - Hazardous
No handrails on stairwell upon inspection at above property building erected to 5 fl and were no handrails on stairwell. remedy:provide handrails as per code.
Jul 13, 2000 · Penalty $5,000
Active
Show 1 more ↓
- Non-hazardous
Failure to provide owner's/contractor's sign at the premises at time of inspection.remedy:post and maintain owner's/contractor's at premisesduring construction operations.note:300612978
Mar 15, 2000 · Penalty $1,000
Active
Complaints
- Unsanitary condition
Garbage/recycling storage
Oct 1, 2022 · Apt BLDG
Close - Plumbing
Water supply
Aug 6, 2006 · Apt 3L
Close - Heating
Heat related
Jul 3, 2006 · Apt 3L
Close - General
Doors
Jul 3, 2006 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 5,869 ft²
- Lot area
- 2,954 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2178 / 42
- Assessed value
- $574,200
- Landmark / historic district
- No
Questions about 192 Division Avenue
Who owns 192 Division Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bais Yakov Yitzchok Trust.
Does 192 Division Avenue have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 192 Division Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 192 Division Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 192 Division Avenue?
It has 2 residential units and 6 units in total.